Loading...
HomeMy WebLinkAbout21. 18-486 SEPTEMBER 11, 2018 18-486 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN ) PURPOSE: AWARD BID FOR PUBLIC WORKS CONTRACT NO. 18-14 TO VINTON CONSTRUCTION COMPANY FOR OSHKOSH AVENUE AREA REDEVELOPMENT INFRASTRUCTURE IMPROVEMENTS ($3,126,518.07) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the City of Oshkosh has heretofore advertised for bids for Oshkosh Avenue Area Redevelopment Infrastructure Improvements; and WHEREAS,upon the opening and tabulation of bids, it appears that the following is the most advantageous bid: VINTON CONSTRUCTION COMPANY, INC. PO Box 1987 Manitowoc, WI 54221-1987 Total Bid + alt. 1:$3,126,518.07 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 0311-0410-7480-00000 Sidewalk Construction Fund 0317-0410-7480-03304 Special Assessment Fund-Sidewalks 0315-0410-7480-00000 Street Improvement Fund Expenditures 0317-0410-7480-03301 Special Assessments Fund-Streets 0541-1810-1799-00000 Water Utility-Construction in Progress 0317-0410-7480-03303 Special Assessments Fund-Water 0551-1910-1799-00000 Sewer Utility-Construction in Progress 0317-0410-7480-03302 Special Assessments Fund-Sewer 0561-2010-1799-00000 Storm Utility-Construction in Progress 0317-0410-7480-03305 Special Assessments Fund-Storm Water City o� Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the, Common Council FROM: Steven M. Gohde, Assistant Director of Public Works5eji DATE: September 6, 2018 RE: Award Bid for Public Works Contract No. 18-14 Oshkosh Avenue Area Redevelopment Infrastructure Improvements Vinton Construction Company / ($3,126,518.07) BACKGROUND The purpose of this project is to provide public infrastructure for the Oshkosh Corporation Global Headquarters and the surrounding developments. Public infrastructure consists of new streets, storm water management, sanitary sewer, and water mains for North Westfield Street and North Koeller Street extensions, as well as widening Oshkosh Avenue to create a left -turn lane and replacing the signals at the intersection of Oshkosh Avenue and North Westfield Street to account for the new intersection leg to the north. Additionally, the project will build the storm water quality management basin to serve the Oshkosh Corporation Global Headquarters. ANTICIPATED CONSTRUCTION SEQUENCE At this time, we do not have a proposed schedule from the Contractor. The Specifications for the project require the improvements to Oshkosh Avenue and North Westfield Street be sufficiently completed by November 30, 2018, so they are fully open to traffic. The intersection of Oshkosh Avenue and North Westfield Street will operate with temporary signals until the permanent equipment arrives in the spring of 2019. Oshkosh Avenue and North Westfield Street are to remain open during the construction, although lanes will be closed. The work to construct North Koeller Street and install water main along Rath Lane has a twelve (12) week time limit and must be completed by July 12, 2019. It's anticipated the Contractor may perform some of this work over the winter, pending weather conditions. The remainder of the work, including the construction of the storm water management basin for Oshkosh Corporation and drainage improvements through Lakeshore Park, must be completed by July 12, 2019. The North Koeller Street work must be coordinated with Miron Construction Company, the General Contractor for the Oshkosh Corporation site, to maintain access to the site. L\ Engineering\ 2018 CONTRACTS\18-14 Oshkosh Ave Page 1 Of 2 Area \ Project_Information \ Correspondence \ Memo \ 18-14 Memo for Bid Award_9.6-18.docu ANALYSIS Engineering staff reviewed four (4) bids. The low bid was received from Vinton Construction Company of Manitowoc, Wisconsin. The base bid amount is $3,073,129.32. There were two (2) alternates included in the bid. Engineering Division staff are recommending the award of Alternate No. 1 for the Contractor to use excess clay currently being stored at the Southwest Industrial Park. Alternate No. 1 is recommended to be awarded with the base bid, resulting in a contract award in the amount of $3,126,518.07. FISCAL IMPACT Funding for the project is in the 2018 Capital Improvement Program (CIP). Following is a summary of the available funds and the estimated total construction cost, including ancillary costs such as engineering fees, landfill tipping fees, construction materials testing fees, and other construction related expenses. The methodology for assessing abutting property owners is being reviewed as the City's assessment policy does not address new construction. The CIP budgets shown below include other projects that are not included with this contract. These projects include the construction of the Riverwalk and land acquisition and modifications to the North Koeller Street and Oshkosh Avenue roundabout. CIP Section CIP Funds Budgeted Estimated Total Construction Costs Street $2,034,424 $791,695 Storm Sewer $1,249,000 $1,199,198 Sanitary Sewer $228,600 $89,158 Water Main $881,000 $441,917 Sidewalk $132,020 $118,480 Traffic $949,256 $409,280 Property Improvements $1,101,400 $206,002 Oshkosh Corporation/ Revolving Loan Fund $650,000 $614,767 Totals $7,225,700 $3,870,496 RECOMMENDATIONS I recommend award to the low bidder, Vinton Construction Company in the amount of $3,126,518.07. Approved: Mark A. Rohloff City Manager SMG/tlt 1: \ Engineering \ 2018 CONTRACTS\I8-14 Oshkosh Ave Page Z Of 2 Area\ Project_Information \ Correspondence \ Memo \18-14 Memo for