HomeMy WebLinkAbout0105066-Building (awnings)OSHKOSH
ON THE WATER
.lob.Address 501 509 N MAIN ST
Designer
Category 255 - Awnings/Canopies
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner COMPASS PROPERTIES WEBSTER BLDG LL Create Date
Contractor OSHKOSH TENT AND AWNING
Plan
No 105066
10/30/2003
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size varies
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection I
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 3
Garage 0 Sq. Ft. Baths 0 Signs 0
Foundation ~ Poured Concrete ~ Floating Slab ~ Pier O Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature Commercial & Apartments / Install 6 awnings of various sizes. Some have signage on the valance. None project more than 5' from face of
of Work building. See contractor submittal for sizes and signage.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$9,161.00 Plan Approval $0.00 Permit Fee Paid
$65.00 Park Dedication $0.00
Date 10/30/2003 Final/O.P. 00/00/0000
Permit Voided
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 110 E FERNAU AVE OSHKOSH WI 54901 - 0000 Telephone Number
235-3170
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.