Loading...
HomeMy WebLinkAbout0105127 B SHKOSH ON THE WATER .lob Address 208 W MELVIN AVE Designer Category CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner PHILIP G HILL Contractor OWNER 149 - Raze detached garage, construct detached garage No 105127 Create Date 11/04/2003 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~ Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation ~ Poured Concrete O Floating Slab ~ Pier ~ Other 12'x12" grade beam ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/Razing the existing detached garage and constructing a 24'x33' detached garage per the plans submitted. The garage will have storage of Work lrusses. This permit does not include the required electrical permit or for expanding the driveway. HVAC Contractor Electric Contractor Fees: Valuation Issued By: HOMEOWNER Plumbing Contractor $18,000.00 Plan Approval $0.00 Permit Fee Paid $83.00 Park Dedication $0.00 Date 11/04/2003 Final/O.P. 00/00/0000 Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address Agent/Owner Oshkosh WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.