Bid Award_9-6-18.docx Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements (1!5894635) Owner: City of Oshkosh, WI Solicitor. City of Oshkosh, WI Bid Opening: 08/31/2018 10:00 AM CDT Vinton Construction Company Dorner Inc. PO Box 1987 Manitowoc, WI 54221 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Section 1: Base Bid $3,073,129.32 $3,134,307.25 Clearing; complete as 1010 specified Stations 4.30 $985.00 $4,235.50 $1,005.00 $4,321.50 Clearing; complete as 1011 specified Inch Diameter 315.00 $16.65 $5,244.75 $16.98 $5,348.70 Grubbing; complete as 1020 specified Stations 4.30 $330.00 $1,419.00 $337.00 $1,449.10 Grubbing; complete as 1021 specified Inch Diameter 315.00 $5.55 $1,748.25 $5.66 $1,782.90 Removing pavement; 1100 complete as specified Square Yards 950.00 $1.00 $950.00 $6.12 $5,814.00 Removing curb and gutter; complete as 1110 specified Linear Feet 1,065.00 $2.25 $2,396.25 $3.06 $3,258.90 Removing concrete an asphalt sidewalk and driveway; complete as 1120 specified Square Feet 11,250.00 $0.45 $5,062.50 $0.77 $8,662.50 Unclassified excavation; 1200 complete as specified Cubic Yards 3,350.00 $11.58 $38,793.00 $15.30 $51,255.00 Strip and stoc p' e topsoil for North Koeller Street; complete 1202A as specified Lump Sum 1.00 $5,000.00 $5,000.00 $12,240.00 $12,240.00 Strip an stoc p' e topsoil for North Westfield Street; 1202B complete as specified Lump Sum 1.00 $3,000.00 $3,000.00 $6,120.00 $6,120.00 8" concrete pavement doweled; with 6" CABC and grading; complete 1314A as specified Square Yards 5,825.00 $55.91 $325,675.75 $62.64 $364,878.00 8" concrete pavement doweled; HES; with 6" CABC and grading; 1315 1 complete as specified I Square Yards 755.001 $58.91 1 $44,477.05 $65.70 $49,603.50 L\ Ery{inmmk\}018 fONTRARS\ 1SId Oehko.b Ave Page 1 of 40 8/31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements (15894635) Owner. City of Oshkosh, WI Solicitor: City of Oshkosh, WI Bid Opening: 08/31/201810:00 AM CDT Vinton Construction Company Domer Inc. PO Box 1987 Manitowoc, WI 54221 Section Title Item Code Item Description U01M Quantity Unit Price Extension Unit Price Extension 9" concrete pavement HES; with 6 CABC and grading; complete as 1323 specified Square Yards 1,465.00 $65.35 $95,737.75 $72.27 $105,875.55 Concrete pavement gaps; complete as 1334 specified Each 1.00 $1,000.00 $1,000.00 $1,020.00 $1,020.00 Crushed aggregate base course; complete as 1340 specified Tons 1,325.00 $13.25 $17,556.25 $12.75 $16,893.75 Pavement ties; complete 1350 as specified Each 455.00 $8.00 $3,640.00 $8.16 $3,712.80 Drilled dowel bars; 1 1/4"; complete as 1354 specified Each 65.00 $14.00 $910.00 $14.28 $928.20 Adjust manholes and inlets; complete as 1360 specified Each 31.00 $350.00 $10,850.00 $357.00 $11,067.00 Turf restoration on North Koeller Street; 1370A complete as specified Square Yards 4,103.20 $7.65 $31,389.48 $9.50 $38,980.40 Turf restoration on Oshkosh Avenue; 1370B complete as specified Square Yards 2,882.10 $7.65 $22,048.07 $9.50 $27,379.95 Turf restoration on North Westfield Street; 1370C complete as specified Square Yards 1,911.80 $7.65 $14,625.27 $9.50 $18,162.10 Turf restoration on Rath Lane; complete as 1370D specified Square Yards 903.00 $7.65 $6,907.95 $9.50 $8,578.50 Cold weat er covering (concrete pavement) - single visquine; 1380 complete as specified Square Yards 750.00 $0.01 $7.50 $1.53 $1,147.50 Cold weather covering (concrete pavement) - double visquine; 1382 1 complete as specified I Square Yards 750.00 $0.01 $7.50 $2.55 $1,912.50 IA 8^8-^8\T0IS CONTRACTS\ -4 O hk- A.e Awl PrgenJNwmatlon\C.anlrM INo\ 18-14 BW Lb &31-18 Page 2 of 40 8/31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements (tt5894635) Owner. City of Oshkosh, WI Solicitor. City of Oshkosh, WI Bid Opening: 08/31/2018 10:00 AM CDT Vinton Construction Company Dorner Inc. PO Box 1987 Manitowoc, WI 54221 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Cold weather covering (concrete pavement) - double visquine with 6" hay; complete as 1384 specified Square Yards 750.00 $0.01 $7.50 $10.20 $7,650.00 Up-charge for late season cold weather concrete pavement; 1390 complete as specified Cubic Yards 380.00 $7.00 $2,660.00 $7.14 $2,713.20 12" radius curb with 6" CABC and grading; 1410 complete as specified Linear Feet 175.00 $10.00 $1,750.00 $12.24 $2,142.00 4" concrete sidewalk with 3" CABG and grading; complete as 1500 specified Square Feet 19,200.00 $4.95 $95,040.00 $5.81 $111,552.00 6" oncrete sidewalk/ driveway/ramp with 3" CABC and grading; 1510 complete as specified Square Feet 1,235.00 $5.65 $6,977.75 $6.53 $8,064.55 8" concrete si ewa driveway/ramp with 3" CABC and grading; 1520 complete as specified Square Feet 5,500.00 $6.25 $34,375.00 $7.14 $39,270.00 Curb ramp detecta e warning field (natural/non-painted); 1540 complete as specified Square Feet 80.00 $35.00 $2,800.00 $36.00 $2,880.00 No. 4 rein orcing rods - deformed; epoxy- coated; complete as 1550 specified Linear Feet 360.00 $2.00 $720.00 $2.04 $734.40 title No. 4 si ewa tie bars - deformed; epoxy-coated; complete 1560 as specified Each 16.001 $7.00 $112.00 $7.14 $114.24 L\E^N^xn^R\MIB COMRARB\I6 --h- Ati Rin 1--l—W-1 Info\I6N BWLb631-IA Page 3 of 40 8/31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements (#5894635) Owner. City of Oshkosh, WI Solicitor. City of Oshkosh, WI Bid Opening: 08/31/2018 10:00 AM CDT Vinton Construction Company Domer Inc. PO Box 1987 Manitowoc, WI 54221 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Co d weather covering (sidewalk) - single