Loading...
HomeMy WebLinkAbout0105119-BuildingOSHKOSH ON THE WATER .lob Address 500 S OAKWOOD RD Designer HGA CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner MERCY MEDICAL CENTER OSH INC Contractor CR MEYER Category 220 - Alteration Hospitals & Institutions No 105119 Create Date 11/03/2003 Plan J5-112-1003 Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~ Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation (~ Poured Concrete (~ Floating Slab (~ Pier (~ Other (~ Concrete Block (~ Post (~ Treated Wood Occupancy Permit Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 0 Use/Nature Hospital / Construction of Sleep Room on 5th floor of bed tower per plans approved by HFS. of Work HVAC Contractor UNKNOWN??? Electric Contractor UNKNOWN???? Fees: Valuation $22,647.00 Plan Approval Issued By: Plumbing Contractor UNKNOWN $0.00 Permit Fee Paid $104.00 Park Dedication $0.00 Date 11/04/2003 Final/O.P. 00/00/0000 Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 895W 20TH AVE OSHKOSH WI 54902 - 0000 Telephone Number 235-3350 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.