HomeMy WebLinkAbout0104936-Building (interior walls)OSHKOSH
ON THE WATER
.lob Address 807 W 5TH AVE
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner PHYLLIS J TILLOU
Contractor OWNER
Category 140 - Interior Remodeling
No 104936
Create Date 10/23/2003
Plan
Type IO Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0
Garage 0 Sq. Ft. Baths 0 Signs 0
Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature SFR/ Removing the plaster from the walls of the living room, dining room, 2 bedrooms and the ceiling and walls of the kitchen and insulating
of Work and redrywalling. 3 windows will be replaced in the basement and the other will be closed in. No Structural work
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$3,000.00 Plan Approval $0.00 Permit Fee Paid
$30.00 Park Dedication $0.00
Date 10/23/2003 Final/O.P. 00/00/0000
Permit Voided
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Address 807W 5TH AVE
Agent/Owner
OSHKOSH
WI 54902 - 5840 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.