visquine; complete as 1580 specified Square Feet 3,750.00 $0.20 $750.00 $0.20 $750.00 Cold weather covering (sidewalk) - double visquine; complete as 1582 specified Square Feet 3,750.00 $0.30 $1,125.00 $0.31 $1,162.50 Co weather covering (sidewalk) - double visquine with 6" hay; 1584 complete as specified Square Feet 3,750.00 $1.00 $3,750.00 $1.02 $3,825.00 Up-charge for ate season cold weather concrete pavement; 1590 complete as specified Cubic Yards 105.00 $10.00 $1,050.00 $1020 $1,071.00 Locate existing property monuments; complete 1650 as specified Each 25.00 $42.00 $1,050.00 $128.00 $3,200.00 Replace existing property monuments; 1652 complete as specified Each 10.00 $45.00 $450.00 $51.00 $510.00 Sawing existing pavement; complete as 1700 specified Linear Feet 200.00 $3.00 $600.00 $2.30 $460.00 Sawing concrete pavement full depth; 1710 complete as specified Linear Feet 1,225.00 $3.50 $4,287.50 $2.30 $2,817.50 4" asp a tic surface LT with 6" CABC and grading; complete as 1916 specified Square Yards 215.00 $48.25 $10,373.75 $57.17 $12,291.55 Pavement markings, epoxy; 8" (white); 1974 complete as specified Linear Feet 4,145.00 $0.95 $3,937.75 $1.00 $4,145.00 Pavement markings; epoxy; 4" (white); 1975 1 complete as specified I Linear Feet 1 190.00 $7.50 $1,425.00 $8.00 $1,520.00 N Enpnaerine\LIIB('ONTAw('I5�IB-i4 (hh4oxh eve wa.\Pgen IdomuGon\Contra,-\i -\-4 Bid T.b tl-Lde Page of 40 8/31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements (45894635) Owner: City of Oshkosh, WI Solicitor. City of Oshkosh, WI Bid Opening: 08/31/201810:00 AM CDT Vinton Construction Company Domer Inc. PO Box 1987 Manitowoc, WI 54221 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Pavement markings; epoxy; 4" (yellow); 1976 complete as specified Linear Feet 5,800.00 $0.55 $3,190.00 $1.00 $5,800.00 Pavement mar Ings; cross -walk epoxy; 12" (white); complete as 1977 specified Linear Feet 485.00 $9.50 $4,607.50 $10.00 $4,850.00 Pavement markings; stop -line epoxy; 18" (white); complete as 1978 specified Linear Feet 140.00 $10.75 $1,505.00 $11.00 $1,540.00 Pavement mar ings; arrow epoxy; Type 1 (white); complete as 1979 specified Each 2.00 $210.00 $420.00 $214.00 $428.00 Pavement markings; arrow epoxy; Type 2 (white); complete as 1980 specified Each 7.00 $275.00 $1,925.00 $281.00 $1,967.00 Pavement mar ings; arrow epoxy; Type 3 (white); complete as 1981 specified Each 4.00 $350.00 $1,400.00 $357.00 $1,428.00 Pavement markings; epoxy; 12" (yellow) diagonal; complete as 1982 specified Linear Feet 125.00 $9.50 $1,187.50 $10.00 $1,250.00 Furnish and install 6" storm sewer; complete 2000 as specified Linear Feet 160.00 $40.00 $6,400.00 $54.00 $8,640.00 Furnish and install 8" storm sewer; complete 2001 as specified Linear Feet 10.00 $47.85 $478.50 $40.00 $400.00 Furnish and install 10" storm sewer; complete 2002 as specified Linear Feet 20.00 $58.20 $1,164.00 $45.00 $900.00 Furnish and install 12" storm sewer; complete 2003 1 as specified I Linear Feet 1 610.001 $48.25 $29,432.50 1 $39.00 $23,790.00 1AveA 111.j-_Inf-4un\Con ..N.XI&It GIST tl-JI-18 Page 5 o 40 8/31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements (#5894635) Owner: City of Oshkosh, WI Solicitor. City of Oshkosh, WI Bid Opening: 08/31/2018 10:00 AM CDT Vinton Construction Company Domer Inc. PO Box 1987 Manitowoc, WI 54221 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Furnish and install 12" RCP Class III storm sewer; complete as 2004 specified Linear Feet 50.00 $68.48 $3,424.00 $41.00 $2,050.00 Furnish and install 15" storm sewer; complete 2006 as specified Linear Feet 345.00 $59.63 $20,572.35 $44.00 $15,180.00 Furnish and install 15" RCP Class III storm sewer, complete as 2007 specified Linear Feet 35.00 $71.02 $2,485.70 $43.00 $1,505.00 Furnish and install 18" storm sewer; complete 2009 as specified Linear Feet 675.00 $60.73 $40,992.75 $55.00 $37,125.00 Furnish and install 18" RCP Class III storm sewer; complete as 2010 specified Linear Feet 80.00 $71.03 $5,682.40 $48.00 $3,840.00 Furnish and install 24" storm sewer; complete 2015 as specified Linear Feet 230.00 $71.80 $16,514.00 $80.00 $18,400.00 Furnish and install 24" RCP Class III storm sewer; complete as 2016 specified Linear Feet 95.00 $80.24 $7,622.80 $53.00 $5,035.00 Furnish and install 30" storm sewer; complete 2021 as specified Linear Feet 2,670.00 $86.25 $230,287.50 $73.00 $194,910.00 Furnish and install 48" storm sewer; complete 2030 as specified Linear Feet 1,175.00 $128.41 $150,881.75 $110.00 $129,250.00 Furnish and instal] 19" x 30" HERCP Class III storm sewer; complete 2047 as specified Linear Feet 30.00 $113.34 $3,400.20 $65.00 $1,950.00 Furnish and install 24" x 38" HERCP Class III storm sewer; complete 2049 1 as specified I Linear Feet 1 220.001 $131.49 1 $28,927.80 1 $94.00 $20,680.00 L\ Fnpneering\2111tl CONIAACIS\ 16p Ckhko.h --- I 'Ili --1—.—W.— —I ILLb Bid — —1L Page 6 of 40 8/31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements (115894635) Owner. City of Oshkosh, WI Solicitor. City of Oshkosh, WI Bid Opening: 08/31/2018 10:00 AM CDT Vinton Construction Company Domer Inc. PO Box 1987 Manitowoc, WI 54221 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Furnish and install 6" storm sewer valve; 2199 complete as specified Each 1.00 $1,112.00 $1,112.00 $1,007.00 $1,007.00 Furnish and install standard storm sewer manhole (4' diameter); 2201 complete as specified Vertical Feet 35.10 $480.00 $16,848.00 $333.00 $11,688.30 Furnish and install standard storm sewer manhole (5' diameter); 2202 complete as specified Vertical Feet 73.75 $655.00 $48,306.25 $344.00 $25,370.00 F. is an install standard storm sewer manhole (7' diameter); 2204 complete as specified Vertical Feet 26.90 $1,030.00 $27,707.00 $825.00 $22,192.50 Furnish and insta standard storm sewer manhole (4'x 4' box); 2207 complete as specified Vertical Feet 3.25 $720.00 $2,340.00 $918.00 $2,983.50 Furnish and install standard storm sewer manhole (6'x 6' box); 2209 complete as specified Vertical Feet 8.15 $985.00 $8,027.75 $850.00 $6,927.50 Furnish and insta standard storm sewer manhole (7'x 7box); 2210 complete as specified Vertical Feet 9.10 $1,086.00 $9,882.60 $1,304.00 $11,866.40 Furnish and install standard storm sewer inlet manhole (4' diameter); complete as 2213 specified Vertical Feet 5.70 $669.00 $3,813.30 $481.00 $2,741.70 Furnish and nista standard storm sewer inlet manhole (5' diameter); complete as 2214 specified Vertical Feet 24.55 $595.00 $14,607.25 $542.00 $13,306.10 I Pn91--pN-8 C—M\ 1614 Osh4..rh Wu\ 1-4 - Lb 6ID-\8 Page 7 of 40 8/31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements (115894635) Owner. City of Oshkosh, WI Solicitor: City of Oshkosh, WI Bid Opening: 08/31/2018 10:00 AM CDT Vinton Construction Company Dorner Inc. PO Box 1987 Manitowoc, WI 54221 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Furnish and install standard storm sewer inlet manhole (4'x 4' box); complete as 2219 specified Vertical Feet 14.70 $850.00 $12,495.00 $996.00 $14,641.20 Furnish and install storm sewer junction chamber; complete as 2225 specified Each 1.00 $93,642.00 $93,642.00 $110,000.00 $110,000.00 Furnish and install Type 1 inlet; complete 2236 as specified Each 5.00 $1,874.00 $9,370.00 $1,755.00 $8,775.00 Furnish and install Type 3 inlet (with 18" sump); complete as 2237 specified Each 13.00 $2,268.00 $29,484.00 $1,746.00 $22,698.00 Furnish and install storm sewer marker balls; complete as 2404 specified Each 5.00 $35.00 $175.00 $50.00 $250.00 Furnish and install storm sewer clay dams; 2406 complete as specified Each 5.00 $450.00 $2,250.00 $150.00 $750.00 Furnish; install; maintain; and remove Type D modified inlet protection; complete as 2508 specified Each 54.00 $75.00 $4,050.00 $168.00 $9,072.00 Sediment removal - Type D modified inlet protection; complete as 2510 specified Each 54.00 $5.00 $270.00 $31.00 $1,674.00 Furnish; install; maintain; and remove stone tracking pad; 2512 complete as specified Each 2.00. $1.00 $2.00 $1,530.00 $3,060.00 I.—prse-91MIS CONiAA(-f5\I&1<Oshk�h Ave Arcs\Pr�jed_INmmaYan\Contr�ai 1.1.\I -1!B Lb--iS Page8 of40 8/31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements (#5894635) Owner: City of Oshkosh, WI Solicitor: City of Oshkosh, WI Bid Opening: 08/31/201810:00 AM CDT Vinton Construction Company Darner Inc. PO Box 1987 Manitowoc, WI 54221 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Furnish; install' maintain, and remove silt fence; complete as 2514 specified Linear Feet 5,250.00 $2.25 $11,812.50 $2.50 $13,125.00 Furnish; install; maintain; and remove stone bag; complete as 2516 specified Each 75.00 $8.00 $600.00 $20.40 $1,530.00 Furnish; install; maintain; and remove 12" diameter sediment logs, complete as 2518 specified Linear Feet 825.00 $9.00 $7,425.00 $6.63 $5,469.75 Furnish; inst, maintain; and remove ditch check; complete as 2522 specified Each 27.00 $75.00 $2,025.00 $153.00 $4,131.00 umis ; —install; maintain; and remove dewatering tank system; complete as 2524 specified Each 2.00 $5,100.00 $10,200.00 $5,000.00 $10,000.00 Furnish; install,- nsta ;maintain; maintain,and remove turbidity barrier; 2526 complete as specified Each 2.00 $3,200.00 $6,400.00 $5,000.00 $10,000.00 Fumish and install salvaged topsoil; 2601 complete as specified Lump Sum 1.00 $39,800.00 $39,800.00 $51,000.00 $51,000.00 Install salvaged topsoil 12" depth; complete as 2606 specified Square Yards 1,105.00 $4.47 $4,939.35 $2.55 $2,817.75 Furnish and install aquatic protective fencing; complete as 2609 specified Linear Feet 1,930.00 $3.75 $7,237.50 $3.88 $7,488.40 Furnish and install perennial rye grass, 2619 complete as specified Square Yards 4,020.00 $0.50 $2,010.00 $1.02 $4,100.40 I Page 9 of 40 8/31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements (#5894635) Owner. City of Oshkosh, WI Solicitor. City of Oshkosh, WI Bid Opening: 08/31/201810:00 AM CDT Vinton Construction Company Domer Inc. PO Box 1987 Manitowoc, WI 54221 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Furnish and install turf grass; complete as 2621 specified Lump Sum 1.00 $33,600.00 $33,600.00 $31,243.00 $31,243.00 Furnish and install annual cover crop; 2625 complete as specified Lump Sum 1.00 $8,800.00 $8,800.00 $11,036.00 $11,036.00 Furnish and install Class I; Urban; Type A erosion control mat; 2633 complete as specified Lump Sum 1.00 $13,500.00 $13,500.00 $11,888.00 $11,888.00 Furnish and install reinforced grass pavement system; 2640 complete as specified Square Yards 430.00 $63.00 $27,090.00 $148,00 $63,640.00 Furnish aninsta hydraulically -applied erosion control product; 2645 complete as specified Lump Sum 1.00 $38,500.00 $38,500.00 $29,660.00 $29,660.00 Fur,usF—an--a install medium rip -rap with filter fabric; complete as 2648 specified Square Yards 190.00 $49.00 $9,310.00 $50.00 $9,500.00 Furnish and install heavy rip -rap with filter fabric; complete as 2650 specified Square Yards 185.00 $49.00 $9,065.00 $65.00 $12,025.00 Furrus,E—a—nU install prairie treatment system; complete as 2660 specified Lump Sum 1.00 $116,080.00 $116,080.00 $150,000.00 $150,000.00 Rock excavation; 2750 complete as specified Cubic Yards 10.00 $100.00 $1,000.00 $250.00 $2,500.00 Abandon 8" - 12" storm sewer; complete as 2800 specified Linear Feet 450.00 $3.00 $1,350.00 $6.57 $2,956.50 Abandon 15' and larger storm sewer; complete 2802 1 as specified I Linear Feet 1 1,580.001 $15.50 1 $24,490.00 1 $20.92 1 $33,053.60 I E­—g\20IS CONTRAC \19.140 Uh hA.e Ara\Prgeri Informeion\Cnmon ].