HomeMy WebLinkAbout0103950-Plumbing (water heater)OSHKOSH
ON THE WATER
Jeb Address 1306 BABBITZ AVE
6entracter SAMMONS PLUMBING
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner MARK L GAJEWSKI
Category 411 - Residential-Water Heaters
Bathtub 0 Shower 0 EjectorlGrind 0 Dip Well 0 F Prep Sink .__
Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink
Lavatory 0 Lndry Tray 0 Local Waste g Wait. St. 0 Shamp Sink
Toilet 0 Lndry Stndp 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink
Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin
Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn
Water Heater 1 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal
Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec
Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker
No 103950
Create Date 09/05/2003
Plan
0 Gar Drain
0 Soda Disp
0 Coffee Maker
0 Int GreaseTrap
0 Ext Grease Trap
0 RPZ Valve
0 Eye Wash Statn
0
0
Use/Nature .~FPJ Install gas water heater.
of Work
Sanitary Sewer
Storm Sewer
Water Service
Size Material Type #
Valuation $450.00 Plan Approval $0.00 Permit Fees
Issued By
Corm. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$20.00 [] Permit Voided J
Date 09/05/2003
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 522 W. MURDOCKAVE OSHKOSH WI 54901 - 2298 Telephone Number 231-9880
To schedule inspections please call the Inspection Request line at 236-5'128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.