HomeMy WebLinkAbout0105119-BuildingOSHKOSH
ON THE WATER
.lob Address 500 S OAKWOOD RD
Designer HGA
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner MERCY MEDICAL CENTER OSH INC
Contractor CR MEYER
Category 220 - Alteration Hospitals & Institutions
No 105119
Create Date 11/03/2003
Plan J5-112-1003
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~ Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation (~ Poured Concrete (~ Floating Slab (~ Pier (~ Other
(~ Concrete Block (~ Post (~ Treated Wood
Occupancy Permit Required Flood Plain No Height Permit Not Required
Park Dedication Not Required # Dwelling Units 0 # Structures 0
Use/Nature Hospital / Construction of Sleep Room on 5th floor of bed tower per plans approved by HFS.
of Work
HVAC Contractor UNKNOWN???
Electric Contractor UNKNOWN????
Fees: Valuation $22,647.00 Plan Approval
Issued By:
Plumbing Contractor UNKNOWN
$0.00 Permit Fee Paid
$104.00 Park Dedication $0.00
Date 11/04/2003 Final/O.P. 00/00/0000
Permit Voided
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 895W 20TH AVE OSHKOSH WI 54902 - 0000 Telephone Number 235-3350
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.