(.\ 1S,14 BWTA--19 Page 10 of 41) 8/312018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements (#5894635) Owner. City of Oshkosh, WI Solicitor: City of Oshkosh, WI Bid Opening: 08/31/201810:00 AM CDT Vinton Construction Company Dorner Inc. PO Box 1987 Manitowoc, WI 54221 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Remove 30" and smaller storm sewer; complete 2804 as specified Linear Feet 120.00 $25.00 $3,000.00 $13.25 $1,590.00 Abandon storm sewer manholes and inlets; 2810 complete as specified Each 2.00 $740.00 $1,480.00 $227.00 $454.00 Remove storm sewer manholes and inlets; 2812 complete as specified Each 6.00 $740.00 $4,440.00 $227.00 $1,362.00 Connect to existing storm sewer main; 2850 complete as specified Each 8.00 $600.00 $4,800.00 $874.00 $6,992.00 Connect to existing storm sewer manhole; 2856 complete as specified Each 4.00 $1,500.00 $6,000.00 $5,000.00 $20,000.00 Connect to existing storm sewer inlet; 2858 complete as specified Each 2.00 $400.00 $800.00 $908.00 $1,816.00 Strip and stockpile topsoil; complete as 2903 specified Lump Sum 1.00 $28,000.00 $28,000.00 $51,000.00 $51,000.00 Clear trees; complete as 2906 specified Lump Sum 1.00 $2,000.00 $2,000.00 $2,040.00 $2,040.00 Grub stumps; complete 2912 as specified Lump Sum 1.00 $2,000.00 $2,000.00 $2,040.00 $2,040.00 Storm sewer utility line opening (ULO); 2914 complete as specified Each 2.00 $700.00 $1,400.00 $454.00 $908.00 General excavation; 2930 complete as specified Lump Sum 1.00 $260,000.00 $260,000.00 $127,500.00 $127,500.00 Excavation below subgrade - detention basin, complete as 2931 1specified I Cubic Yards 2,000.001$11.00 1 $22,000.00 1 $5.10 1 $10,200.00 Construct clay liner, 2934 complete as specified Lump Sum 1 1.00 $24,000.00 $24,000.00 1 $76,500.00 1 $76,500.00 I.\Enp,n.ennR\1018 CONiAA�\ I61<(kNa.A Ave Arc.\Pmjen Infarm,Iion\CantrM Inla\ 1611 BW Tab 5J1-18 Page 11 of 40 8/312018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements (#5894635) Owner: City of Oshkosh, WI Solicitor: City of Oshkosh, WI Bid Opening: 08/31/201810:00 AM CDT Vinton Construction Company Dorner Inc. PO Box 1987 Manitowoc, WI 54221 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension umis ; insta ; maintain; and remove chain link safety fencing; complete as 2946 specified Linear Feet 1,150.00 $6.00 $6,900.00 $6.12 $7,038.00 Furnish and install 30" backflow preventer; 2972 complete as specified Each 1.00 $10,858.00 $10,858.00 $15,000.00 $15,000.00 Furnish and install 8" sanitary sewer (new); 3030 complete as specified Linear Feet 100.001 $77.00 $7,700.00 $89.00 $8,900.00 Furnish and install 10" sanitary sewer (new); 3032 complete as specified Linear Feet 120.00 $79.00 $9,480.00 $95.00 $11,400.00 Funush and install 15" sanitary sewer (new); 3036 complete as specified Linear Feet 380.00 $90.00 $34,200.00 $134.00 $50,920.00 Furnish aninsta standard sanitary sewer manhole (4' diameter); 3100 complete as specified Vertical Feet 16.00 $460.00 $7,360.00 $349.00 $5,584.00 Furnish and install external sanitary sewer manhole chimney seal; 3114 complete as specified Each 2.00 $540.00 $1,080.00 $446.00 $892.00 Furnish and install external sanitary sewer manhole chimney seal extension; complete as 3116 specified Each 2.00 $350.00 $700.00 $301.00 $602.00 Furnish an insta internal sanitary sewer manhole chimney seal; 3118 complete as specified Each 1.00 $480.00 $480.00 $390.00 $390.00 urnis an insta internal sanitary sewer manhole chimney seal extension; complete as 3120 specified Each 1.00 $320.00 $320.00 $277.00 $277.00 1:1 Egli -e 11014 -k 1.1d Bid-&)LIR Page 12 of 40 8/31/1018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements (95894635) Owner: City of Oshkosh, WI Solicitor: City of Oshkosh, WI Bid Opening: 08/31/201810:00 AM CDT Vinton Construction Company Darner Inc. PO Box 1987 Manitowoc, WI 54221 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Fumis an nista 6- sanitary sewer "Insert -A Tee" or " Kor-N-Tee"; 3222 complete as specified Each 1.00 $475.00 $475.00 $229.00 $229.00 Fumis an insta 6- sanitary sewer laterals (new); complete as 3232 specified Linear Feet 45.00 $88.80 $3,996.00 $115.00 $5,175.00 Furnish and instal sanitary sewer lateral marker balls; complete 3236 as specified Each 2.00 $35.00 $70.00 $50.00 $100.00 Furnish and install clay dams; complete as 3238 specified Each 1.00 $450.00 $450.00 $500.00 $500.00 Fumis an insta connection to existing 8" sanitary sewer mains; 3300 complete as specified Each 1.00 $540.00 $540.00 $697.00 $697.00 Furnish and install connection to existing 15" sanitary sewer mains; complete as 3306 specified Each 1.00 $747.00 $747.00 $1,866.00 $1,866.00 Furnis aninsta 18" sanitary sewer open cut casing pipes; complete 3410 as specified Linear Feet 10.00 $175.00 $1,750.00 $109.00 $1,090.00 Rock excavation; 3600 complete as specified Cubic Yards 25.00 $100.00 $2,500.00 $0.01 $0.25 Closed circuit televising; complete as 3700 specified Linear Feet 600.00 $4.00 $2,400.00 $2.00 $1,200.00 Furnish and insta new 6" ductile iron water main with polywrap; 4020 lcomplete as specified I Linear Feet 160,001 $142.00 $22,720.00 $90.00 $14,400.00 I'\En ....A% Wld CONTRACTS\18-14 -1h Ave Area Ino.\ -4 Bid Lb 631-18 Page 13 of 40 8/31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements 05894635) Owner: City of Oshkosh, WI Solicitor. City of Oshkosh, WI Bid Opening: 08/31/201810:00 AM CDT Vinton Construction Company Dorner Inc. PO Box 1987 Manitowoc, WI 54221 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Furnish and install new 10" ductile iron water main with polywrap; 4024 complete as specified Linear Feet 95.00 $165.00 $15,675.00 $111.00 $10,545.00 Furnish and install new 12" ductile iron water main with polywrap; 4026 complete as specified Linear Feet 2,095.00 $114.40 $239,668.00 $100.00 $209,500.00 Furnish and install 2" water service (new); 4046 complete as specified Linear Feet 45.00 $79.40 $3,573.00 $81.00 $3,645.00 Furnish and install Y' corporation and stop box; complete as 4053 specified Each 1.00 $855.00 $855.00 $922.00 $922.00 Furnish and install water service clay dams; complete as 4055 specified Each 2.00 $450.00 $900.00 $350.00 $700.00 Furnish and install connections to existing 10" water main; 4062 complete as specified Each 1.00 $904.00 $904.00 $1,777.00 $1,777.00 Furnish and install connections to existing 12" water main; 4064 complete as specified Each 2.00 $1,415.00 $2,830.00 $2,384.00 $4,768.00 Furnish and install 12" x 6 water main tee; 4128 complete as specified Each 8.00 $770.00 $6,160.00 $992.00 $7,936.00 Furnish and install 12" x 10" water main tee; 4130 complete as specified Each 1.00 $960.00 $960.00 $1,204.00 $1,204.00 Furnish and install 12" 11-1/4 degree water main bend; complete as 4221 specified Each 2.00 $570.00 $1,140.00 $735.00 $1,470.00 -­-gMIS COMeA--4 Oshkosh Ave Ami t 10 1In(oemnion\--,-d li 4Page 14 of 40 8/31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements (#5894635) Owner: City of Oshkosh, WI Solicitor: City of Oshkosh, WI Bid Opening: 08/31/201810:00 AM CDT Vinton Construction Company Donner Inc. PO Box 1987 Manitowoc, WI 54221 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Furnish and instal 12" 22-1/2 degree water main bend; complete as 4230 specified Each 6.00 $590.00 $3,540.00 $753.00 $4,518.00 Furnish and install -6'45 degree water main bend; complete as 4236 specified Each 14.00 $210.00 $2,940.00 $315.00 $4,410.00 Furnish an insta 10' 45 degree water main bend; complete as 4238 specified Each 4.00 $410.00 $1,640.00 $560.00 $2,240.00 Fumis an insta 12" 45 degree water main bend; complete as 4239 specified Each 2.00 $650.00 $1,300.00 $816.00 $1,632.00 Furnish and install 6" water main cap; 4254 complete as specified Each 1.00 $100.00 $100.00 $209.00 $209.00 Furnish and install 6" water main gate valve; 4401 complete as specified Each 8.00 $1,333.00 $10,664.00 $1,257.00 $10,056.00 Furnish and install 10" water main gate valve; 4403 complete as specified Each 1.00 $2,514.00 $2,514.00 $2,315.00 $2,315.00 Furnish and install 12" water main gate valve; 4404 complete as specified Each 7.00 $3,057.00 $21,399.00 $2,756.00 $19,292.00 Furnish and install 12" x 12" tapping valve and sleeve; complete as 4449 specified Each 1.00 $5,340.00 $5,340.00 $7,081.00 $7,081.00 Furnish and install hydrant; complete as 4500 specified Each 6.00 $4,231.00 $25,386.00 $3,943.00 $23,658.00 Furnish and install 20" water main casing pipe; 4728 1 complete as specified I Linear Feet 1 12.001 $200.00 1 $2,400.00 $99.00 $1,188.00 1 i 14- A.e Ares\PwjeN Infomunon\ConVan In/o\1614Bid Lb&JI-IB Page 15 of 40 8/31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements (115894635) Owner: City of Oshkosh, WI Solicitor. City of Oshkosh, WI Bid Opening: 08/31/201810:00 AM CDT Vinton Construction Company Donner Inc. PO Box 1987 Manitowoc, WI 54221 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Rock excavation; 4800 complete as specified Cubic Yards 25.00 $100.00 $2,500.00 $0.01 $0.25 Furrish and install pull box - non-conductive, 24" x 42'; complete as 5019 specified Each 17.00 $1,250.00 $21,250.00 $1,275.00 $21,675.00 Adjust pull box; 5025 complete as specified Each 17.00 $125.00 $2,125.00 $128.00 $2,176.00 Remove pull box; 5026 complete as specified Each 3.00 $100.00 $300.00 $102.00 $306.00 Remove concrete base; 5027 complete as specified Each 6.00 $100.00 $600.00 $102.00 $612.00 Furnish and install 3" Schedule 40 PVC; 5130 complete as specified Linear Feet 3,000.00 $7.00 $21,000.00 $7.14 $21,420.00 Furnish and install 3" Schedule 80 PVC; 5132 complete as specified Linear Feet 160.00 $8.00 $1,280.00 $8.16 $1,305.60 Furnish and insta Schedule 80 PVC conduit; trenchless installation, complete as 5134 specified Linear Feet 250.00 $20.00 $5,000.00 $20.40 $5,100.00 Connect to existing pull box; complete as 5180 specified Each 14.00 $125.00 $1,750.00 $128.00 $1,792.00 Connect to existing conduit; complete as 5184 specified Each 3.00 $125.00 $375.00 $128.00 $384.00 Furnish and install 4 gauge red -coated wire; 5230 complete as specified Linear Feet 3,905.00 $1.20 $4,686.00 $1.22 $4,764.10 Furnish and install 4 gauge black -coated wire; complete as 5231 specified Linear Feet 3,905.00 $1.20 $4,686.00 $1.22 $4,764.10 Furnish and install 10 gauge red -coated wire; 5260 1complete as specified I Linear Feet 1,105.001 $0.60 1 $663.00 $0.61 $674.05 1:\Enginening\2MCONM\IB-140shkosh I1fo1 4Bid L 31.18 Page 16 of 40 8/31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements (#5894635) Owner: City of Oshkosh, WI Solicitor. City of Oshkosh, WI Bid Opening: 08/31/2018 10:00 AM CDT Vinton Construction Company Domer Inc. PO Box 1987 Manitowoc, WI 54221 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Furnish and install 10 gauge black-coated wire; complete as 5261 specified Linear Feet 1,105.00 $0.60 $663.00 $0.61 $674.05 Furnish an insta 1 10 gauge green-coated wire; complete as 5262 specified Linear Feet 5,570.00 $0.60 $3,342.00 $0.61 $3,397.70 Furnish and install 12 gauge red-coated wire, 5270 complete as specified Linear Feet 460.00 $0.55 $253.00 $0.56 $257.60 Furnish and install 12 gauge black-coated wire; complete as 5271 specified Linear Feet 460.00 $0.55 $253.00 $0.56 $257.60 Furnish and install12 gauge green-coated wire; complete as 5272 specified Linear Feet 460.00 $0.55 $253.00 $0.56 $257.60 Install controller an cabinet; "City Supplied"; complete as 5320 specified Each 1.00 $2,000.00 $2,000.00 $2,040.00 $2,040.00 Fumish and install 14 gauge stranded wire; 5352 complete as specified Linear Feet 255.00 $0.60 $153.00 $0.61 $155.55 Furnish and install14 gauge stranded single pair twisted with shield; 5356 complete as specified Linear Feet 1,055.00 $1.30 $1,371.50 $1.33 $1,403.15 Furnish and install 14 AWG solid 5 conductor; 5362 complete as specified Linear Feet 440.00 $1.20 $528.00 $1.22 $536.80 Furnish and install 14 AWG solid 7 conductor; 5364 1complete as specified I Linear Feet 1 388.001 $1.50 1 $582.00 $1.53 $593.64 and install 14 lFumish AWG solid 9 conductor; 5366 complete as specified Linear Feet 946.00 $2.00 $1,892.00 $2.04 $1,929.84 P.\F ineerinp\3018 CONTRARS\I&IOOzhkoxh Ave Ami\Pmjen_Inform�tim\fonv�d IN 1\ I, Bk Tab &]Ide Page 17 of 40 8/31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements 05894635) Owner. City of Oshkosh, WI Solicitor: City of Oshkosh, WI Bid Opening: 08/31/201810:00 AM CDT Vinton Construction Company Dorner Inc. PO Box 1987 Manitowoc, WI 54221 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Furnish and instalM AWG solid 21 conductor; complete as 5372 specified Linear Feet 1,584.00 $3.50 $5,544.00 $3.57 $5,654.88 Furnish and install fuse holder; complete as 5380 specified Each 28.00 $75.00 $2,100.00 $77.00 $2,156.00 Furnish and install 5A fuse; complete as 5392 specified Each 28.00 $10.00 $280.00 $10.20 $285.60 Install single head fixture; "City Supplied"; 5400 complete as specified Each 13.00 $500.00 $6,500.00 $510.00 $6,630.00 Remove traffic signals; 5404 complete as specified Lump Sum 1.00 $1,750.00 $1,750.00 $1,785.00 $1,785.00 Install ummaire arms; on traffic signal poles, steel; 10' and LED luminaire heads; "City Supplied"; complete as 5410 specified Each 4.00 $300.00 $1,200.00 $306.00 $1,224.00 Install traffic signal pole; standard; aluminum; 10'; "City Supplied"; complete as 5420 specified Each 1.00 $175.00 $175.00 $179.00 $179.00 Install traffic signs pole; standard; aluminum; 15; "City Supplied"; complete as 5422 specified Each 4.00 $175.00 $700.00 $179.00 $716.00 Install WDOT Type 10 traffic signal poles; "City Supplied"; 5424 complete as specified Each 2.00 $1,850.00 $3,700.00 $1,887.00 $3,774.00 Install WDOT Type 13 traffic signal poles; "City Supplied"; 5426 complete as specified Each 2.00 $1,850.00 $3,700.00 $1,887.00 $3,774.00 I F_—A,3018 COMNACfS\I&11-1-Ave-1111.(1_1.1-11—II-1— W.11.119iJ Tib tlJl-18 Page 18 d40 8/31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements (115894635) Owner. City of Oshkosh, WI Solicitor. City of Oshkosh, WI Bid Opening: 08/31/201810:00 AM CDT Vinton Construction Company Domer Inc. PO Box 1987 Manitowoc, WI 54221 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Install monotube arms; 30'; "City Supplied'; 5428 complete as specified Each 2.00 $1,850.00 $3,700.00 $1,887.00 $3,774.00 Install monotube amus; 45; "City Supplied'; 5430 complete as specified Each 2.00 $1,850.00 $3,700.00 $1,887.00 $3,774.00 Install 3 -section traffic signal head'; "City Supplied'; complete as 5434 specified Each 12.00 $175.00 $2,100.00 $179.00 $2,148.00 Insta 4 -section tr 'c signal head; "City Supplied'; complete as 5436 specified Each 8.00 $225.00 $1,800.00 $230.00 $1,840.00 Inst pe estrian signs head with countdown timer; "City Supplied'; 5438 complete as specified Each 7.00 $175.00 $1,225.00 $179.00 $1,253.00 Install pedestrian push button; "City Supplied"; 5440 complete as specified Each 7.00 $125.00 $875.00 $128.00 $896.00 Furnish and install Type 2 Base; complete 5502 as specified Each 16.00 $875.00 $14,000.00 $893.00 $14,288.00 Furnish and install Type 10 base; complete 5510 as specified Each 2.00 $7,500.00 $15,000.00 $7,650.00 $15,300.00 Furnish and install Type 13 base; complete 5512 as specified Each 2.00 $15,000.00 $30,000.00 $15,300.00 $30,600.00 un -is and install temporary traffic controVoperations; 5999 complete as specified Lump Sum 1.00 $35,000.00 $35,000.00 $35,700.00 $35,700.00 Section 2: Alternate A (Awarded) $53,388.75 $71,030.00 Furnish; install; maintain; and remove stone tracking pad; A-2512 complete as specified Each 1.00 $1,500.00 $1,500.00 $2,500.00 52,500.00 1.'