Loading...
HomeMy WebLinkAbout0103945-Plumbing (water heater)OSHKOSH ON THE WATER Job Address 1245 KENTUCKY ST Contractor SAMMONS PLUMBING CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner SCOTT T/AMY C RAMSAY Category 411 - Residential-Water Heaters No 103945 Create Date 09/05/2003 Plan Bathtub 0 Shower 0 Ejector/Grind Whirlpool 0 Floor Drain 0 Water Soffner Lavatory 0 Lndry Tray 0 Local Waste Toilet 0 Lndry Stndp 0 Clothes Wshr Res. Sink 0 Disposal 0 Bidet Bar Sink 0 Dishwasher 0 Beer Tap Water Heater 1. Sump Pump 0 Dent. Oper. Site Drain 0 Classrm Sink 0 LabSink Roof Drain 0 Breakrm Sink 0 Sterilizer Use/Nature -~FR/rnstall gas water heater. of Work 0 Dip Well 0 F Prep Sink 0 DrinkFtn 0 ServSink 0 Wait. St. 0 ShampSink 0 Ice Chest 0 FIr/Wst Sink 0 Exam Sink 0 Catch Basin 0 SculrySink 0 Wash Ftn 0 Hand Sink 0 Urinal 0 Plaster Sink 0 Standp Rec 0 Surgeons Sink 0 Ica Maker 0 Gar Drain 0 0 Soda Disp 0 0 Coffee Maker 0 0 Int GreaseTrap 0 0 Ext Grease Trap 0 0. RPZ Valve 0 0 Eye Wash Statn 0 0 0 Sanitary Sewer Storm Sewer Size Material Type # Water Service Valuation $450.00 Plan Approval Issued By Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0.00 Permit Fees $20,00 [] Permit Voided J Date 09/05/2003 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement mstdcticos of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starling such activity. Signature Date Address 522 W. MURDOCK AVE Agent/Owner OSHKOSH WI__ 54901 -2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.