HomeMy WebLinkAbout0104982-BuildingOSHKOSH
ON THE WATER
.lob Address 2300 PATRIOT LN #F
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner Marlene Casar
Contractor BRU NICK BUILDERS
Category 140 - Interior Remodeling
No 104982
Create Date 10/27/2003
Plan
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: 8
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft.
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories
Garage 0 Sq. Ft. Baths 0
Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Required Flood Plain No Height Permit Not Required
Park Dedication Not Required # Dwelling Units 0 # Structures 0
Size
~J Projection
Canopies 0
Signs 0
Use/Nature 7 Unit CONDO/Construct bedroom and bathroom in basement as per plans. 8% Nat light 4 % Nat Ventilation, or provide per exceptions ~n
of Work =ode.
HVAC Contractor UNKNOWN??? Plumbing Contractor LUDWIG PLUMBING
Electric Contractor SECKAR ELECTRIC
Fees: Valuation $14,300.00 Plan Approval $0.00 Permit Fee Paid $80.00 Park Dedication $0.00
Issued By: Date 10/27/2003 Final/O.P. 00/00/0000
Permit Voided
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Address 2906 AMANDA CT
Agent/Owner
OSHKOSH
WI 54904 - 7669 Telephone Number
920-235-0451, 920-,~
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.