HomeMy WebLinkAbout0105115-BuildingOSHKOSH
ON THE WATER
.lob Address 829 VINE AVE
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner PINE APARTMENTS I LLC
Contractor DUTCHMAN CONSTRUCTION
Category 140 - Interior Remodeling
No 105115
Create Date 11/04/2003
Plan
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature SFR/Remodeling the 2nd floor bathroom. No walls will be moved and drywall will be installed on two walls. A vapor barrier will be installed over
of Work lhe existing blown in insulation.
HVAC Contractor Plumbing Contractor JIM'S PLUMBING
Electric Contractor CUMINGS ELECTRIC
Fees: Valuation $1,500.00 Plan Approval $0.00 Permit Fee Paid $25.00 Park Dedication $0.00
Issued By: Date 11/04/2003 Final/O.P. 00/00/0000
Permit Voided
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Address 7400 JENSEN RD
Agent/Owner
OSHKOSH
WI 54904 - 0000 Telephone Number
235-6812/836-1759
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.