HomeMy WebLinkAbout36. 19-33 JANUARY 8, 2019 19-33 RESOLUTION
(CARRIED 6-0 LOST LAID OVER WITHDRAWN )
PURPOSE: APPROVE CHANGE ORDER NO. 2 FOR PUBLIC WORKS
CONTRACT NO. 17-03 MARY JEWELL LIFT STATION AND PARK
SHELTER (+$13,758.10)
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that the following
Change Order, a copy of which is attached, is hereby approved:
MIRON CONSTRUCTION CO., INC.
PO Box 509
Neenah, WI 54957-0509
Net Increase to contract: $13,758.10
PURPOSE: See attached Change Order.
BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated
from:
Acct. No. 0551-1910-1799-00000 Sewer Utility- Construction in Progress
{
riab, „
City
Oshkosh
MEMORANDUM
TO: Honorable Mayor and Members of the Co on Council
FROM: James Rabe,Director of Public Works
DATE: January 3, 2019
RE: Change Order No. 2 (Final) for Public Works Contract No. 17-03
Mary Jewell Lift Station and Park Shelter
Miron Construction Co., Inc. (+$13,758.10)
BACKGROUND
Change Order No. 2 for Contract 17-03 is scheduled for consideration by the Common Council at the
I January 8,2019 meeting. The contract was originally awarded to Miron Construction Co.,Inc.in October
of 2017 and Change Order No. 1 was approved by the Common Council in January of 2018.
This change order includes additional services that were required which were outside of the original
scope of services for the contract.
ANALYSIS
Following is a summary of the significant changes to each section of the CIP:
• Public Infrastructure Improvements-Wastewater Utility — Final quantities adjusted to match
actual installed quantities, and an adjustment for an accelerated construction schedule. The
accelerated schedule resulted in construction management savings in the agreement with
AECOM Technical Services, Inc. (AECOM). In addition to the accelerated schedule,there were a
few minor project document discrepancies, resulting in an increase in costs of approximately
$10,000. The City recovered those costs from AECOM through an invoice credit during the course
of the project.
I:\Engineering\2017 CONTRACTS\17-03 Oshkosh Ave Page 1 of 2
Swr\Project_Information\Correspondence\Memo\17-03 Memo for CO X2_1-3-19.docx
FISCAL IMPACT
CIP Section Change Order Amount New Contract Total CIP Funds Budgeted
Public Infrastructure
Improvements -
Wastewater Utility $13,758.10 $2,932,588.70 $3,856,100.00
Park Improvements $0.00 $175,000.00 $175,000.00
Total $13,758.10 $3,107,588.70 $4,031,100.00
Adequate funds are available in the relating sections of the 2017 Capital Improvement Budget.
RECOMMENDATIONS
I recommend approval of Change Order No.2 to Contact No. 17-03 in the amount of+$13,758.10 to Miron
Construction Co., Inc.
Approved:
Mark A. Rohloff
City Manager
JER/t1t
L\Engineering\2017 CONTRACTS\17-03 Oshkosh Ave Page 2 of 2
Sivr\Project-Inforniation\Correspondence\Merno\17-03 Memo for CO#2-1-3-19.docx
TO: MIRON CONSTRUCTION CHANGE ORDER#2 (FINAL)
1471 MCMAHON DRIVE DATE: DECEMBER 3, 2018
NEENAH,WI 54956
Your present contract with the City of Oshkosh, Contract No. 17-03, awarded October 24, 2017, is hereby
amended and changed as follows:
NET INCREASE: $46,056.63
NET DECREASE: ($32,298.53)
NET INCREASE TO CONTRACT $13,758.10
BID TOTAL $2,981,403.60 $2,9$1,40160
CO#1 $112,427.00 $112,427A0
PREVIOUS CONTRACT TOTAL $3,093,830.60 $3,093,830.60
CO#2 $13,758.10 $13,758.10
CONTRACT TOTAL $3,107,588.70 $3,107,588.70
CITY OF OSHKOSH
BY:
City Manager
City Clerk
A roved and accept
Contractor
David G.Voss Jr.,President
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh,Wisconsin,
under the within Change Order.
Comptroller
Approved as to form:
City Attorney
CONTRACT 17-03 CHANGE ORDER#2(FINAL)
ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY I IES C ESE DECREASE PRICE CON / E CONTRACTPRICE
Removing pavement; Square
1100 complete asspecified Yards 300.00 300.00 $2.36
7"concrete pavement;with
5"CABC and grading; Square
1301 complete asspecified Yards 550.00 482.00 -68.00 $72.32 $4,917.76
Sawing existing pavement; Linear
1700 complete asspecified Feet 250.00 30.00 -220.00 $3.15 $693.00
2"asphaltic surface LT with
6"CABC and grading; Square
1917 complete asspecified Yards 400.00 400.00 $24.94
Furnish and install 12"storm Linear
2003 sewer;complete asspecified Feet 1 70.00 87.00 17.00 1 $78.75 $1,338.75
Furnish and install Type 1
inlet(with 18"sump);
2235 complete asspecified Each 1.00 1.00 $2,415.00
Furnish;install;maintain;and
remove Type D modified inlet
protection;complete as
2508 specified Each 10.00 10.00 $152.25
Sediment removal-Type D
modified inlet protection;
2510 complete asspecified Each 10.00 1.00 -9.00 $52.50 $472.50
Furnish;install;maintain;and
remove stone tracking pad;
2512 complete asspecified Each 1.00 1.00 $3,307.50
Furnish;install;maintain;and
remove silt fence;complete Linear
2514 asspecified Feet 900.00 699.00 -201.00 $3.68 $739.68
Install salvaged topsoil 6" Square
2602 depth;complete asspecified Yards 2,400.00 1,623.00 -777.00 $4.78 $3,714.06
Furnish and install native
seeding;complete as Square
2610 specified Yards 2,100.00 1,264.00 -836.00 $2.36 $1,972.96
Furnish and install annual
cover crop;complete as Square
2624 specified Yards 2,400.001 1,564.00 -836.00 $0.42 $351.12
Furnish and install Moist
Meadow-Rain Garden Square
2625 Seed;complete asspecified Yards 300.00 300.00 $2.36
Furnish and install grass
pavers;complete as Square
2629 specified Feet 2,200.00 2,018.00 -182.00 $14.28 $2,598.96
Furnish and install
hydraulically-applied erosion
control product;complete as Square
2644 specified Yards 2,400.00 1,564.00 -836.00 $0.68 $568.48
Connect to existing storm
sewer manhole;complete as
2856 specified Each 1.00 1.00 $1,470.00
Strip and stockpile topsoil; Square
2902 complete as specified Yards 3,085.00 2,717.20 -367.80 $4.36 $1,603.61
Furnish and install 8"sanitary
sewer(new);complete as Linear
3030 specified Feet 15.00 7.00 -8.00 $262.50 $2,100.00
Furnish and install 8"sanitary
sewer;DIP with tracer wire
and include 3-45 degree
mega lug connections;and
all mega lug connections as
needed from 10'from the
building to 8"HDPE; Linear
3031 complete asspecified Feet 1 140.00 131.00 -9.00 1 $102.90 $926.10
Page I or 4
CONTRACT 17-03 CHANGE ORDER#2(FINAL)
ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
BE DESCRIPTION UNIT U TIT 0 NTITIES INCE SE DECREASE
Furnish and install 12"
sanitary sewer(new); Linear
3034 Complete asspecified Feet 220.00 194.25 -25.75 $336.00 $8,652.00
Furnish and install 8"sanitary
sewer drop;complete as Vertical
3060 Ispecified Feet 1 10.00 12.00 2.00 1 $136.50 $273.00
Furnish and install standard
sanitary sewer manhole(4'
diameter);complete as Vertical
3100 specified Feet 75.00 76.00 1.00 $630.00 $630.00
Furnish and install external
sanitary sewer manhole
chimney seal;complete as
3114 specified Each 4.00 4.00 $420.00
Furnish and install 12"x 4"
sanitary sewer factory wyes
or tees;complete as
3204 specified Each 1.00 1.00 $525.00
Furnish and install 4"sanitary
sewer riser(new);complete Linear
3231 asspecified Feet 6.00 6.00 $52.50
Furnish and install sanitary
sewer lateral marker balls;
3236 complete asspecified Each 8.00 6.00 -2.00 $52.50 $105.00
Core into existing manhole;
3332 complete asspecified Each 1.00 1.00 $1,575.00
Furnish and construct lift
station and park shelter
facility;complete as
specified;including"A"items
from Major Equipment
Schedule(inclusive of:sign
relocation;temporary site
safety fence;oak tree
removal;abandonment of
two(2)groundwater
monitoring wells;foundation
excavation;backfilling;
structure;adjoining concrete
slabs and approaches;site
landscaping bushes;and
mulch;all electrical(including
pull box
on extra conduit and
transformer pad);
mechanical;HVAC;and
control features and
equipment;all building
internal/extemal connections
to water;sanitary;(extended
10'from the building for
influent and force main);gas;
and including conduit/wiring
from transformer.Include site
dewatering and storm water
management;mobilization/
demobilization;bonds;
insurance;and all incidental Lump
3998 costs);complete asspecified 1 Sum 1 1.00 1.001 1 1 $2,647,025.00
Page 2 of 4
CONTRACT 17-03 CHANGE ORDER#2(FINAL)
ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
N MBE DESCRIPTION UNITQUANTITY QUANTITIES C E E DECREASE PRICE CONTRACTPRICE CONTRACTPRICE
Furnish and install 8"sanitary
sewer force main(new)
HDPE;SDR 19 with tracer
wire;pipe insulation;and
inside drop including all
supplies;labor;and materials
in MH-W-21 (SE-property); Linear
3999 complete as specified Feet 440.00 437.00 -3.00 $91.35 $274.05
Furnish and install 2"water
service(new);complete as Linear
4046 specified Feet 180.00 145.00 -35.00 $74.55 $2,609.25
Furnish and install 2"
corporation and stop box;
4053 Icomplete as specified I Each 1.00 1.00 1 $1,417.50
BID ITEMS(1100-4053)-SUBTOTAL $2,241.75 ($32,298.53)
NET DECREASE: ($30,056.78)
ADDITIONAL WORK REQUIRED: CO#1
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
N BER 1QUANTITIESINCREASE DECREASE PRICE C R E CONTRACTPRICE
1001 -Revise roof dormers; Lump
10001 complete asspecified Sum 1.00 1.00 $19,509.00
1002-Replace split face
CMU with stone veneer; Lump
10002 complete asspecified Sum 1.00 1 1.00 $25,368.00
1003-Increase height of
stone veneer;complete as Lump
10003 specified Sum 1.00 1.00 $28,994.00
1004-Add stone veneer and
sill to wood posts;complete Lump
10004 asspecified Sum 1.00 1.00 $22,781.00
1005-Revised roof trusses
to lower roof;complete as Lump
10005 specified Sum 1.00 1.00 $13,312.00
1006-Replace cement
board siding on gabled
building ends;complete as Lump
10006 specified Sum 1.00 1.00 $2,463.001 1
ADDITIONAL WORK REQUIRED:CO#1(ITEMS 10001 -10006)-SUBTOTAL $0.00 $0.00
NET INCREASE CO#1: $0.00
ADDITIONAL WORK REQUIRED:CO#2
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASEIN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPR/CE CONTRACTPRICE
Frost protection;complete as Lump
20001 specified Sum 0.00 1.00 1.00 $3,675.00 $3,675.00
F05-Wood coating for
exposed timbers and wood
trusses;complete as Lump
30001 specified Sum 0.00 1.00 1.00 $2,730.00 $2,730.00
F06-Gate relocation; Lump
30002 complete as specified Sum 0.00 1.00 1.00 $6,818.11 $6,818.11
F07-Accelerate schedule; Lump
30003 complete asspecified Sum 0.00 1.00 1.00 $20,900.00 $20,900.00
F08-CB 1 changes; Lump
30004 complete as s ecified Sum 0.00 1.00 1.00 $319.65 $319.65
F09-Soffit material change; Lump
30005 complete asspecified Sum 0.00 1.00 1.00 $3,612.00 $3,612.00
FO10-Paving;trusses and Lump
30006 jamb;complete asspecified Sum 1 0.00 1.00 1.00 $3,845.00 $3,845.00
Page 3 of 4
CONTRACT 17-03 CHANGE ORDER#2(FINAL)
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN
NUMBER UANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE
F011-WWTP doors;
hardware;complete as Lump
30007 specified Sum 0.00 1.00 1.00 $1,376.38 $1,376.38
F012-Electrical strikes and
light fixtures;complete as Lump
30008 specified Sum 0.00 1.00 1 1.00 $6,115.72 $6,115.72
F013-Interface cards; Lump
30009 complete asspecified Sum 0.00 1.00 1.00 $2,752.32 $2,752.32
Final contract discussions;
30010 complete asspecified Days 0.00 0.00 $1,500.00
ADDITIONAL WORK REQUIRED: CO#2(ITEMS 20001-30010)-SUBTOTAL $43,814;88 $0.00
NET INCREASE CO#2: $43,814.88
NET INCREASE: $46,056.63
NET DECREASE: ($32,298.53)
NET INCREASE TO CONTRACT: $13,758.10
Page 4 of 4
AECOM AECOM
558 North Main Street
Oshkosh,WI 54901
RECEIVED
aecom.com
JAN — 31 2019 January 3,2019
DEPT Oi' PUBLIC WORKS AECOM Project No.
OSHKOSt;, WISCONSIN 60558144
Mr. Justin Gierach, P.E.
Civil Engineering Supervisor, Public Works
City of Oshkosh
215 Church Avenue
Oshkosh,Wisconsin 54903-1130
Amendment 1—Deductive Contract Amendment for Construction Monitoring and Documentation Services
Related to Construction of City Contract 17-03-Mary Jewell Lift Station and Park Shelter,Oshkosh,Wisconsin
Dear Mr. Gierach:
AECOM Technical Services, Inc. (AECOM)is pleased to present this contract amendment to the City of Oshkosh
(City)for Construction Monitoring and Documentation Services related to the construction of City Contract
17-03-Mary Jewell Lift Station and Park Shelter, located in Oshkosh,Wisconsin,AECOM proposal number
OPP-640360, and dated October 30,2017. Based on the efficiency of the General Contractor,AECOM's staff only
provided full-time documentation on critical construction items and provided part-time documentation during
construction of non-critical items. We estimate a significant reduction in the contract value for AECOM's services to
complete the scope of work as outlined in Task 2 of AECOM's proposal.This document reflects the reduction in our
contract of$90,000. The deduction is realized on our estimated fees for field work Task 2 as described in our
proposal. Please note all services as outlined in the proposal were completed.
Services In-Lieu
In addition to the contract reduction based on the efficiency of the project,AECOM has also performed services in-lieu
of fee related to three elements of the project documents which would have resulted in additional fees to the City,
which AECOM has taken responsibility for. The credits related to these amounts were provided on invoices as the
project progressed. We have included a copy of the invoices with the credits for your records. The scope items which
AECOM provided credits for are summarized as follows:
• A discrepancy was noted in the project documents between the structural sheets and the mechanical sheets
after the gate well walls had been poured. It was determined that one of the gates had been installed in the
incorrect location and needed to be relocated. AECOM provided a credit in the amount of$6,818.11 (AECOM
Invoice Number 2000070774).
• During the course of construction, it was determined that the vinyl soffit materials which were specified would not
span the eaves as intended without supplemental support. Miron Construction offered an alternate of replacing
the vinyl soffit with an aluminum soffit. AECOM provided a credit of$781.00 to offset the cost of the substitution
(AECOM Invoice Number 2000070774).
• After installation, it was determined that one of the approved light fixtures on the exterior of the building
functioned in strobe mode as opposed to constant-on mode. AECOM provided a credit of$2,576.63 to offset the
cost of the replacement of the strobe fixture with a constant-on fixture(AECOM Invoice Number 2000114042).
These credits have previously been provided to the City of Oshkosh during the respective monthly invoicing process,
and are not a part of the$90,000 contract deduction provided in this amendment. A copy of the referenced invoices
are attached.
Contract Amendment
The original contract value between AECOM.and the City was$589,665. This contract modification will reduce the
contract value by$90,000 resulting in a revised contract value of$499,665.
1
K:\Projects\60558144_Mary Jewell LS CM\100-Contract\110 Client Contract\60558144_MJLS Deductive Amendment.docx
AECOM
,Wisconsin
c Main Street
/�� ,r, Oshkosh,Wisconsin 54901
920.235.0270
We appreciate the opportunity to provide engineering services to the City of Oshkosh. If you have any questions
regarding the proposed contract modification, please contact us at your convenience. If you have any questions or
need to clarify a point, please call Paul Timm at 920-236-6718.
Yours sincerely,
AECOM Technical Services, Inc. _
Paul F.Timm Jeremy M.Thomas, P.E.
Account Manager�iJ Project Manager
end: Authorization
AECOM Invoices
I
I
f
i
2
K:\Projects\60558144_Mary Jewell LS CM\100-Contract\110 Client Contract\60558144 MJLS Deductive Amendment.docx
AECOM/� 558 N Main Street
OM Oshkosh,Wisconsin 54901
920.235.0270
Amendment to Agreement
Amendment No.1
City Contract 17-03
AECOM Project No.60558144
RETURN TO: AECOM Date: January 3,2019
558 North Main Street
Oshkosh,WI 54901
Attention: Paul Timm
Summary Original Contract Value $589,665
Total Previous Amendments $0.00
Amount this Amendment ($90,000)
Revised Contract Amount $499,665
Task# Description Amount of Add or
(Deduct)
Project Management, Submittal and Design Review,
1 Meetings, Project Closeout and Construction $0.00
Documentation Report
2 Field Work(including equipment rental,expenses and ($90,000)
subcontracting laboratory services)
3 Operation and Maintenance Manual $0.00
TOTAL ($90,000)
3
KAProjects\60558144_Mary Jewell LS CM\100-Contract\110 Client Contract\60558144_MJLS Deductive Amendment.docx
Wisconsin
Main Street
/"fSCOM Oshkosh,,Wiscc onsin 54901
920.235.0270
Authorization
January 3, 2019
1 hereby certify that the necessary provisions have been made to pay the liability which will accrue under this
contract.
I hereby authorize AECOM to proceed with the scope of work for Amendment 1,to amend the Construction
Monitoring and Documentation Services, Related to Construction of the City Contract 17-03—Mary Jewell Lift
Station and Park Shelter, Oshkosh,Wisconsin as described in AECOM's proposal number OPP-640360 dated
October 30,2017 with a revised budget authorization of$499,665 under the general terms and conditions
specified in the proposal.
Signature Date
Mark A Rohloff
Print Name
City Manager
Title/Organization
Signature Date
Pamela R. Ubrig
Print Name
City Clerk
Title/Organization
Signature Date
Lynn A. Lorenson
Print Name
City Attorney
Title/Organization
Signature Date
Trena Larson
Print Name
Director of Finance
Title/Organization
4
K:\Projects\60558144_Mary Jewell LS CM\100-Contract\110 Client Contract\60558144_MJLS Deductive Amendment.docx
Check Payment to: ACC Payment to: Wire Transfer Payment AECOM Technical Services,Inc. AECOM Technical Services,Inc. AECOM Technical Servicis es,Inc. )L=Com An AECOM Company An AECOM Company An AECOM Company
1178 Paysphere Circle Bank of America Bank of America
Chicago,IL 60674 Account Number 5800937020 New York,NY 10001
ABA Number 071000039 Account Number 5800937020
ABA Number 026009593
SWIFT CODE BOFAUS3N
558 North Main Street,Oshkosh,WI 54901
Tel:920-235-0270 Fax:920-235-0321
Federal Tax ID No.95-2661922
ATTN :ACCOUNTS PAYABLE Invoice Date: 12-JUN-18
CITY OF OSHKOSH Invoice Number: 2000070774
215 CHURCH AVENUE
OSHKOSH,WI 54901 Agreement Number: 60558144.2
Agreement Description:
Payment Term: 30 DAYS
email invoice to Tracy Taylor at ttaylor@ci.oshkosh.wi.us City Contract 17-03
Please reference Invoice Number and Project Number with Remittance
Project Number :60558144 Project Name : Mary Jewell LS CM
Bill Through Date :05-MAY-18-01-JUN-18
AECOM PM: Jeremy Thomas 920-236-6724
Task Number :1 Task Name :PM&Submittals
Labor Bill Rate
Employee Name/Title Title/Expenditure Hours Bill Rate Billed Amt
Adams,James E(Jim) 5.00 190.00 950.00
Blaha,James J(Jim) 8.00 130.00 1,040.00
Crotteau,Kathryn M(Katie) 21.50 75.00 1,612.50
Crotteau,Kathryn M(Katie) 0.50 75.00 37.50
Greeneway,Gary R 7.50 190.00 1,425.00
Hause,Darrell R 1.50 140.00 210.00
Kirsch,John M 14.00 140.00 1,960.00
Podolak,Wayne L 2.00 155.00 310.00
Thomas,Jeremy M 25.00 175.00 4,375.00
Thomas,Jeremy M 29.00 175.00 5,075.00
Timm,Paul F 5.00 190.00 950.00
Total Labor Bill Rate 119.00 17,945.00
Task Total :PM&Submittals 17,945.00
Task Number :2 Task Name:Field Work
Labor Bill Rate
Employee Name/Title Title/Expenditure Hours Bill Rate Billed Amt
Magee,Mark W 2.50 115.00 287.50
Wilson,Chad A 59.25 85.00 5,036.25
Wilson,Chad A 9.00 85.00 765.00
Total Labor Bill Rate 70.75 6,088.75
Unit Billing
Expenditure Type EmploveeNendor Name Quantity UOM Bill Rate Billed Amt
Field Equipment US ACM ZERO AP 1,472.0 EACH 1.00 1,472.00
Total Unit Billing 1,472.00
Task Total :Field Work 7,560.75
Task Number :3 Task Name:O&M Manual
5
Labor Bili Rate
Employee Name/Titte Title/Expenditure Hours Bill Rate Billed Amt
Greeneway,Gary R 13.75 190.00 2,612.50
Total Labor Bill Rate 13.75 2,612.50
Task Total :O&M Manual 2,612.50
Lump Sum
Description Billed Amt
Aluminum Soffit in lieu of Vinyl Soffit -781.00
Gate Relocation Expense -6,818.11
Total Lump Sum -7,599.11
Project Total :Mary Jewell LS CM 20,519.14
Invoice Summaries
Total Current Amount: 20,519.14
Retention Amount: 0.00
Pre-Tax Amount: 20,519.14
Tax Amount: 0.00
Total Invoice Amount: 20,519.14
Billing Summaries
Billing Summary Current Prior Total Limit Remain
Billings 20,519.14 241,820.91 262,340.05 589,665.00 327,324.95
Billing Total: 20,519.14 241,820.91 262,340.05
Outstanding Invoices
Invoice Number Invoice Date Invoice Balance
2000048396 20-APR-18 69,481.16
2000057561 10-MAY-18 37,453.50
Outstanding Total: 106,934.66
6
City of Oshkosh
2018 Fee Schedule Usage Billing
Date(s) Used: 4/30/2018 to 5/4/2018
Project Number: 60558144
Task: 2
Project Name: Mary Jewell Lift Station CM
Project Manager: Jeremy Thomas
Service Unit Rate Qty Used Total Charge
Proctor Density Test Granular/Cohesive Per Test $ 150.00 $ -
One Point Proctor Test Per Test $ 70.00 $ -
Sieve Analysis Per Test $ 100.00 $ -
Water Content Test Per Test $ 8.00 $ -
Concrete Comp Strength/Reserve Per Test $ 22.00 15 $ 330.00
Nuclear Meter Rental Per Day $ 75.00 $ -
Yuma Rental Per Week $ 200.00 $ -
Truck Rental(Last 5 digits of VIN 09270) Per Week $ 250.00 1 $ 250.00
Mustang Safety Suites Per Day $ 100.00 $ -
Misc. Expenses Per Week $ 50.00 1 $ 50.00
Survey Equipment GPS/Total Stations Per Day $ 175.00 $ -
12'Jon Boat Rental Bathometric Per Day $ 150.00 $ -
Trimble DSM 0.0 DGPS Sub-meter Positioning Per Day $ 250.00 $ -
20'Survey Vessel Bathometric Per Day $ 350.00 $ -
Sediment Sampler Per Day $ 175.00 $ -
Water Level Meter Per Day $ 20.00 $ -
Water Sample Filters Each $ 21.00 $ -
Well Sampling W/pump Per Well $ 30.00 $ -
Well Sampling w/out pump Per Well $ 20.00 $ -
Bailers Each $ 10.00 $ -
Level D Protection Per Day $ 15.00 $ -
Water Sampling Supplies Each $ 20.00 $ -
PID Meter Per Day $ 75.00 $ -
GEM Meter Per Day $ 100.00 $ -
*Other: $ -
*Other: $ -
*Other: $ -
Total $ 630.00
Completed By: Chad Wilson/Katie Crofteau
Project Manager Approval: Jeremy Thomas
*All'Other'charges are to be approved by Paul Timm and City of Oshkosh prior to usage.
Revenue chargebackto Department 2247(04105226.0001)
Vehicle Recovery to 04102563.00091
7
City of Oshkosh
2018 Fee Schedule Usage Billing
Date(s) Used: 5/7/2018 to 5/11/2018
Project Number: 60558144
Task: 2
Project Name: Mary Jewell Lift Station CM
Project Manager: Jeremy Thomas
Service Unit Rate Qty Used Total Charge
Proctor Density Test Granular/Cohesive Per Test $ 150.00 $
One Point Proctor Test Per Test $ 70.00 $ -
Sieve Analysis Per Test $ 100.00 $ -
Water Content Test Per Test $ 8.00 $ -
Concrete Comp Strength/Reserve Per Test $ 22.00 3 $ 66.00
Nuclear Meter Rental Per Day $ 75.00 $ -
Yuma Rental Per Week $ 200.00 $ -
Truck Rental(Last 5 digits of VIN 09270) Per Week $ 250.00 1 $ 250.00
Mustang Safety Suites Per Day $ 100.00 $ -
Misc. Expenses Per Week $ 50.00 1 $ 50.00
Survey Equipment GPS/Total Stations Per Day $ 175.00 $ -
12'Jon Boat Rental Bathometric Per Day $ 150.00 $ -
Trimble DSM 0.0 DGPS Sub-meter Positioning Per Day $ 250.00 $ -
20'Survey Vessel Bathometric Per Day $ 350.00 $ -
Sediment Sampler Per Day $ 175.00 $ -
Water Level Meter Per Day $ 20.00 $ -
Water Sample Filters Each $ 21.00 $ -
Well Sampling W/pump Per Well $ 30.00 $ -
Well Sampling w/out pump Per Well $ 20.00 $ -
Bailers Each $ 10.00 $ -
Level D Protection Per Day $ 15.00 $ -
Water Sampling Supplies Each $ 20.00 $ -
PID Meter Per Day $ 75.00 $ -
GEM Meter Per Day $ 100.00 $ -
*Other: $ -
*Other: $ -
*Other: $ -
Total $ 366.00
Completed By: Chad Wilson/Katie Crofteau
Project Manager Approval: Jeremy Thomas
*All 'Other'charges are to be approved by Paul Timm and City of Oshkosh prior to usage.
Revenue chargeback to Department 2247(04105226.0001)
Vehicle Recovery to 04102563.00091
8
City of Oshkosh ❑
2018 Fee Schedule Usage Billing
Date(s) Used: 5/14/2018 to 5/18/2018
Project Number: 60558144
Task: 2
Project Name: Mary Jewell Lift Station CM
Project Manager: Jeremy Thomas
Service Unit Rate Qty Used Total Charge
Proctor Density Test Granular/Cohesive Per Test $ 150.00 $ -
One Point Proctor Test Per Test $ 70.00 $ -
Sieve Analysis Per Test $ 100.00 $ -
Water Content Test Per Test $ 8.00 $ -
Concrete Comp Strength/Reserve Per Test $ 22.00 8 $ 176.00
Nuclear Meter Rental Per Day $ 75.00 $ -
Yuma Rental Per Week $ 200.00 $ -
Truck Rental(Last 5 digits of VIN 09270) Per Week $ 250.00 1 $ 250.00
Mustang Safety Suites Per Day $ 100.00 $ -
Misc. Expenses Per Week $ 50.00 1 $ 50.00
Survey Equipment GPS/Total Stations' Per Day $ 175.00 $ -
12'Jon Boat Rental Bathometric Per Day $ 150.00 $ -
Trimble DSM 0.0 DGPS Sub-meter Positioning Per Day $ 250.00 $ -
20'Survey Vessel Bathometric Per Day $ 350.00 $ -
Sediment Sampler Per Day $ 175.00 $ -
Water Level Meter Per Day $ 20.00 $ -
Water Sample Filters Each $ 21.00 $ -
Well Sampling W/pump Per Well $ 30.00 $ -
Well Sampling w/out pump Per Well $ 20.00 $ -
Bailers Each $ 10.00 $ -
Level D Protection Per Day $ 15.00 $ -
Water Sampling Supplies Each $ 20.00 $ -
PID Meter Per Day $ 75.00 $ -
GEM Meter Per Day $ 100.00 $ -
*Other: $ _
*Other: $ _
*Other: $ _
Total $ 476.00
Completed By: Chad Wilson/Katie Crotteau
Project Manager Approval: Jeremy Thomas
*All'Other'charges are to be approved by Paul Timm and City of Oshkosh prior to usage.
Revenue chargeback to Department 2247(04105226.0001)
Vehicle Recovery to 04102563.00091
9
Check Payment to: ACC Payment to: Wire Transfer Payment �0
AECOM Technical Services,Inc. AECOM Technical Services,Inc. AECOM Technical Services,Inc. �
An AECOM Company An AECOM Company An AECOM Company
1178 Paysphere Circle Bank of America Bank of America
Chicago,IL 60674 Account Number 5800937020 New York,NY 10001
ABA Number 071000039 Account Number 5800937020
ABA Number 026009593
SWIFT CODE BOFAUS3N
558 North Main Street,Oshkosh,WI 54901
Tel:920-235-0270 Fax:920-235-0321
Federal Tax ID No.95-2661922
ATTN:ACCOUNTS PAYABLE Invoice Date: 20-SEP-18
CITY OF OSHKOSH Invoice Number: 2000114042
215 CHURCH AVENUE
OSHKOSH,WI 54901 Agreement Number: 60558144-2
United States Agreement Description:
Payment Term: 30 DAYS
email invoice to Tracy Taylor at ttaylor@ci.oshkosh.wi.us City Contract 17-03
Please reference Invoice Number and Project Number with Remittance
Project Number :60558144 Project Name :Mary Jewell LS CM
Bill Through Date :04-AUG-18-31-AUG-18
AECOM PM: Jeremy Thomas 920-236-6724
Task Number :1 Task Name :PM&Submittals
Labor Bill Rate
Employee Name/Title Title/Expenditure Hours Bill Rate Billed Amt
Blaha,James J(Jim) 4.00 130.00 520.00
Brand,Travis P 15.50 75.00 1,162.50
Breitwisch,Gary E 1.00 165.00 165.00
Crotteau,Kathryn M(Katie) 11.00 75.00 825.00
Greeneway,Gary R 3.25 190.00 617.50
Hause,Darrell R 8.00 140.00 1,120.00
Thomas,Jeremy M 71.00 175.00 12,425.00
Timm,Paul F 10.00 190.00 1,900.00
Total Labor Bill Rate 123.75 18,735.00
Task Total :PM&Submittals 18,735.00
Task Number :2 Task Name :Field Work
Labor Bill Rate
Employee Name/Title Title/Expenditure Hours Bill Rate Billed Amt
Magee,Mark W 48.50 115.00 5,577.50
Timm,Paul F 30.00 190.00 5,700.00
Wilson,Chad A 118.25 85.00 10,051.25
Wilson,Chad A 2.25 85.00 191.25
Total Labor Bill Rate 199.00 21,520.00
Unit Billing
Expenditure Type EmployeeNendor Name Quantily UOM Bili Rate Billed Amt
Field Equipment US ACM ZERO AP 1,354.0 EACH 1.00 1,354.00
Total Unit Billing 1,354.00
Reimbursable
Expenditure Type Employee/Vendor Name Inv Number Raw Cost Multiplier Billed Amt
Subcontractor Exempt BAY AREA TESTING& 2646 185.00 1.0500 194.25
CONSULTING LLC
Total Reimbursable 185.00 194.25
Task Total :Field Work 23,068.25
Task Number :3 Task Name :O&M Manual
10
Labor Bill Rate
Employee Name/Title Title/Expenditure Hours Bill Rate Billed Amt
Greeneway,Gary R 10.00 190.00 1,900.00
Total Labor Bill Rate 10.00 1,900.00
Task Total :O&M Manual 1,900.00
Lump Sum
Description Billed Amt
Replacement of Explosion Proof Light Fixture. -2,576.63
Total Lump Sum -2,576.63
Project Total :Mary Jewell LS CM 41,126.62
Invoice Summaries
Total Current Amount: 41,126.62
Retention Amount: 0.00
Pre-Tax Amount: 41,126.62
Tax Amount: 0.00
Total Invoice Amount: 41,126.62
Billing Summaries
Billing Summary, Current Prior Total Limit Remain
Billings 41,126.62 345,057.13 386,183.75 589,665.00 203,481.25
Billing Total: 41,126.62 345,057.13 386,183.75
Outstanding Invoices
Invoice Number Invoice Date Invoice Balance
2000114042 20-SEP-18 41,126.62
2000097509 14-AUG-18 42,569.98
2000085764 18-JUL-18 40,147.10
Outstanding Total: 123,843.70
11
City of Oshkosh
2018 Fee Schedule Usage Billing
Date(s) Used: 7/16/2018 to 7/20/2018
Project Number: 60558144
Task: 2
Project Name: Mary Jewell Lift Station CM
Project Manager: Jeremy Thomas
Service Unit Rate Qty Used Total Charge
Proctor Density Test Granular/Cohesive Per Test $ 150.00 $ -
One Point Proctor Test Per Test $ 70.00 $ -
Sieve Analysis Per Test $ 100.00 $ -
Water Content Test Per Test $ 8.00 $ -
Concrete Comp Strength/Reserve Per Test $ 22.00 $ -
Nuclear Meter Rental Per Day $ 75.00 $ -
Yuma Rental Per Week $ 200.00 $ -
Truck Rental(Last 5 digits of VIN 09270) Per Week $ 250.00 1 $ 250.00
Mustang Safety Suites Per Day $ 100.00 $ -
Misc. Expenses Per Week $ 50.00 1 $ 50.00
Survey Equipment GPS/Total Stations Per Day $ 175.00 $ -
12'Jon Boat Rental Bathometric Per Day $ 150.00 $ -
Trimble DSM 0.0 DGPS Sub-meter Positioning Per Day $ 250.00 $ -
20'Survey Vessel Bathometric Per Day $ 350.00 $ -
Sediment Sampler Per Day $ 175.00 $ -
Water Level Meter Per Day $ 20.00 $ -
Water Sample Filters Each $ 21.00 $ -
Well Sampling W/pump Per Well $ 30.00 $ -
Well Sampling w/out pump Per Well $ 20.00 $ -
Bailers Each $ 10.00 $ -
Level D Protection Per Day $ 15.00 $ -
Water Sampling Supplies Each $ 20.00 $ -
PID Meter Per Day $ 75.00 $ -
GEM Meter Per Day $ 100.00 $ -
*Other: $ _
*Other: $ -
*Other: $ -
Total $ 300.00
Completed By: Chad Wilson/Katie Crotteau
Project Manager Approval: Jeremy Thomas
*AII'Other'charges are to be approved by Paul Timm and City of Oshkosh prior to usage.
Revenue chargeback to Department 2247(04105226.0001)
Vehicle Recovery to 04102563.00091
12
City of Oshkosh
2018 Fee Schedule Usage Billing
Date(s) Used: 7/23/2018 to 7/27/2018
Project Number: 60558144
Task: 2
Project Name: Mary Jewell Lift Station CM
Project Manager: Jeremy Thomas
Service Unit Rate Qty Used Total Charge
Proctor Density Test Granular/Cohesive Per Test $ 150.00 $ -
One Point Proctor Test Per Test $ 70.00 $ -
Sieve Analysis Per Test $ 100.00 $ -
Water Content Test Per Test $ 8.00 $ -
Concrete Comp Strength/Reserve Per Test $ 22.00 $ -
Nuclear Meter Rental Per Day $ 75.00 $ -
Yuma Rental Per Week $ 200.00 $ -
Truck Rental(Last 5 digits of VIN 09270) Per Week $ 250.00 1 $ 250.00
Mustang Safety Suites Per Day $ 100.00 $ -
Misc. Expenses Per Week $ 50.00 1 $ 50.00
Survey Equipment GPS/Total Stations Per Day $ 175.00 $ -
12'Jon Boat Rental Bathometric Per Day $ 150.00 $ -
Trimble DSM 0.0 DGPS Sub-meter Positioning Per Day $ 250.00 $ -
20'Survey Vessel Bathometric Per Day $ 350.00 $ -
Sediment Sampler Per Day $ 175.00 $ -
Water Level Meter Per Day $ 20.00 $ -
Water Sample Filters Each $ 21.00 $ -
Well Sampling W/pump Per Well $ 30.00 $ -
Well Sampling w/out pump Per Well $ 20.00 $ -
Bailers Each $ 10.00 $ -
Level D Protection Per Day $ 15.00 $ -
Water Sampling Supplies Each $ 20.00 $ -
PID Meter Per Day $ 75.00 $ -
GEM Meter Per Day $ 100.00 $ -
*Other: $ -
*Other: $ _
*Other: $ _
Total $ 300.00
Completed By: Chad Wilson/Katie Crotteau
Project Manager Approval: Jeremy Thomas
*All'Other'charges are to be approved by Paul Timm and City of Oshkosh prior to usage.
Revenue chargeback to Department 2247(04105226.0001)
Vehicle Recovery to 04102563.00091
13
City of Oshkosh
2018 Fee Schedule Usage Billing
Date(s) Used: 7/30/2018 to 8/3/2018
Project Number: 60558144
Task: 2
Project Name: Mary Jewell Lift Station CM
Project Manager: Jeremy Thomas
Service Unit Rate Qty Used Total Charge
Proctor Density Test Granular/Cohesive Per Test $ 150.00 $ -
One Point Proctor Test Per Test $ 70.00 $ -
Sieve Analysis Per Test $ 100.00 $ -
Water Content Test Per Test $ 8.00 $ -
Concrete Comp Strength/Reserve Per Test $ 22.00 4 $ 88.00
Nuclear Meter Rental Per Day $ 75.00 $ -
Yuma Rental Per Week $ 200.00 $
Truck Rental (Last 5 digits of VIN 09270) Per Week $ 250.00 1 $ 250.00
Mustang Safety Suites Per Day $ 100.00 $ -
Misc. Expenses Per Week $ 50.00 1 $ 50.00
Survey Equipment GPS/Total Stations Per Day $ 175.00 $ -
12'Jon Boat Rental Bathometric Per Day $ 150.00 $ -
Trimble DSM 0.0 DGPS Sub-meter Positioning Per Day $ 250.00 $ -
20'Survey Vessel Bathometric Per Day $ 350.00 $ -
Sediment Sampler Per Day $ 175.00 $ -
Water Level Meter Per Day $ 20.00 $ -
Water Sample Filters Each $ 21.00 $ -
Well Sampling W/pump Per Well $ 30.00 $
Well Sampling w/out pump Per Well $ 20.00 $ -
Bailers Each $ 10.00 $ -
Level D Protection Per Day $ 15.00 $ -
Water Sampling Supplies Each $ 20.00 $ -
PID Meter Per Day $ 75.00 $ -
GEM Meter Per Day $ 100.00 $ -
*Other: $ _
*Other: $ _
*Other: $ _
Total $ 388.00
Completed By: Chad Wilson/Katie Crotteau
Project Manager Approval: Jeremy Thomas
*All'Other'charges are to be approved by Paul Timm and City of Oshkosh prior to usage.
Revenue chargeback to Department 2247(04105226.0001)
Vehicle Recovery to 04102563.00091
14
City of Oshkosh
2018 Fee Schedule Usage Billing
Date(s) Used: 8/6/2018 to 8/10/2018
Project Number: 60558144
Task: 2
Project Name: Mary Jewell Lift Station CM
Project Manager: Jeremy Thomas
Service Unit Rate Qty Used Total Charge
Proctor Density Test Granular/Cohesive Per Test $ 150.00 $ -
One Point Proctor Test Per Test $ 70.00 $ -
Sieve Analysis Per Test $ 100.00 $ -
Water Content Test Per Test $ 8.00 $ -
Concrete Comp Strength/Reserve Per Test $ 22.00 3 $ 66.00
Nuclear Meter Rental Per Day $ 75.00 $ -
Yuma Rental Per Week $ 200.00 $ -
Truck Rental (Last 5 digits of VIN 09270) Per Week $ 250.00 1 $ 250.00
Mustang Safety Suites Per Day $ 100.00 $ -
Misc. Expenses Per Week $ 50.00 1 $ 50.00
Survey Equipment GPS/Total Stations Per Day $ 175.00 $ -
12'Jon Boat Rental Bathometric Per Day $ 150.00 $ -
Trimble DSM 0.0 DGPS Sub-meter Positioning Per Day $ 250.00 $ -
20'Survey Vessel Bathometric Per Day $ 350.00 $ -
Sediment Sampler Per Day $ 175.00 $ -
Water Level Meter Per Day $ 20.00 $ -
Water Sample Filters Each $ 21.00 $ -
Well Sampling W/pump Per Well $ 30.00 $ -
Well Sampling w/out pump Per Well $ 20.00 $ -
Bailers Each $ 10.00 $ -
Level D Protection Per Day $ 15.00 $ -
Water Sampling Supplies Each $ 20.00 $ -
PID Meter Per Day $ 75.00 $ -
GEM Meter Per Day $ 100.00 $ -
*Other: $ _
*Other: $ _
*Other: $ _
Total $ 366.00
Completed By: Chad Wilson/Katie Crotteau
Project Manager Approval: Jeremy Thomas
*All'Other'charges are to be approved by Paul Timm and City of Oshkosh prior to usage.
Revenue chargeback to Department 2247(04105226.0001)
Vehicle Recovery to 04102563.00091
15
3125 Birch Road, Suite B 2 Invoice
Suamico, W I 54173
Ph: (920) 676-1923 Date Invoice #
Fax: (920) 544-9693 8/24/2018 2646
BATC B 18-628
Job No.
MAIL TO:
AECOM
558 N. Main Street
Oshkosh,W1 54901
ATTN: Katie Crotteau
Project ID
Project Description
Mary Jewell Lift Station,AECOM Project No. 60558144,City of Oshkosh Contract#17-03,Oshkosh,WI
Quantity Description Rate Amount
Construction Materials Testing Services: 07/08/18 -08/18/18
1.00 Mechanical Analysis of Soils-Fine Aggregate to 3" 65.00 65.00
1.00 Modified Proctor Test 120.00 120.00
Terms Net 30 Total $185.00
16