HomeMy WebLinkAbout11. 18-549 NOVEMBER 14, 2018 18-549 RESOLUTION (CARRIED 6-0 LOST LAID OVER WITHDRAWN ) PURPOSE: AWARD BID TO NORTHERN METAL & ROOFING FOR ROOF REPLACEMENT OF THE HEADWORKS & DIGESTER BUILDINGS FOR WASTEWATER TREATMENT PLANT ($107,150.00) INITIATED BY: PURCHASING DIVISION WHEREAS, the City of Oshkosh has heretofore advertised for bids for roof replacement of the headworks and digester buildings for Wastewater Treatment Plant; and WHEREAS,upon the opening and tabulation of bids, it appears that the following is the most advantageous bid: NORTHERN METAL & ROOFING CO INC 320 Packerland Drive Green Bay, WI 54303 Total Bid: $107,150.00 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 0551-1946-1731-XXXXX Sewer Utility- Treatment Structures & Improvement 0322-1910-7206-05814 Capital Construction- Digester Roof Replacement 5."" Oshkosh TO: Honorable Mayor and Members of the Common Council FROM: Jon G. Urben, General Services Manager DATE: November 6, 2018 RE: Award Bid to Northern Metal & Roofing for Roof Replacement of the Headworks and Digester Buildings for Wastewater Treatment Plant ($107,150.00) BACKGROUND The Common Council allocated a total of $125,000.00 in the 2017 and 2018 CIP to replace two roofs at the Wastewater Treatment Plant: $30,000.00 in the 2017 CIP for the Headworks building roof and $95,000.00 in the 2018 CIP for the Digester building roof. Specialty Engineering Group (SEG) was engaged to provide engineering/design services for this project. ANALYSIS Working with staff and SEG, Purchasing prepared bid specifications for this project. The bid was advertised in the local newspaper. Bids were due October 11, 2018. The bid tab is attached. Based on the bid review, it was the consensus of city staff and SEG that the low bid received met all the minimum bid requirements. FISCAL IMPACT The fiscal impact of this bid is $107,150.00. The 2017 and 2018 CIP allocated a total of $125,000.00 for this project. With the inclusion of the bid and factoring in SEG's design fees of $8,750.00, the total fiscal impact to date for this project is $115,900.00. This project will be charged to A/N# 0551-1910-1731 and 0322-1910-7206-05814. RECOMMENDATION Purchasing recommends the Common Council award this bid to Northern Metal and Roofing. Respectfully Submitted, Jon G. Urben, General Services Manager Approved: Mark A. Rohloff, City Manager City Nall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 http://www.ci.oshkosh.wi.us BID TAB DIGESTER AND HEADWORKS ROOF REPLACEMENT WASTEWATER TREATMENT PLANT BIDS OPENED OCTOBER 11 .2018 NAMES OF BIDDERS BID BID BOND PREQUAL Northern Metal and Roofing Co Inc 320 Packerland Drive $107,150.00 Y Y Green Bay WI 54303 Quality Roofing Inc 1507 Laemle Ave $151,703.00 Y Y Marshfiled WI 54449 Pioneer Roofing LLC 151 Maple St $169,810.00 Y Y PO Box 277 Johnson Creek WI 53038 Oshkosh Industrial Roofing & Sheet Metal PO Box 1 $110,505.00 Y Y Winnebago WI 54985 Walsdorf Roofing Co Inc PO Box 66 $119,944.00 Y Y Kiel WI 53042-0066