Loading...
HomeMy WebLinkAbout0105001-Building (driveway) } • f - � � CITY OF OSHKOSH No 105001 .. DEr� 1� OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER �r.T� � ; Job Address 1513 FOX ST Owner PAUL R ZUTZ Create Date 10/28/2003 Designer Contractor OWNER Category 256-Parking Lots,Driveways Plan Type � Building � Sign _ � Canopy _ (� Fence � Raze i - -- ------- _____ Zoning Class of Const: Size ; Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. � Projection Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq.Ft. Baths 0 Signs 0 Foundation � Poured Concrete � Floating Slab � Pier � Other � Concrete Block � Post � Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 -- - — _ _-- --- - SFR/Ex - --_ _- -- ---- - - __ _- Use/Nature pan driveway,parking area with a 15x20 extension. 'Expanded area to be screened with 5'tall evergreen shrub border(2.5'-3' of Work at planting)unless a 2 car garage is built in this location. � j — , i — -------J HVAC Contractor Plumbing Contractor Electric Contractor Fees: V t' $100.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Issued By: Date 10/28/2003 Final/O.P. 00/00/0000 � Permit Voided ', In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secur ny necessary approvals before starting such activity. Signature _ �,�Q � Date l a�-a�'-�'� AgenUOwner � Address 1513 FOX ST OSHKOSH WI 54902 - 0000 Telephone Number : �le inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of (i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone �less specified otherwise,we will assume the project is ready at the time the request is received. Work may e inspection is not performed within two business days from the time the project is ready. ZONING/LAND USE COMPLIANCE CHECKLIST JOB LOCATION: ZONING,, PROPERTY OWNER/CONTRACTOR: CONSTRUCTION DATA: New Construction ~' Addition Alteration TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.) / / / COMPLIANCE CHECKLIST DEFICIENT Use Lot Width Lot Area Lot Area Per Family Floodplain Front Yard Front Yard Side Street Rear Yard Side Yards Building Area Parking Standards Off-Street Loading Standards Vision Clearance Transitional Yard Standards Landscape Standards Height Conditions of Approval Compliance with P.C. or BZA Conditions of Approval Signage Standards Drainage Plan .COMMENTS REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approval all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in use is proposed. (2) Maintenance item. s, e.g. siding, windows, etc., when the use is confo~ing~Td when no change is proposed. '~,. "~ ~APPROVED '~~ DENIED Plan Commission Action Required Variance(s) Required REVIEWED BY: