Loading...
HomeMy WebLinkAbout08. 18-493 SEPTEMBER 25, 2018 18-493 RESOLUTION (CARRIED 6-0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE CHANGE ORDER NO. 1 FOR PUBLIC WORKS CONTRACT NO. 17-19 WITH VINTON CONSTRUCTION COMPANY, INC. FOR AVIATION BUSINESS PARK WATER MAIN LOOP (+$137,990.00) INITIATED BY: PUBLIC WORKS DEPARTMENT BE IT RESOLVED by the Common Council of the City of Oshkosh that the following change Order, a copy of which is attached, is hereby approved: VINTON CONSTRUCTION COMPANY, INC. 2705 N. Rapids Road Manitowoc, WI 54221-1987 Net Increase to Contract: $137,990.00 PURPOSE: install Ripple Avenue Pressure Regulating Valve (PRV) Station BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. Nos. 0541-1810-1799-00000 Water Utility- Construction in Progress 0317-0410-7480-03303 Special Assessments Fund —Water 0561-2010-1799-00000 Storm Utility— Construction in Progress City o� Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works Soy DATE: September 20, 2018 RE: Change Order No. 1 for Public Works Contract No. 17-19 Aviation Business Park Water Main Loop Vinton Construction Company, Inc. (+$137,990) BACKGROUND Change Order No. 1 for Contract 17-19 is scheduled for consideration by the Common Council at the September 25, 2018 meeting. Contract 17-19 installed water main to provide improved water service to the Aviation Business Park. Hydraulic modeling studies of the City's water distribution system recommended improvements to increase the pressure and fire flow available in the City's new Aviation Business Park (ABP). The final recommendation for this area included connecting the ABP to the City's high-pressure water zone. This connection will provide the ability for the City to effectively serve the ABP, improve water quality in the high-pressure zone, and allow the City to serve future development east of I-41 and west of the airport with a medium pressure zone. Part of the implementation of the new pressure zone is to install a new Pressure Regulating Valve (PRV). The Common Council approved the direct purchase of the PRV Station from Engineered Fluid, Inc. at their February 13, 2018 meeting. This change order is for the installation of the PRV. The installation of the PRV was not included in the original contract bid due to uncertainty in fabrication and the delivery timeline. This contract was originally awarded to Vinton Construction Company, Inc. in July of 2017. This change order would bring the total contract amount to $1,736,103.98. ANALYSIS Following is a summary of the significant changes to each section of the CIP: • Water Main - additional services required for the installation of the Ripple Avenue PRV Station. I:\Engineering\2017 CONTRACTS\17-19 Aviation Wtr Page 1 of 2 Mn \ Project_Information\ Correspondence \ Memo \ 17-19 Memo for CO #1_9-20-18.docx FISCAL IMPACT Contract Section Change Order Amount New Construction Costs with Engr CIP Budget Amount Sanitary Sewer $0.00 $126,496.00 $126,500.00 Water Main $137,990.00 $1,769,245.10 $1,800,500.00 Total $137,990.00 $1,895,741.10 $1,927,000.00 This work will be funded from the Water Main section of the 2017 Capital Improvement Program. Funding is available from the water main construction for the West Murdock Avenue Project, which came in under budget. RECOMMENDATIONS I recommend approval of Change Order No. 1 to Contact No. 17-19 in the amount of +$137,990 to Vinton Construction Company., Inc. Approved: Mark A. Rohloff City Manager SMG/tlt I:\Engineering\2017 CONTRACTS\17-19 Aviation Wtr Page 2 of 2 Mn\Project_Information\Correspondence\Memo\17-19 Memo for CO A1_9-20-18.docx TO: VINTON CONSTRUCTION COMPANY P.O. BOX 1987 MANITOWOC, WI 54221-1987 CHANGE ORDER #1 DATE: SEPTEMBER 12, 2018 Your present contract with the City of Oshkosh, Contract No. 17-19, awarded July 25, 2017, is hereby amended and changed as follows: NET INCREASE: $137,990.00 NET DECREASE: $0.00 NET INCREASE TO CONTRACT $437,990.00 TOTALS BID TOTAL $1,594,113.98 $1,5988-i3.3a CO #1 $137,990.00 $437,990.00 CONTRACT TOTAL $1,736,103.98 $4,736,103.98 CITY OF OSHKOSH BY: City Manager City Clerk Approved and accepted: �ra�ior I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form.- City orm: City Attorney CONTRACT 17.19 CHANGE ORDER #1 AVIATION BUSINESS PARK WATER MAIN LOOP ADDITIONAL WORK REQUIRED: CO 91 ITEM CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASE FN NUMBER DESCRIPTION UNIT QUANTITY QUANTMES INCREASE DECREASE PRICE CONTRACT PPJCE CONTRACT PRI Install the Ripple Avenue Pressure Regulating Valve (PRV) Station; complete as F01 specified Stations 0.00 1.00 1.00 $137,990.00 $137,990.00 NET INCREASE NET DECREASE NET INCREASE TO CONTRACT: Page 1 of 1 $137,990.00 $0.00 NET INCREASE: $137,990.00 $137,990.00 $0.00 $137,990.00 ;UNSTRUCTION COMPANY... Road Contractors An Equal Opportunity Employer P.O. Box 1987 2705 N. Rapids Road Manitowoc, Wisconsin 54221-1987 Office 920-682-0375 Fax 920-682-2838 Attn : Justin Gierach, P.E. 8/31/2018 City of Oshkosh - Engineering Division Re: Project 17-19 Aviation Business Park Water Main Loop RE: Field Order 1 Install the Ripple Ave Pressure Regulating Valve (PRV) Station Work to include as follows: Notice of Mobilization Coordinate Flushing of water main Coordinate delivery of owner purchased materials Off load materials Excavate, shoring, subbase and concrete foundation slab, Set PRV Station and anchor to slab. Furnish and Install Connections and valving to connect PRV Station to system, including disinfection Install sump pump discharge and exhaust system supply and piping external to Vault Coordinate electric Service with WPS( WPS fees paid by City) Provide and install electrical system per installation drawings Install Cathodic Protection System Provide and install telemetry antenna pole. Coordinate and assist Radio Communication Supplier. Barricading and protecting the site Restore work site as required Total $ 137,990.00 If a 3" OD pole is required for and Antenna at he Waukau Site ADD $6,752.00 If you have any questions please feel to call. Sincerely, Ronald J. Raboine Vinton Construction Co.