Loading...
HomeMy WebLinkAbout0104875-Building (fence)OSHKOSH ON THE WATER .lob Address 1017 ARTHUR AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner KEVIN & PAMELA ADLER Contractor OWNER Category 251 - Fences No 104875 Create Date 10/20/2003 Plan Type Building (~ Sign (~ Canopy (~ Fence ~ Raze Zoning Unfinished/Basement Finished/Living Garage Foundation Occupancy Permit Park Dedication Poured Concrete Concrete Block Not Required 0 Sq. Ft. 0 Sq. Ft. 0 Sq. Ft. ~ Floating Slab ~ Post Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 (~ Pier (~ Other (~ Treated Wood Flood Plain Height Permit # Dwelling Units 0 # Structures Size ~ Projection I Canopies 0 Signs 0 Use/Nature SFR/Installing approx. 276' of fencing per the site plan submitted. The fence located between the sidewalk and the front of the house is to be 4' of Work 50% open. The fencing is not to extend on the vacant lot to the east. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $1,000.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Date 10/20/2003 Final/O.P. 00/00/0000 Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 1017 ARTHUR AVE Agent/Owner OSHKOSH WI 54902 - 3401 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ZONING/LAND USE COMPLIANCE CHECKUST JOB LOCATION: 1'O ~.'-~ 15~ PROPERT'~~ONTRACTOR:.,, CONSTRUCTION DATA: · TYPE OF CONSTRUCTION: "~ New Construction (i.e. fence, pool, parking lot, sign, etc.) ZONING Addition COMPLIANCE CHECKLIST DEFICIENT Use Lot Width Lot Area Lot Ama Per Family Floodplain Front Yard Front Yard Side Street Rear Yard Side Yards Building Area Parking Standards Off-Street Loading Standards Vision Clearance Transitional Yard Standards Landscape Standards Height Conditions of Approval Compliance with P.C. or BZA Conditions of Approval Signage Standards Drainage Plan COMMENTS Alteration REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approval all plans, except the following: (1) Alterations or intedor work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming_and when no change is proposed. ..~ APPROVED DENIED Plan Commission Action Required Variance(s) Required.,, REVIEWED BY: DATE: