Loading...
HomeMy WebLinkAbout0104986 BOSHKOSH ON THE WATER .lob Address 2300 PATRIOT LN #A Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner NINA LEIB Contractor GEFFERS REMODELING Category 140 - Interior Remodeling No 104986 Create Date 10/24/2003 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation (~) Poured Concrete (~) Floating Slab (~) Pier O Other (~) Concrete Block (~) Post (~) Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature Condo/alterations to basement to provide a family/rec room and 1/2 bath. of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: THOMPSON HEATING AND COOLING SER~ ZIMMER ELECTRIC LLC $11,500.00 Plan Approval $0.00 Plumbing Contractor UNKNOWN Permit Fee Paid $71.00 Park Dedication $0.00 Date 10/28/2003 Final/O.P. 00/00/0000 Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 208 E SNELL RD Oshkosh WI 54901 - 0000 Telephone Number 235-1422 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.