Loading...
HomeMy WebLinkAbout2003-BuildingOSHKOSH ON THE WATER .lob.Address 639 WITZEL AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner CITY OF OSHKOSH CITY GARAGE Contractor OWNER Category 260 - City of Oshkosh-New No 105021 Create Date 10/27/2003 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size 12x20 Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories 1 Canopies Garage 240 Sq. Ft. Baths 0 Signs Foundation (~) Poured Concrete O Floating Slab (~) Pier (~) Other (~) Concrete Block (~) Post (~) Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 1 Use/Nature City Garage/ 12x20 Water Distribution building. Location is toward SW corner of property, NE of the Water Department building located on W of Work 3rd Ave. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $20,000.00 Plan Approval $0.00 Permit Fee Paid $0.00 Park Dedication $0.00 Date 10/29/2003 Final/O.P. 00/00/0000 Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address PO BOX 1130 Agent/Owner OSHKOSH WI 54903 - 1130 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ZONING/LAND USE COMPLIANCE CHECK_L~$T JOB LOCATION: PROPERTY OWNER/CONTRACTOR: CONSTRUCTION DATA: /'~New Construction TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.) COMPLIANCE CHECKLIST Addition _ Alteration DEFICIENT Use Lot Width Lot Area Lot Area Per Family Floodplain Front Yard Front Yard Side Street Rear Yard Side Yards Building Area Parking Standards Off-Street Loading Standards Vision Clearance Transitional Yard Standards Landscape Standards Height Conditions of Approval Compliance with P.C. or BZA Conditions of Approval Signage Standards Drainage Plan COMMENTS REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approval all plans, except the following: (1) Alterations or intedor won~ when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows; etc., when the use is confor~~ no change is proposed. v APPROVED DENIED Plan Commission Action Required Variance(s) Required REVIEWED BY: ~ DATE: