HomeMy WebLinkAbout28. 18-539 OCTOBER 23, 2018 18-539 RESOLUTION
(CARRIED 6-0 LOST LAID OVER WITHDRAWN )
PURPOSE: APPROVE CONDITIONAL USE PERMIT AND SPECIFIC
IMPLEMENTATION PLAN FOR A MULTI FAMILY
DEVELOPMENT; NORTHWEST CORNER OF WEST 6TH AVENUE
AND OREGON STREET COMMONLY REFERRED TO AS THE
"MORGAN DISTRICT"
INITIATED BY: THE MORGAN DISTRICT, LLC
PLAN COMMISSION RECOMMENDATION: Approved w/conditions
WHEREAS, a conditional use permit and the general development plan for the
proposed planned development at the northwest corner of W. 61h Avenue and Oregon
Street was previously approved; and
WHEREAS, the applicant has submitted a specific implementation plan for a
multi-family development located at the northwest corner of W. 61h Avenue and Oregon
Street; and
WHEREAS, the Plan Commission finds that the specific implementation plan for
the planned development for a multi-family development located at the northwest corner
of W. 61h Avenue and Oregon Street is consistent with the criteria established in Section
30-387(6) of the Oshkosh Zoning Ordinance.
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Oshkosh that a conditional use permit and specific implementation plan for a multi-
family development located at the northwest corner of W. 61h Avenue and Oregon Street,
per the attached, is hereby approved with the following conditions:
1. SSM to increase the maximum allowed waterfront setback to 105', 133' and 47'
respectively.
OCTOBER 23, 2018 18-539 RESOLUTION
CONT'D
2. SSM to reduce the number of required parking spaces for Phase 1 from the
required 324 to 290 as indicated on the site plan.
3. SSM to reduce the number of required exterior bike parking space from 16 to 8 as
indicated on the site plan.
4. Master sign plan shall be submitted and approved as a separate planned
development amendment or meets the underlying RMU code requirements.
5. Revise lightning plan to meet the 0.4 foot-candles requirement for all vehicular
circulation areas.
6. SSM to allow a 6' fence within the waterfront front yard setback around the pool
/ clubhouse area with final design and materials to be approved by the
Department of Community Development.
7. SSM to reduce the required 6' deep balconies to allow 4-5' deep balconies.
8. Revise landscaping plan to include the required 440 street frontage landscaping
points along W 6th Avenue and the required 180 street frontage landscaping
points along Iowa Street.
9. Interior landscaping island shall be added for parking rows exceeding 20 spaces.
10. The final building elevations for the clubhouse shall be reviewed for consistency
with the approved multi-family buildings by the Department of Community
Development. If the elevations are found to be substantially different in design,
the applicant shall seek approval as a separate planned development
amendment.
i a�` E , . �aUA
Oshkosh
TO: Honorable Mayor and Members of the Common Council
FROM: Darryn Burich
Director of Planning Services
DATE: October 17, 2018
RE: Approve Conditional Use Permit and Specific Implementation Plan for Multi -
Family Development; Northwest Corner of W. 6th Avenue and Oregon Street
Commonly Referred to as the "Morgan District" (Plan Commissions
Recommends Approval)
BACKGROUND
The subject area consists of one parcel approximately 21.83 acres in size, located at the northwest
corner of W. 6th Avenue and Oregon Street. The subject area currently contains vacant land.
The site was the historical home to Morgan Company / Jeld-Wen facilities. The Oshkosh
Common Council previously approved a Conditional Use Permit (CUP) and General
Development Plan for the proposed development at their June 26th, 2018 meeting.
ANALYSIS
The applicant is proposing to develop approximately 11.52 acres of the site for apartments /
townhomes. The remaining acreage to the east would be reserved for future commercial
development and the remaining acreage to the west would be reserved for future multi -family
development. The proposed site development consists of a mixture of four 5 -story 54 unit multi-
family apartment buildings, 6 multi -unit townhome buildings, a clubhouse, pool and associated
surface parking areas. The applicant now proposes to move forward with Phase I of
development which includes the first three apartment building, clubhouse, pool, private drives
and associated surface parking lots. The units within the proposed buildings have been altered
to only include 0-2 bedroom units; the proposed development no longer includes three bedroom
units. Subsequent phases would add the remaining multi -family buildings and townhomes. In
order to proceed with Phase I of the development, the applicant must obtain a CUP to fulfill the
Special Area Design requirements and seek approval for the Specific Implementation Plan (SIP).
The applicant will need a Base Standard Modification to increase the allowed setback, to reduce
the number of required parking spaces for Phase 1, to reduce the number of required exterior
bike parking spaces, to allow a 6' fence within the waterfront front yard setback around the pool
/ clubhouse area and to reduce the required 6' deep balconies to allow 4-5' deep balconies. Final
City Hall, 215 Church Avenue P.O. Box 1 130 Oshkosh, WI 54903-1130 920.236.5000 hitp://www.ci.oshkosli.wi.us
storm water management plans will be reviewed during the Site Plan Review processes. The
Department of Public Works is working with the applicant on several utility easements and the
specifics for several utility connections. These items will need to be addressed prior to any
permit issuance as well as the completion of the Developers Agreement for the proposed
development. Master sign plan shall be submitted and approved as a separate planned
development amendment or meets the underlying Riverfront Mixed Use code requirements.
The lightning plan will need to meet the 0.4 foot-candles requirement for all vehicular circulation
areas. The landscaping plan will need to include the required 440 street frontage landscaping
points along W. 6th Avenue and the required 180 street frontage landscaping points along Iowa
Street. Interior landscaping island shall be added for parking rows exceeding 20 spaces.
The applicant has provided building elevations for the multi -family apartment buildings. The
Riverfront Overlay District (RF -0) area allows no more than 30% be made up of Class II or Class
III materials. The elevations are comprised of 70% Class I materials, utilizing a combination of
brick and windows. The RF -O area further requires upper and ground floors for residential uses
to be comprised of a minimum of 15% windows and doors. The proposed elevations meet or
exceed the RF -O requirements for both exterior materials and glazing. No building elevations
have been provided for the clubhouse at time. The final building elevations for the clubhouse
shall be reviewed for consistency with the approved multi -family buildings by the Department
of Community Development. If the elevations are found to be substantially different in design,
the applicant shall seek approval as a separate planned development amendment.
FISCAL IMPACT
Infrastructure will need to be extended to service this site with those costs being paid for by the
developer. TID #29 was projected to have a total improvement value of approximately $57.7
million and consist of residential, commercial and retail uses. The proposed residential
apartment units (approximately 400 units) should account for approximately $30 million
towards the original $57.7 million total, with the future phases adding additional value. These
assessed value numbers will become clearer as the developer seeks phased SIP approval for the
additional phases. The subject site is located in TID # 29 and will require approval of developer
agreements by Council for any financial assistance provided through TIF.
RECOMMENDATION
The Plan Commission recommended approval of the Conditional Use Permit and Specific
Implementation Plan with conditions at its October 16, 2018 meeting.
Respectfully Submitted,
, �, ' / 4,o �,
Darryn Burich
Director of Planning Services
Approved:
Mark A. Rohloff
City Manager
City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 920.236.5000 http://www.ci.oshkosh.wi.us
ITEM: CONDITIONAL USE PERMIT AND SPECIFIC IMPLEMENTATION PLAN
FOR A MULTI -FAMILY DEVELOPMENT LOCATED AT THE NORTHWEST
CORNER OF W. 6Ta AVENUE AND OREGON STREET, COMMONLY
REFERRED TO AS "THE MORGAN DISTRICT"
Plan Commission meeting of October 16, 2018.
GENERAL INFORMATION
Applicant/Property Owner. The Morgan District, LLC.
Action(s) Requested:
The applicant requests approval of a Conditional Use Permit for a Project Review within a Special
Area Design Review (Riverfront Overlay District, RF -O) for a multi -family development as well
as a Specific Implementation Plan to allow for construction of said development.
Applicable Ordinance Provisions:
Conditional Use Permit standards are found in Section 30-382 of the Zoning Ordinance.
Riverfront Overlay District standards are found in Section 30-245(B) of the Zoning Ordinance.
Planned Development standards are found in Section 30-387 of the Zoning Ordinance.
Property Location and Type:
The subject area consists of one parcel approximately 21.83 acres in size, located at the northwest
corner of W. 61h Avenue & Oregon Street. The subject area currently contains vacant land. The
site was the historical home to Morgan Company / Jeld-Wen facilities. The surrounding area is a
mixture of vacant land, single & two family residential and commercial land uses. The 10 and 20
Year Comprehensive Land Use Plans both recommend this area as Mixed Downtown.
Subject Site
Exzstin Land Use
Zonin
Commercial /Vacant
RMU-PD TO
Adjacent Land Use and 'Zoning
Existing Uses _ Zoning 777 7]
North Fox River
-- - - --- ---._.-�._.. _--------------- ----..._...-- .._........
South Single LekTwo Family Residential - . _ TR -10
.-..-_.....-._-_... _.-_. -- -----. -_.-..-__ — ..--- ----- ------
East Vacant RMU-PD RFO
West I Single & Two Family Residential RMU-PD RFO, TR -10
Comprehensive` Plan Ladd Use Recommendation
Lance Use `
10 Year & 20 Year Land Use Recommendation
Mixed Downtown
ANALYSIS
Use
The Oshkosh Common Council previously approved a Conditional Use Permit (CUP) and
General Development Plan (GDP) for the proposed development at their June 261h, 2018 meeting.
The applicant is proposing to develop approximately 11.52 acres of the site for apartments /
townhornes. The remaining acreage, approximately 5.3 acres, to the east would be reserved for
future commercial development and the remaining acreage to the west would be reserved for
future multi -family development. The proposed conceptual site development consists of a
mixture of four 5 -story 54 unit, 60' high multi -family apartment buildings and 6 multi -unit
townhome buildings. The Riverfront Mixed Use zoning district requires a CUP for both
apartments and townhomes. The developer has indicated approximately 400 residential units
upon being fully built out. The conceptual site also includes an approximately 3,000 sq. ft.
clubhouse, pool and associated surface parkin�'areas. Units in the multi-fan-fily building would
range from 600 sq. ft. one bedroom units to 1480 sq. ft. 3 bedroom units with final unit
composition being dependent on market demands. The conceptual townhomes consist of three 5 -
unit buildings with 2 bedrooms each and the 7 -unit buildings with 2 bedroom each. The
proposed 5 -story apartment buildings include first floor parking for the tenants.
The applicant now proposes to move forward with Phase I of development. Phase I is intended
to include the first three apartment building, clubhouse, pool, private drives and associated
surface parking lots. The units within the proposed buildings have been altered to only include
0-2 bedroom units, the proposed development no longer includes three bedroom units.
Subsequent phases would add the remaining multi -family buildings and townhomes. In order to
proceed with Phase I of the development the applicant must obtain a CUP to fulfill the Special
Area Design requirements and seek approval for the Planned Development's Specific
Implementation Plan (SIP).
Site Design/Access
The proposed development indicates two access drives. There will be one off of W. 611 Avenue
and one at the intersection of Iowa Street and W. 511, Avenue. The applicant has revised the W. 6f
Avenue curb cut to line up with Nebraska Street and has been narrowed to fulfill the concerns
raised by Department of Public Works during the GDP process. The W. 611, Avenue entrance
should still create a "gateway" appearance while eliminating the conflicts of the prior alignment.
Phase I will require a total of 324 parking spaces based on the 162 units proposed. The applicant
is proposing to provide 93 interior covered spaces and 197 surface spaces, totaling 290 provided
parking spaces for phase I of the development. The applicant is proposing a ratio of 1.15 parking
spaces per bedroom or 1.62 spaces per unit, code would require 2 spaces per unit for 0-2 bedroom
units. A Base Standard Modification (BSM) is required to reduce the number of required parking
spaces below the minimum required. It is the applicant's position that providing a ratio of 1..15
parking spaces per bedroom for the multi -family apartment buildings will meet the needs of the
pedestrian friendly development and given the removal of three bedroom units and an increase
ITEM. • CUI'.SIPMorgan District 2
number of 1 bedroom and efficiency -type units, 1.15 spaces per bedroom should be sufficient.
The applicant states the architect used on the project has design similar to projects in Wisconsin
with ratios as low as 0.72 units per bedroom without any issues / complaints from the residents.
At this time staff supports a BSM for reduced parking. It is the staff's opinion that based on the
developments unitmixed and location / proximity to the center city, the reduction of onsite
parking spaces should not have a detrimental effect.
In conjunction with the BSM for parking, the applicant is requesting a BSM for bike parking. The
zoning ordinance requires 16 outdoor spaces be provided for the development. The applicant is
proposing to include 98 bike parking stalls as part of phase I, however, only 8 of those stalls will
be exterior. The applicant is proposing 30 interior stalls per building with an additional 8 exterior
stalls near the clubhouse. The strict application of the ordinance requires a BSM be granted from
the 16 required exterior stalls to the 8 provided, but in staff's opinion the applicant has greatly
exceeded the intent of the bike stall parking requirement and has further justified granting the
BSM related to vehicle parking spaces.
The Riverfront Mixed Use District allows a maximum waterfront setback of 45'. Exact setback
dimensions have been provided as part of the SIP, the proposed buildings exceed the maximum
allowed setback. Moving from east to west the setbacks are 105',133' and 47' respectively. Due
to the natural meander of the riverfront and its associated ordinary high water mark, in
conjunction with the environmental challenges of the site, it is not practical to meet the 45'
maximum setback. Staff supports a BSM request to increase the maximum setbacks to the
aforementioned distances, the unique site characteristic combined with the proposed building
layout should aid in maximizing water views for all units and should not have a detrimental
impact on the overall development or the adjoining area.
The applicant is requesting a BSM to be allowed to construct a 6' fence within the waterfront front
yard. Code would allow a maximum of V. The applicant has not yet determined the final design
and materials of the fence but has generally described the fence and a combination of providing a
minimum level of privacy combined with provided sufficient security for the pool area. Staff is in
support of the SSM to increase the overall height of the fence but recommends final design /
material of the fence be approved by the Department of Community Development.
Storm Water Management/Utilities
Storm water management plans have been submitted and are being review by the Department of
Public Works and appear to be generally in compliance with the cities requirements. Final
approval of the storm water management plans will be required during the Site Plan Review
processes.
The Department of Public Works is working with the applicant on several utility easements and
the specifics for several utility connections. These items will need to be addressed prior to any
permit issuance as well as the completion of the Developers Agreement for the proposed
development.
ITEM; CIIP.SIPMorgan District
Landscaping
Building Foundation
Code requires 80 landscaping points per 100 linear feet of foundation. Each apartment building is
approximately 616 linear feet and the club house is approximately 270 linear feet. Phase I will
require 1,694 landscaping points. The applicant tis proposing 1,735 point. The applicant has also
met the requirements for location of building landscaping within 10' of the buildings and the
required percentage of points devoted to the main entrances.
Paved Area
Code requires 50 landscaping points per 10 parking stalls or 10,000 sq. ft. of paved area, equating
to a required 985 paved area landscaping points for the parking areas. The plan indicates 1,035
points provided. The code further specifies 30% of all points will be devoted to medium or tall
trees and 40% will be devoted to shrubs. The proposed plan is deficient in parking lot interior
islands. Code requires parking rows with more than 20 spaces to include interior landscaping
islands with a maximum of 180' between islands. The applicant will need to revise the
landscaping plan to include the require island which may result in a loss of approximately 4
parking spaces.
Street Frontage
Code requires 100 points per 100' of street frontage. The subject area has 440' of frontage along
W. 611, Avenue and approximately 180' of new development area along Iowa Street. The current
plan shows no landscaping along either W. 6f Ave. or Iowa Street. The applicant will need to
add the required 440 points along W. 611, Ave. and 180 points along Iowa Street. The plan does
indicate 720 landscaping points being provided along W. 511' Avenue. This portion of W. 51�
Avenue will be a private street. At this time no landscaping will be required along Oregon Street
as that portion of the applicant property was not part of the original Planned Development.
Signage
The applicant has not provided a sign plan. However, the applicant has requested a BSM to be
allowed for up to two signs along Oregon Street and one Iowa St. / W 51h Avenue. At this time,
staff is not comfortable with issuing a BSM for more signs than would be permitted by the
underlying Riverfront Mixed Use (RMU)- Riverfront Overlay (RFO) zoning district. Without an
idea of what these signs would potentially look like and how they would be integrated into the
overall sign package, staff cannot support the request. It is the staff's opinion that the applicant
be required to submit a master sign plan as a separate Planned Development amendment or
meets the underlying 104U code requirements.
Site Lighting
A photometric plan has been provided by the applicant. The provided plan does not meet the
minimum 0.4 foot-candles requirement for vehicle circulation areas at the drive entrance off of
Iowa St. / W 51� Avenue. The provided plan is in compliance with the maximum allowed 0.5 foot-
candles at the property lines. The lighting plan will need to be revised to meet the code
requirements prior to final approval during the Site Plan Review processes.
ITEM: CURSIP Morgan District 4
Building Facades
The applicant has provided building elevations for the multi -family apartment buildings. Staff
has reviewed them for compliance with both the multi -family design requirements and the
Special Area Design Standards for the Riverfront Overlay District (RF -0). The RF -0 area allows
no more than 30% be made up of Class II or Class III materials. The elevations are comprised of
70% Class I materials, utilizing a combination of brick and windows. The RF -0 area further
requires ground floors for residential uses to be comprised of a minimum of 15% windows and
doors and upper floors to also be comprised of 15% windows and doors. The proposed
elevations meet or exceed the RF -0 requirements for both exterior materials and glazing. The
applicant is requesting one BSM related to the RF -0 design requirements. The RF -0 requires
functional patios or balconies with a minimum depth of 6'.. The applicant is requesting to be
allowed to have some balconies range from 4-5' deep. The applicant believes by providing
balconies with larger widths (in some cases up to 14') they meet the intent of the "functional patio
/ balconies" requirement even though they do not meet the strict code requirement of 6' deep.
Staff is in support of the request BSM as wider balconies should serve to, meet the intent of the
code provision.
No building elevations have been provided for the clubhouse at time. Staff recommends a
condition be placed that allows the Department of Community Development to approve the
clubhouse elevations as long as they are consistent with the design on multi -family buildings. If
the design is significantly different from the multi -family buildings, the applicant shall be
required to seek approval as a separate plan development amendment.
FINDINGS/RECOMMENDATION/CONDITIONS
In its review and recommendation to the Common Council on an application for a Conditional
Use Permit, staff recommends the Plan Commission make the following findings based on the
criteria established by Chapter 30-352 (F)(3):
(1) Is in harmony with the Comprehensive Plan.
(2) Would not result in a substantial or undue adverse impact on nearby property, the
character of the neighborhood, environmental factors, traffic factors, parking, public
improvements, public property or rights-of-way, or other matters affecting the public
health, safety, or general welfare.
(3) Maintains the desired consistency of land uses, land use intensities, and land use
impacts as related to the environs of the subject property.
(4) The conditional use is located in an area that will be adequately served by, and will not
impose an undue burden on, any of the improvements, facilities, utilities or services
provided by public or private agencies serving the subject property.
(5) The potential public benefits outweigh any potential adverse impacts of the proposed
conditional use, after taking into consideration the applicant's proposal and any
requirements recommended by the applicant to ameliorate such impacts.
ITEM. • CUASIP Morgan District 5
In its review and recommendation to the Common Council on an application for a Planned
Development district, staff recommends the Plan Commission make the following findings based
on the criteria established by Chapter 30-387 (C)(6):
(a) The proposed Planned Development project is consistent with the overall purpose and
intent of this Chapter.
(b) The proposed Planned Development project is consistent with the City's
Comprehensive Plan and other area plans. (It is the responsibility of the City to determine
such consistency.)
(c) The proposed Planned Development project would maintain the desired relationships
between land uses, land use densities and intensities, and land use impacts in the environs
of the subject site.
(d) Adequate public infrastructure is or will be available to accommodate the range of
uses being proposed for the Planned Development project, including but not limited to
public sewer and water and public roads.
(e) The proposed Planned Development project will incorporate appropriate and adequate
buffers and transitions between areas of different land uses and development
densities/intensities.
(f) The proposed Planned Development project design does not detract from areas of
natural beauty surrounding the site.
(g) The proposed architecture and character of the proposed Planned Development project
is compatible with adjacent/nearby development.
(h) The proposed Planned Development project will positively contribute to and not
detract from the physical appearance and functional arrangement of development in the
area.
(i) The proposed Planned Development project will produce significant benefits in terms
of environmental design and significant alternative approaches to addressing
development performance that relate to and more than compensate for any requested
exceptions/base standard modifications variation of any standard or regulation of this
Chapter.
(j) For Planned Development projects that are proposed to be developed in phases, the
applicant can provide a timeline for development and can demonstrate that the project
would be successful even if all phases were not or could not be completed.
Staff recommends approval of the Conditional Use Permit and Specific Implementation Plan with
the findings listed above and the proposed following condition:
1. BSM to increase the maximum allowed waterfront setback to 105',133' and 47'
respectively.
2. BSM to reduce the number of required parking spaces for Phase 1 from the required 324 to
290 as indicated on the site plan.
3, BSM to reduce the number of required exterior bike parking space from 16 to 8 as
indicated on the site plan.
4. Master sign plan shall be submitted and approved as a separate planned development
amendment or meets the underlying RMU code requirements.
ITEM. • CMSIPMorgan District
5. Revise lightning plan to meet the 0.4 foot-candles requirement for all vehicular circulation
areas.
6. BSM to allow a 6' fence within the waterfront front yard setback around the pool /
clubhouse area with final design and materials to be approved by the Department of
Community Development. ,
7. BSM to reduce the required 6' deep balconies to allow 4-5' deep balconies.
8. Revise landscaping plan to include the required 440 street frontage landscaping points
along W Oh Avenue and the required 180 street frontage landscaping points along Iowa
Street.
9. Interior landscaping island shall be added for parking rows exceeding 20 spaces.
10. The final building elevations for the clubhouse shall be reviewed for consistency with the
approved multi -family buildings by the DepartmeiA of Community Development. If the
elevations are found to be substantially different in design, the applicant shall seek
approval as a separate planned development amendment.
The Plan Commission approved of the Conditional Use Permit and Specific Implementation Plan as
requested with conditions. The following is the Plan Commission's discussion on this item.
Mr. Lyons presented the item and reviewed the site and surrounding area. He explained that the
Oshkosh Common Council previously approved a Conditional Use Permit (CUP) and General
Development Plan (GDP) for the proposed development at their June 26th, 2018 meeting. The
applicant now proposes to move forward with Phase I of development. Phase I is intended to
include the first three apartment building, clubhouse, pool, private drives and associated surface
parking lots. The units within the proposed buildings have been altered to only include 0-2
bedroom units and no longer includes three bedroom units. Subsequent phases would add the
remaining multi -family buildings and townhomes. The applicant has provided building
elevations for the multi -family apartment buildings. The proposed elevations meet or exceed the
Riverfront Overlay District requirements for both exterior materials and glazing. No building
elevations have been provided for the clubhouse at time.
Mr. Borsuk asked if there was any consideration for the remaining undeveloped portion of the
site to be landscaped as grass.
Mr. Lyons stated staff did not feel it was appropriate to condition at this time but it could
definitely be part of this discussion.
Ed Bowen (The Morgan District, LLC), 601 Oregon Street, recapped some of the highlights from
the General Development Plan discussions. He said there has been some modifications in the last
couple months to the renderings and exterior. He stated the initial plans had a significant amount
of metal on the exterior. He said in order to achieve the 70% Class I materials requirements, the
majority of the metal has been replaced with brick, which mirrors more closely with some of the
existing neighborhood. Mr. Bowen brought examples of the materials and floor plans. He stated
there has also been an increase to the glass on the structures which has been evenly distributed
throughout the units. He explained the clubhouse did not have a 2-demnsional elevation but he
did bring in a rendering. He presented the rendering and explained that the clubhouse does have
ITEM. CURSIP Morgan District
similar materials and styles as the apartments. He added that he did not anticipated any
deviation from the overall design of the clubhouse rendering.
Mr. Borsuk asked if there was a plan for the build out of the site.
Mr. Bowen replied there is not because they are still in the process of finding users for the
commercial side of the site. He added they are hoping to get significant commercial in the
remaining parts of the site. He stated there is no real timeline and that there is currently grass at
the area by Oregon Street.
Mr. Borsuk inquired about the timeline for the residential/west side of the site,
Mr. Bowen responded the residential area would be dependent on the demand of the market. He
said they may know more about the demand once the first building goes online. He explained
how the fifth floor is designed for condo -like replacement units with dens.
Mr. Borsuk asked if there were intentions to grass the area where the townhomes would be
located by 6th Avenue.
Mr. Bowen responded they most likely would not be grassing the area because of the soon to be
work to be completed in that area. He mentioned there are cap requirements for the site and they
would have to meet those requirements.
Mr. Fojtik commented that the proposed buildings looked extremely attractive.
Mr. Bowen stated the site is very modern. He explained the reason why they chose the architect
that they did for designing the site.
Ms. Propp stated there is also a modern look across the river. She said she loves balconies but has
some concerns about the balcony sizes with only being 4 feet wide.
Mr. Bowen said some balconies have more depth than others. He explained the balconies are not
bolt on balconies but are built in balconies and support the structure which has more impact on
the size of the balconies.
Joseph Lee (JLA Architects), 311 E. Chicago Street, stated the smaller units have the smaller
balconies. and some units have no balcony.
Mr. Bowen stated the balconies are scaled appropriately for each unit. He explained there was a
unique variation in units from the condo -like replacement units to micro units that are 400 square
feet.
Ms. Propp asked if they were market rate units.
Mr. Bowen responded they are and have no intentions of doing tax credits or similar programs.
ITEM. • CURSIPMorgan District
Mr. Borsuk asked if all three buildings were going to be built at the same time.
Mr. Bowen replied they would be built out in phases. He predicted around three years with a
best case scenario of 18-24 months. He mentioned they would still have to go through Site Plan
Review as well as other steps in order to start the development.
Motion by Vajgrt to approve the conditional use permit and specific implementation plan fora multi-
family development located at the northwest corner of W. 6th Avenue and Oregon Street, commonly
referred to as 'The Morgan District" with the following conditions:
1. BSM to increase the maximum allowed waterfront setback to 105',133' and 47' respectively.
2. BSM to reduce the number of required parking spaces for Phase 1 from the required 324 to 290 as
indicated on the site plan.
3. BSM to reduce the number of required exterior bike parking space from 16 to 8 as indicated on the
site plan.
4. Master sign plan shall be submitted and approved as a separate planned development amendment
or meets the underlying RMU code requirements.
5. Revise lightning plan to meet the 0.4 foot-candles requirement for all vehicular circulation areas.
6. BSM to allow a 6' fence within the waterfront front yard setback around the pool I clubhouse area
with final design and materials to be approved by the Department of Community Development.
7. BSM to reduce the required 6' deep balconies to allow 4-5' deep balconies.
8. Revise landscaping plan to include the required 440 street frontage landscaping points along W 6th
Avenue and the required 180 street frontage landscaping points along Iowa Street.
9. Interior landscaping island shall be added for parking rows exceeding 20 spaces.
M. The final building elevations for the clubhouse shall be reviewed for consistency with the approved
multi family buildings by the Department of Community Development. If the elevations are found
to be substantially different in design, the applicant shall seek approval as a separate planned
development amendment.
Seconded by Hinz.
Ms. Propp reiterated on Mr. llojtWs comment and said she feels this is going to be a marvelous
development.
Mr. Fojtik added the development also has a good range of units.
Ms. Propp asked where the Riverwalk was located on the property.
Mr. Lyons showed where it was on the aerial photo.
Motion carried 9-0.
ITEM: CUP.&P Morgan District
"PLEASE TYPE ail PRINT USING BLACK INK
APPUC IN ORMAT C)N �]
Petilloner: _ jar P4 V -(,j - 15 7�i C ?'.. � ,L Date: G tt
Pelitioner's'Address: �� 0Qtu'') ST, YT -6 1. City: OSli �$' wState: Zip:
c
Telephone #: (`()�' ' L=ax: ( j117 Other Contact # or Ernall: �l, ►� d+1
Status of Peiitlonor (Please Check . �( w r r-. re ntallve Tenant .: Praspecfive Buyer
Petitioner's Signature (required): 1 pate;
OWNER INFORMATION
Owner(s): 1A A9O,f6
Owner(s) Address: City:
Telephone #: ( ) Fax: [ }
Date:
State: zip;
Other Contact # or Email:
Ownership Status (Please Check): = - Individual :_: Trust Parinershfp A- Corporafion
Property Owner Consent: (required)
By signature hereon. I/We acknowledge that City officials and/or employees may, In the performance of their functions,
enter upon the property to inspect or gather other Information necessary to process this application. I also understand
that all meeting dates are te=mabey1he,Plnning Services Division for incomplete submissions
or other administrative reasolProperty Owner's Signature: Dale: 4'--7�/ P
SITE INF9fj lAiJOj+( v
Address/Locaflon of Proposed Project: ) Da66m) _ , T_. �
Proposed Project Type: j�1U L`��ivt) ir`� U rf �( P sv► "}
Current Use of Properly:
Land Uses Surrounding Your Site:
Eng: MV- Pru
North: 0-1 \1 "_ C "I V ie—,Am I LA
South: CID WMVA(_ I AL GS lI `N7 114 L
East: V 14 L14 rJr L►ko / o VK tkn G&2 t A L
West: `� 5 ��EA) Ti o t trti—O7 IP ?
"Please note that a meeting notice wilt be mailed to all abutting property owners regarding your request.
It Is recommended fhaf the applicant rrLeel with Planning Services stats prior to submittal to discuss the proposal.
y Application fees are due at time of submittal. Male check payable to City of Oshkosh.
r Please refer to the fee schedule for approprlale fee. FEE IS NON-REFUNDABLE
For more information please the City's website at www.ci.osl)kosh.wi.us/Commilnily_Dovelopnient/Plarining.htm
Staff Date Rec'd
SUBMIT To.
City of Oshkosh Application
Oepf.ofCommiir*jDeyeiopmenl
City
215 Church Ave., F.O, Box 113D
O41
Conditional Use Permit
Oshkosh ,YfisconsinSAM3-1130
shkosh
PHOW. (420) 236-5059
"PLEASE TYPE ail PRINT USING BLACK INK
APPUC IN ORMAT C)N �]
Petilloner: _ jar P4 V -(,j - 15 7�i C ?'.. � ,L Date: G tt
Pelitioner's'Address: �� 0Qtu'') ST, YT -6 1. City: OSli �$' wState: Zip:
c
Telephone #: (`()�' ' L=ax: ( j117 Other Contact # or Ernall: �l, ►� d+1
Status of Peiitlonor (Please Check . �( w r r-. re ntallve Tenant .: Praspecfive Buyer
Petitioner's Signature (required): 1 pate;
OWNER INFORMATION
Owner(s): 1A A9O,f6
Owner(s) Address: City:
Telephone #: ( ) Fax: [ }
Date:
State: zip;
Other Contact # or Email:
Ownership Status (Please Check): = - Individual :_: Trust Parinershfp A- Corporafion
Property Owner Consent: (required)
By signature hereon. I/We acknowledge that City officials and/or employees may, In the performance of their functions,
enter upon the property to inspect or gather other Information necessary to process this application. I also understand
that all meeting dates are te=mabey1he,Plnning Services Division for incomplete submissions
or other administrative reasolProperty Owner's Signature: Dale: 4'--7�/ P
SITE INF9fj lAiJOj+( v
Address/Locaflon of Proposed Project: ) Da66m) _ , T_. �
Proposed Project Type: j�1U L`��ivt) ir`� U rf �( P sv► "}
Current Use of Properly:
Land Uses Surrounding Your Site:
Eng: MV- Pru
North: 0-1 \1 "_ C "I V ie—,Am I LA
South: CID WMVA(_ I AL GS lI `N7 114 L
East: V 14 L14 rJr L►ko / o VK tkn G&2 t A L
West: `� 5 ��EA) Ti o t trti—O7 IP ?
"Please note that a meeting notice wilt be mailed to all abutting property owners regarding your request.
It Is recommended fhaf the applicant rrLeel with Planning Services stats prior to submittal to discuss the proposal.
y Application fees are due at time of submittal. Male check payable to City of Oshkosh.
r Please refer to the fee schedule for approprlale fee. FEE IS NON-REFUNDABLE
For more information please the City's website at www.ci.osl)kosh.wi.us/Commilnily_Dovelopnient/Plarining.htm
Staff Date Rec'd
Melly explain how the proposed conditional use will not have a negative effect on the Issues below.
1. Health. safely, and general welfare of occupants of surrounding lands.
I� 1maa)4rt\/r
2. Pedestrian and vehicular circulation and safely.
3. Noise, air, water, or other forms of environmental pollution.
4. The demand for and availobilily of public services and facilities.
5. Character and future development of the area.
SUBMITTAL REQUIREMENTS —Must accompany the appticallon to be complete.
y A narrative of the proposed conditional use and project Including'
❑ Proposed use of the property
❑ Existing use of the property
❑ Identification of structures on the property and discussion of [heirrelaflon to the project
Q Projected number of residents, employees, and/or daily customers
❑ Proposed amount of dwelling units, floor area, landscape area, and parking area expressed in square feet and
acreage to the nearest one-hundredth of an acre
❑ Effects on adjoining properties to include., noise, hours of operation, glare, odor, fumes, vibral(on, etc.
o Surrounding land uses
❑ Compatibility of the proposed use with adjacent and other properties in the area.
a Traffic generation
❑ Any other informalfon pertinent to adequate understanding of the intended use and its relation to nearby properties
A complete site plan Including;
❑ Two (2) full size (24" x 36") scaled and dimensioned prints of site plan and building elevations
g Two (2) 8'h" x I 1 (minimum) to t l " x 17" (maximum) reduction of the building elevations and site plan
cl One compact disc or diskette with digital plans and drawings of the project In AutoCAD 2000 format with fonts and
plot style table file (i€ plans have been prepared digitally)
o Title block that provides all contact information for the petllionerand/or owner, if different
a Full name and contact information of petitioner's engineers/surveyors/orchitects, or other design professionals used in
the plan preparation
* The date of the original plan and latest date of revision to the plan
Is A north arrow and graphic scale. Said scale is not to be smaller than one inch equals sixty feet (1"W 60') unless
otherwise approved by the Department of Community Development prior to submittal
❑ All property Ilnes and existing and proposed right-of-way lines with bearings and dimensions clearly labeled
❑ All required building setback and offset lines
Q All existing and proposed buildings, structures, and paved areas, including building entrances, walks, drives, decks,
patios, fences, walls
❑ Local'ton of all outdoor storage and refuse disposal areas and the design and materials used for construction
a Location and dimension of all on-site parking (and off-slte parking provisions if they are to be employed), including a
summary of the number of parking stalls provided per the requirements of Section 30-175 City of Oshkosh Zoning
Ordinance
❑ Location and dimension of all loading and service areas on the subject property
❑ Location, height, design, illumination pourer and orientation of all exterior lighting on the property including a
photornetrfcs plan
❑ Location of all exterior mechanical equipment and utilities and elevations of proposed screening devices where
applicable (Le. visible from a public street or residential use or district), Mechanical equipment Includes, but is not
limited to, HVAC equipment, electrical transformers and boxes, exhaust flues, plumbing vents, gas regulators,
generators
Aft $U8WrTo:
City of Oshkosh De -pt. of Commurily C evelopment
Planned Development 215 Church Ave., P,O, Box 1 130
C11yf Pld Dlt Application oNoa�f1 5490n11
Oshkosh
For General Development Plan or Specific Implementation Plan
"PLEASE TYPE OR PRINT USING BLACK INK"
APPLICANT INFORMATION
Petitioner: Date:
Petitioner's Address: [��S �� �T,. ITE City: 6�qvl_os Slate: zip:.019 oz-
Telephone
Z
Telephone #: (r'10 I Fax: ( } Other Contact It or Email; Ca.
[ tV4
Status of Petitioner (Please Check): er : Re FEs� tative T nt Prospective Buyer
Petitioner's Signature (required): Date: / y�
OWNER INFORMATION np
Owner(s):_l1ffh'r Kr}GT - Date:
Owner(s) Address: - __ __ _ City: stale: Zip:
Telephone #: ( ) Fax: ( ) Other Contact ## or Email:.. _
Ownership Stalus' (Please Check). -_ Incilvidual t_ Trust 1 Parinership ;.i Corporation
Property Owner Consent: (requires!)
By signature hereon, i/We acknowledge ihof City officials and/or employees may, in the performance of their functions, enter
upon the property to inspect or gather otherinformallalt necessary to process this application. I also undersfand that all
meeting dates are fentailve and maybe p stp}� by the Planning Services Division for incomplete submissions or other
administrative reasons. d 7/ AI
Property Owner's Signature _ Date: P
TYPE -OF REgy_ESL
C] General Development Plan (GDP) Cl General Development Plan (GDP) Amendment
13 Specific Implemenfallon Plan (SIP) KSpecilic Implementation Plan (SIP) Amendment
SITE INFORMATION
Address/ Location of Proposed Project: , q2i
Proposed Project Type: __...ivlV�-'f .I. Ftp Zvi I t ,� 1) C461 -OP I:vi V N) 'r
Current Use of Properly: Lia 0 Zoning:
Land Uses Surrounding Your t,r l r 140 t 1
South: COY ff1Cl t tiT L
East: V4C l4ta-T C0 v1APA 1� t vi L
West: CS 1 b+11'T I L L}614 -r-
' -
N rJ�
'- It Is recommended that the applicant meet with Planning Services staff prior to submittal to discuss the proposal.
Y Application fees are due at time of submittal. Make check payable to City of Oshkosh.
Please refer to the fee schedule for appropriate fee. FEE -IS NON-REFUNDABLE
For more information please visit the City's website at www.ci.Oshkosh.wi.us/Coiylthunity..Development/Planning,htm
Staff Dofe Rec'd
10
• Specific treatment and location of recreational and open space areas, including designafion of '
any such areas to be classified as common open space.
ri Proposed grading plan.
Q Specific landscaping plan for the subject site, specifying the location, species, and installation size of
plantings. The landscaping plans shall include a table summarizing all proposed species.
e� Architectural plans for annonresidential buildings, multi -family structures, or building clusters, other than
conventional single-family or Iwo -family homes on individual lots, in sufficient detail to indicate the floor
area, bull;, and visual character of such buildings.
Q Englneedng plans for all water and sewer systems, stormwater systems, roads, parking areas, and
walkways.
• Signage plan for the project, including all project identification signs, concepts for public fixtures and signs,
and group development signage themes that may or may not vary from City standards or common
practices.
cr Specific written description of the proposed SIP including:
• Specific project themes and Images.
Specific mix of dwelling unit types and/or land uses.
Specific residential densities and nonresidential intensifies as described by dwelling units per acre,
and landscaping surface area ratio and/or other appropriate measures of density and Intensity.
Specific treatment of natural features, including parkland.
Specific relationship to nearby properties and public streets.
• Statistical data on minimum lot sizes in the development, the precise areas of all development lots
and pads; density/intensity of various parts of the develop men f; building coverage, and
landscaping surface area ratio of all land uses; proposed staging; and any other plans required by
Plan Commission.
A statement of rationale as to why PD zoning is proposed This-slatemenf shall list the standard
zoning requirements that, in the applicant's opinion, would inhibit the development project and the
opportunities for community betterment that are available through the proposed PD project.
A complete list of zoning standards that would not be met by the proposed SIP and the locaflon(s)
in which such exceptions/base standard modifications would occur.
Phasing schedule, if more than one development phase is intended.
cr Agreements, bylaws, covenants, and other documents relative to the operational regulations of the
development and particularly providing for the permanent preservation and maintenance of common
open areas and amenities.
❑ A written description that demonstrates how the SIP is consistent with the approved GOP and any and all
differences between the requirements of the approved GDP and the proposed SIP.
I hereby certify that to the best of my knowledge all required application materials are included with this
application. I arta aware that failure to submit the required completed application materials may result In denial or.
delay of the application request,
Applicant's Signature (required): Date: /
11
'THE MORGAN PARTNERS
Professional Real Estate Services
The Morgan District -- Oshkosh, WI
Project Narrative - SIP/SAD Review
The Morgan Partners LLC, an Oshkosh based partnership, is pleased to submit the
attached plans for consideration by the City of Oshkosh as part of it's redevelopment of the
former Morgan Boors/Jeid-Wen facility at Oregon Street and the Fox River. At project
completion, we believe this project will consist of a great mix of commercial/retail uses, as well
as hundreds of high quality multifamily apartments of varying styles- from townhouses to
condos to high rise residential buildings, This narrative is intended to address the necessary
base standard modifications, as well as provide the necessary info to complete the full PD
review as well as comply with the Special Area Design (SACT) district review process for the RFO
overlay district.
Our site, which will consist of 54 units per building over 3 buildings during this first
phase of construction, which also eventually include commercial office/mixed use
development, condominium units and townhouse style rental units. We were approved for the
general development plan in June, with a substantially similar development pattern, and units
that were similar in appearance. We have since finalized our parking layouts, selected more
detailed building materials, and provided further details to city staff on our intention to phase•
this development over the next 2-3 years. By reserving_the farthest east part of our site for a
possible commercial office development, we allow the maximum amount of flexibility as we
continue discussions with users for that site, but get the overall development kicked off still in
2018, with unit turnovers ready for late 2019, ideally, The final site plan we are submitting
includes a very good mix of high-density residential units planned for the first phase, ample
parking to serve those units, as well as high levels of interconnectedness to waterfront
recreational activities by providing passive green spaces, active spaces such as the pool deck
and other areas. Stormwater features are integrated seamlessly into the larsdscape in many
areas due to our proximity to the river and high water table, meaning more of our site can be
utilized actively. To be certain, this is a vast improvement over both future and current
conditions on site and should serve as a catalyst for activity on the south side of the Fox River,
Following our GDP approval in June of 2018, we have incorporated several changes to
the site plan as well as the initially proposed building elevations to address a handful of items
that needed base standard modifications or incorporate feedback from the City of Oshkosh and
12
other stakeholders. Below is a list of remaining BSM's needed by the project because of site
conditions, design restrlctions and other items.
0 Elevations-, All elevations are compliant with material standards for the RMU/RFO
district, Sufficient amount of window openings are present on all floors and all material
reach the 70% threshold of Class I material as proscribed. In addition, we have provided
balconies on all 4 sides of the property that are integrated into the structure of the
building and are therefore made more of an integral part of the floorplan, adding to the
already highly designed feeling of interconnectivity to the water and outside living'
areas. A base standard modification is needed, however, for the depth of the balcony
areas, which range in depth from 4-5 feet, shy of the RFD requirement of 6 feet. This is
offset, however, by the larger widths of these balconies, which in some instances are as
wide as 14 feet, creating a larger, more functional outdoor living area, and therefore
meeting the spirit of the code if not the exact letter.
• Signage: While a final signage plan has not yet been determined, we do anticipate
having multiple development signs at the main entrance, which would require a BSM to
allow up to 2 signs along the Oregon Street ROW and potentially a sign along the Iowa
S./5th Ave. ROW. While we would like to obtain this BSM as part of the SIP process, we
will make every effort to comply with the code overall, with any necessary BSMs to be
handled in a future PD amendment and potentially the submittal of a master sign plan.
• Site plan:
o Setbacks: As approved during the GDP review, our site plan does not follow the
development pattern established by previous riverfront projects, with buildings
oridrited parallel to the river. By, necessity, to obtain the density desired by both
the City of Oshkosh and the developer, we have oriented our buildings
perpendicular to the river to maximize the views from the "side" units and
increase the feeling of connectedness to the water from all parts of the building.
This also allows us to maximize water views from the future phases of the
project, which will be constructed south of the buildings and will have views
through the openings between buildings. Due to the natural meander of the
riverfro6t (.as -defined by the "ordinary high water mark"), as well as site specific
items such as environmentally Sensitive areas, floodways and potential wetlands,
it is not practical for our buildings to meet the maximum setback of 45'. Our
buildings (at 105", 133' and 47', respectively) are sited specifically to provide
maximum waterfront exposure to all residents in all parts of the building. Were
we to place the buildings in a manner that met this setback, there would be a
staggered pattern that would force the eastern buildings to black water views
from the future buildings, putting the future phases of construction at a
13
detriment and making the site seemed scattered and poorly planned. Complying
with a 45' maximum setback on our site simply is not feasible given the
curvature of the shoreline and the natural elements present on this site.
o Paving: We also anticipate a SSM necessary in order to pave within the setback
area in order to provide additional connections to the Riverwalk.
o Parking: We will be providing parking onsite in a number of different ways,
including covered, structured parking available for rent as well as surface parking
in the corridors between buildings. While our parking count is shy of the
required 2 stalls per unit of 0-2 bedrooms, we believe that.in all practicality,
these stalls will riot be necessary. First and foremost is the growing desire from
many downtown residents to not have a car. This development is pedestrian
friendly enough that going without a vehicle, which is a growing preference
among renters, will be feasible. In addition, we have a large number of one
bedroom (and small number of efficiency -type units) that will most likely be
occupied by single residents, making the number of required' vehicle spaces
unlikely to be necessary. We feel a more applicable method of parking
measurement is in the stall/bedroom metric, which gives us a 1.15/1312 as
opposed to our 1.62/unit, which is shy of the 2/unit required by code. In
reviewing with our architect, they have designed projects in Wisconsin that have
parking ratios as low as .72/unit but have generally maintained counts above
1/1311 and have not had any complaint from ownership/management of those
projects.
a Bike Parking: This is an additional item that will require a BSM, as we intend to
meet the spirit of the ordinance by providing bike storage racks combined with
every interior parking garage spot, giving us more than 30 interior stalls per
building, well in excess of the 16,we are required for the overall development.
We do anticipate providing a number of "visitor' bike racks in a location near the
clubhouse, however, and would ask that we be permitted to reduce our exterior
space in half to 8, placed in compliance with the code at a location approved by
Dept. of Community Development staff.
Landscaping: While not technically a landscaping item, we will require a BSM for the
fencing surrounding the pool deck, which will need to be 6' (as opposed to the 4'
allowed by code) in order to provide safety and security for the residents using the pool
and associated facilities. We also anticipate a BSM to ensure that we are not required to
do "offsite" landscaping. While the parcel has frontages along 3 major roads, the work
area at the moment is limited to a portion of 6th Avenue. The parcel frontage on Oregon
is not being touched as part of this phase and as such we do not anticipate landscaping
that now, as we would likely be forced to remove it in 12-24 months for future
development along that part of tho site.
14
In discussion with city staff on these items over the past several months, we believe that this
project is the right site plan at the right time, and believe these BSM requests should be
palatable to staff as we are complying with as much of the ordinance as is feasible, with
deviations only occurring when absolutely necessary. We are very excited to have brought this
project far enough that we are discussing items this specific and are looking forward to
continuing to work with the City of Oshkosh to make this project a reality. This is a once in a
lifetime opportunity for a group with deep roots in this community and we anticipate
continuing down the road to maximize the potential of this site for future generations.
15
O
-73
a � � �. �►- ,f �I ICS -
is �1 VMS.� �
�teli 9low� ai` �e�i�.a6t51�� ar r5 ��s i ��3�l�iimwool •
---------------
...a.eVxmmxw Kmu -
G41rn.t.r..ulw16
rJ lnnvu.nArA n0 I rv-�..
�.w I
wryWr {
AVl.w. wHnvdrnlrkroonw PI.IY _ r
�OW+saMaWolmll. n. rOl. w-
rauYiurawu h.x.[IrrS µ[K roWts 1 i' 1 1 1 1 1[ 1 1 I I, 1 I I' k I I k 11 E 1 €! [ I i 11 I I I A
sa.lslurasx.sh«nr uuranu I � � L �'alb-J•"ww•�.a••..•�f-{;;a<��a.,, .+••..,. I
n..,.wsa.r,...
6..Y.rr
1M.rlr•OM.uL
wMeJOMw
relwe.xa.*...
sx•.wnr
Rxrwu.u..xna.rom u
I I ! ! 1 !
wyRw.n r+,ImvmrwAlmuxn.
!.
Mnxmr.nz„etaarR..n.la.ouW�lwwrer.a
-
'
I
Nnununa05W rHnw O.RwlY11V.M..IA..
!I
...l .__ -
Rr�l
d
N+q.lrtl Wi4pn' AfJ Mww
ow.l,l-r
numsar WRwnttsnawo >W rrYM
-----L f' —/ /
*
�-•%"��'.
wwwalrw,or slw raw
rl.::w�arw:n.d:a�.r: ry.r.ma
T--1 r:i',r-�'-y
•�^
Abu ruxx..Ra..ni STir w.nr
` I i '! .�'1��.1 L,•..^p%
rwd�=b
rcraw.r•, w+l.11sws¢upsraurwd.l...
la,.:px[m10 f0'o(R.r:iw,
' I�
` I I ! i.
r4 -:-
/ .I:N • ` "�"' �..
1
Ilva. S.�.a.una:.
t0-11VV•Ya.
�.r Lr.Rr..nr .0
r...lydrer.a:u.er oRw.o
3
j I � r' ' s'L
.��•j.,�Y�� .__ -�•
lo0y.lm.r�[10014 WNurwp.
I 1'
�nt �'�
wniN or YLLN0I. L....r.: f.f if
� •�/ , 'I-.. _. :�%
rrwaaa..nRwn zmraw
I m
r..f.
ORp.wnV.'Irr000Y agolrMtt.m.Im1[y11mryK
.uuay A.laryr.
yr 3 �w� �4�
'Y _
An. Nr.tlr.V..v_nI WIWInL IlnAi
-
�'���
f
Mxanxyd..• i,uruf
O
-73
a � � �. �►- ,f �I ICS -
is �1 VMS.� �
�teli 9low� ai` �e�i�.a6t51�� ar r5 ��s i ��3�l�iimwool •
---------------
...a.eVxmmxw Kmu -
G41rn.t.r..ulw16
rJ lnnvu.nArA n0 I rv-�..
�.w I
wryWr {
AVl.w. wHnvdrnlrkroonw PI.IY _ r
�OW+saMaWolmll. n. rOl. w-
rauYiurawu h.x.[IrrS µ[K roWts 1 i' 1 1 1 1 1[ 1 1 I I, 1 I I' k I I k 11 E 1 €! [ I i 11 I I I A
sa.lslurasx.sh«nr uuranu I � � L �'alb-J•"ww•�.a••..•�f-{;;a<��a.,, .+••..,. I
n..,.wsa.r,...
6..Y.rr
1M.rlr•OM.uL
wMeJOMw
relwe.xa.*...
sx•.wnr
ro
Mk. bmiuwvTr..
1fYrxLpur
ti
W MVW0u1T..
LL"rxkOrr
]0
r.11wAw..nr..
Rr�l
d
M.0.0Aeyn.n T...
ww.rsla..sr_
Yic
u
glpny.w.�
T r
rwd�=b
L Tut
3
u•
1
Ilva. S.�.a.una:.
t0-11VV•Ya.
�.r Lr.Rr..nr .0
LYf r/lnn.
3
.�I.•ww...
W:.rcn.hrsan� nmm
ur
.n.�:MxrnMW.I.yx.+xr.
1
CODE COMPLIANCE I
HELLER F1i7:7&lalmfl "ww3nBNMm+sh MA7-7369
01., A J.:�1+1Ls,.L. ?h:6'tAT9.9T33
daW�.d. tl uj1m;*M
LA N OuCAP L' Ali Crr l'r L'CTII K l .rnw,rdmiQh0ipr,00m
-••-••—••—�—�— 10ukWVCv
— — Tasaaza
0 � tl d �rv1r MVM00M1
fi—ARA! L 1AN154;CAPE PIAN
'L
B B B O 6 O O B
® 'Y �, _ ■ii"i= ■,moi.'.. ■iii' ■i�.�
® ■ ■ ■ F�.- ®
on NMI ®ii ®iii 70
e ■ ■■ ■■ L"inm FAIR e ■ ■■a rfju ■■ ueiOrD
0
7 .. .. 71 ■■ ■■ ■■ .■
■I I■I til �i■I ® �■ u n ■■
e ■■I ■■I ■■I ;■1 .■ ■■ o
so
u ■■ ■■ .. e ° ! _ ®Iii •ii aii ,iii fi
°
on ME on ME so
ON .. a .IbV'I.I.N i::
IR Im ME momm :win
ME ME so
e
ONON
ON
■ .. ON on ON ME ME ME
..F .. ■■. ■■, e
■■1'i■■�li : ■1
° ■■1 ■''■1 ■■1 ■.1 ■ .■ u .. on
a■I :.I■I 1 e ■ u 7 .■
IIIIIIII■IIIIIIIIIIIII■IIS
■■ ■■ ■■ ■■ a ■■ ■■ .■■■ ■■ ■■
.■ ■■ ■. .. a °, ■ ■■ ■■
a -
ME ME m
•
■ u'�- .. _ 7 .- ®IIIIIIII�IIIIIIIIIIIIIIIIII
e o _
■ ■._ .. .. .. a e ^"'!■ ■. v. ..
O �I ■. ^.. .. .■
ME .■ ®. .■
■I■I ■I■1 ®I■I ■■1
®i,. ° ■�
19111-1111-11 1 ii
®® .e Illlllllllllllllllillllllll�
IIIIIIIIIIIIIIIIIIIIIIIIIII
IIIIII - IIIIIIII IIIIIIII IIII IIIIIIIIIIIII
o _
ON
ON
ME I i i Fill I I
ON
ON MOM
o
4—
q -
- — — — — - — — — —
1. MEW — — — — — —
U.
m
PROPOSED MORGAN DISTRICT DEVELOPMENT FOR: los=
THE MORGAN PARTNERS r)
421 OREGON STREET - OSHKOSH, WI 54902 j m
.........................
ell
111
q -
- — — — — - — — — —
1. MEW — — — — — —
U.
m
PROPOSED MORGAN DISTRICT DEVELOPMENT FOR: los=
THE MORGAN PARTNERS r)
421 OREGON STREET - OSHKOSH, WI 54902 j m
FAI
W <,
MORGAN 3
r �t
W <,
1 AF
KOK, ONTOT 0
I�qqj
SM
00
SII'/CUT' ALAN W STIEVO ANNETTE F MOORE
THE MORGAN DISTRICT 357 W 6TH AVE 426 W 5TH AVE
PC: 10-16-18 OSHKOSH WI 54902 OSHKOSH WI 54902
BERNARD J/KATHRYN S I-IAVLIK CAROLYN DILLY CITY OF OSHKOSH
2851 OAK RIDGE RD 410 W 5TH AVE PO BOX 1130
NEENAH WI 54956 OSHKOSH WI 54902 OSHKOSH WI 54903
DONALD J/LAURA M NORTHROP JAMES E TICS JASON M/ANGELLA M GELHAR
323 W 6TH AVE 327 W 6TI-I AVE. 437 W 4TH AVE
OSHKOSH WII 54902 OSHKOSH WI 54902 OSHKOSH WI 54902
JEFFREY SKOU JOEL R/MOLLY A NOVOTNY JULIANNE URBSCHAT
PO BOX 81 1731 DOTY ST 31.3 W 6TH AVE
MARQUETTE WI 53947 OSHKOSH WI 54902 OSHKOSH WI 54902
KARGUS PROPERTIES LLC KNOLL STANLEY R KOMOROWSKI PROPERTIES LLC
819 OREGON ST 1715 BERNHEIM ST 2522 FOND DU LAC RD
OSHKOSH WI 54.902 OSHKOSH WI 54904 OSHKOSH WI 54902
L12 PROPERTIES LLC LAYNE L RANGELOFF LEE XTONG
448 W 7TH AVE 449 W 4TH AVE 346 W 6TH AVE
OSHKOSI-I WI 54902 OSHKOSH WI 54902 OSHKOSH WI 54902
LTV LLC MARK J/JUDITH M KALBUS MARY EIDEN
601 OREGON ST A 335 BUSSE RD 1855 CLIFFVIEW CT
OSHKOSH WI 54902 COLOMA WI 54930 OSHKOSH WI 54901
MARY M SCHMIDT NHIA LONG LOR/CHIA LEE OREGON SUITE C LLC
438 W 5TH AVE 307 W 6TH AVE 601 OREGON ST C
OSHKOSH WI 54902 OSHKOSH WI 54902 OSHKOSH WI 54902
PAULETTE FELD/SARA L STICHERT PERPETUA H MOLASH R & C RENTALS LLC
416 W 5TH AVE 336 W 6TI-I AVE PO BOX 825
OSHKOSH WI 54902 OSHKOSH WI 54902 OSHKOSH WI 54903
RANGELOFF 922 OREGON STREET LLC RENEE G MOXON RICHARD G HUNT
3000 OREGON ST 351 W 6TH AVE 421 W STH AVE
OSHKOSH WI 54902 OSHKOSH WI 54902 OSHKOSH WI 54902
27 .
RICHARD/JERRI KATE STERLING ROBERT P/DIANE ZICK
443 W 4TH AVE 347 W 6TH AVE
OSHKOSH ESTI 54902 OSHKOSH WI 54902
SHARON A KRIZ
625 PHEN DR
REDGRANITE WI 54970
SHERRIANE AIROLA
322 W 6TH AVE
OSHKOSH WI 54902
RONALD D FRANKLIN SR
1079 DURFLE AVE
OSHKOSH Wi 54902
THOMAS P/MARY M HENDRICKS
PO BOX 2162
OSHKOSH WI 54903
TODD S PASCHKE
WILLIAMS FAMILY IRREV TRUST YESHUA D TATE
432 W 5TH AVE
1806 DOTY ST 403 W 6TH AVE
OSHKOSH WI 54902
OSHKOSH WI 54902 OSHKOSH WI 54902
457 4N 12TH AVE LLC
MORGAN DISTRICT LLC
1505 MARQUETTE AVE
601 OREGON ST B
OSHKOSH WI 54901
OSHKOSH WI 54902
City of Oshkosh maps and data are krterxfed to be used for general k[enfiicaW purposes only, and
bre Cr)r of Oshkosh assumes no Ltliity for the accuracy of the information. Those using the
ntomaton are responslNe for verifying accuracy. For fA disddmer please go to
+Ykaw d.oshkosh.W.ustoiSdie.P,Wmer
Nin=0.041
1 in = 200 ft
Panting Date: 5/3912018
Prepared by: City of Oshkosh, Wi
04%
it of;v
0s" Nosh
User: mina<
29
'fel= vimi(j.,v1 wurmc'f
o il`Lii of�jj.3fil �,a, iii=('o
City of Oshkosh maps and data are intended to be used for general identification purposes only, and
the City of Oshkosh assumes no liability for the accuracy of the information. Those using the
information are responsible for verifying accuracy. For full disclaimer please go to
www.ci.oshkosh.wi.us/GlSdisclaimer
N
1 in=0.03 mi
1in=180 ft
Printing Date: 5/31/2018
Prepared by: City of Oshkosh, WI
. A
VV
Oshkosh