HomeMy WebLinkAbout0105127 B SHKOSH
ON THE WATER
.lob Address 208 W MELVIN AVE
Designer
Category
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner PHILIP G HILL
Contractor OWNER
149 - Raze detached garage, construct detached garage
No 105127
Create Date 11/04/2003
Plan
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~ Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation ~ Poured Concrete O Floating Slab ~ Pier ~ Other
12'x12" grade beam
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature SFR/Razing the existing detached garage and constructing a 24'x33' detached garage per the plans submitted. The garage will have storage
of Work lrusses. This permit does not include the required electrical permit or for expanding the driveway.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
HOMEOWNER
Plumbing Contractor
$18,000.00 Plan Approval $0.00 Permit Fee Paid
$83.00 Park Dedication $0.00
Date 11/04/2003 Final/O.P. 00/00/0000
Permit Voided
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Address
Agent/Owner
Oshkosh
WI 54901 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.