. F - -NIS coMxw \r 4— A—A—\\cN,o-r,—\1S-u--_5-31 Is Page 19 of 40 914/2111,1 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements (!!5894635) Owner. City of Oshkosh, WI Solicitor. City of Oshkosh, WI Bid Opening: 08/311201810:00 AM CDT Vinton Construction Company Domer Inc. PO Box 1987 Manitowoc, WI 54221 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension A-2514 Fumis ; insta ; maintain; and remove silt fence; complete as specified Linear Feet 350.00 $3.00 $1,050.00 $4.10 $1,435.00 A-2602 Install salvaged topsoil 6 depth; complete as specified Square Yards 675.00 $2.50 $1,687.50 $1.10 $742.50 A-2619 Furnish and install perennial rye grass; complete as specified Square Yards 675.00 $0.50 $337.50 $4.10 $2,767.50 A-2644 Furnish aninsta hydraulically-applied erosion control product; complete as specified Square Yards 675.00 $1.10 $742.50 $4.10 $2,767.50 A-2902 Strip and stockpile topsoil; complete as specified Square Yards 675.00 $1.50 $1,012.50 $1.10 $742.50 A-2932 Import clay material; complete as specified Cubic Yards 4,005.00 $11.75 $47,058.75 $15.00 $60,075.00 Section 3: Alternate B (Not Awarded) $65,361.60 $72,090.00 B-2932 Import clay material; complete as specified Cubic Yards 4,005.00 $16.32 $65,361.60 $18.00 $72,090.00 Bid Total: 1$3,126,518.07 $3,205,337.25 I E­­-UconrxA­--k—A.<W,A-1 eWr,e­Page 20 of 40 9/4/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements 05894635) Owner. City of Oshkosh, WI Solicitor. City of Oshkosh, WI Bid Opening: 08/31/201810:00 AM CDT Wood Sewer & Excavating, Inc. Carl Bowers & Sons Const Co. Inc. Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Section 1: Base Bid $3,898,137.40 $4,225,825.29 Clearing; complete as 1010 specified Stations 4.30 $900.00 $3,870.00 $1,200.00 $5,160.00 Clearing; complete as 1011 specified Inch Diameter 315.00 $16.00 $5,040.00 $20.00 $6,300.00 Grubbing; complete as 1020 specified Stations 4.30 $330.00 $1,419.00 $1,200.00 $5,160.00 Grubbing, complete as 1021 specified Inch Diameter 315.00 $6.00 $1,890.00 $20.00 $6,300.00 Removing pavement; 1100 complete as specified Square Yards 950.00 $6.00 $5,700.00 $3.00 $2,850.00 Removing curb and gutter; complete as 1110 specified Linear Feet 1,065.00 $6.00 $6,390.00 $5.00 $5,325.00 Removing concrete and asphalt sidewalk and driveway; complete as 1120 specified Square Feet 11,250.00 $1.00 $11,250.00 $0.80 $9,000.00 Unclassified excavation; 1200 complete as specified Cubic Yards 3,350.00 $15.00 $50,250.00 $12.00 $40,200.00 Strip and stockpile topsoil for North Koeller Street; complete 1202A as specified Lump Sum 1.00 $10,000.00 $10,000.00 $6,000.00 $6,000.00 Strip and stockpile topsoil for North Westfield Street; 1202B complete as specified Lump Sum 1.00 $6,000.00 $6,000.00 $2,000.00 $2,000.00 8" concrete pavement doweled; with 6" CABC and grading; complete 1314A as specified Square Yards 5,825.00 $59.00 $343,675.00 $76.00 $442,700.00 8' concrete pavement doweled; HES; with 6" CABC and grading; 1315 complete as specified Square Yards 1 755.001 $66.00 1 $49,830.00 1 $79.00 1$59,645.00 I Ave Ati\Pmjen_Infomutlan\Cono-ad Wo\ 1614 BiJ Lb &JLI2 Page 21 of 40 8/31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements 05894635) Owner: City of Oshkosh, WI Solicitor. City of Oshkosh, WI Bid Opening: 08/31/201810:00 AM CDT Wood Sewer & Excavating, Inc. Carl Bowers & Sons Const Co. Inc. Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension 9" concrete pavement HES; with 6" CABC and grading; complete as 1323 specified Square Yards 1,465.00 $69.00 $101,085.00 $87.00 $127,455.00 Concrete pavement gaps; complete as 1334 specified Each 1.00 $1,000.00 $1,000.00 $1,100.00 $1,100.00 Crushed aggregate base course; complete as 1340 specified Tons 1,325.00 $15.00 $19,875.00 $12.00 $15,900.00 Pavement ties; complete 1350 as specified Each 455.00 $10.00 $4,550.00 $9.00 $4,095.00 Drilled dowel bars; 1 1/4"; complete as 1354 specified Each 65.00 $14.00 $910.00 $16.00 $1,040.00 Adjust manholes and inlets, complete as 1360 specified Each 31.00 $350.00 $10,850.00 $400.00 $12,400.00 Turf restoration on North Koeller Street; 1370A complete as specified Square Yards 4,103.20 $10.00 $41,032.00 $12.00 $49,238.40 Turf restoration on Oshkosh Avenue; 1370B complete as specified Square Yards 2,882.10 $10.00 $28,821.00 $12.00 $34,585.20 Turf restoration on North Westfield Street; 1370C complete as specified Square Yards 1,911.80 $10.00 $19,118.00 $12.00 $22,941.60 Turf restoration on Rath Lane; complete as 1370D specified Square Yards 903.00 $10.00 $9,030.00 $12.00 $10,836.00 Cold weather covering (concrete pavement) - single visquine; 1380 complete as specified Square Yards 750.00 $1.50 $1,125.00 $2.50 $1,875.00 Cold weather covering (concrete pavement) - double visquine; 1382 complete as specified I Square Yards 750.001 $2.50 $1,875.00 $3.50 $2,625.00 I:1Ery{merin8—S CONTI MNIB-li Orh4eeF Ave Arcs\ R*djfnm .X C-rc I.W ILII Bid Tib&31.18 Page 22 of 411 8/31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment infrastructure Improvements 05894635) Owner. City of Oshkosh, WI Solicitor. City of Oshkosh, WI Bid Opening: 08/31/201810:00 AM CDT Wood Sewer & Excavating, Inc. Carl Bowers & Sons Const Co. Inc. Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Cold weather covering (concrete pavement) - double visquine with 6" hay; complete as 1384 specified Square Yards 750.00 $10.00 $7,500.00 $11.00 $8,250.00 Up -charge for late season cold weather concrete pavement; 1390 complete as specified Cubic Yards 380.00 $7.00 $2,660.00 $8.00 $3,040.00 12" radius curb with 6" CABC and grading; 1410 complete as specified Linear Feet 175.00 $10.00 $1,750.00 $11.00 $1,925.00 4" concrete sidewalk with 3" CABC and grading; complete as 1500 specified Square Feet 19,200.00 $5.60 $107,520.00 $6.65 $127,680.00 6' concrete sidewalk/ driveway/ramp with 3" CABC and grading; 1510 complete as specified Square Feet 1,235.00 $6.00 $7,410.00 $7.15 $8,830.25 8" concrete sidewalk/ driveway/ramp with 3" CABC and grading; 1520 complete as specified Square Feet 5,500.00 $6.75 $37,125.00 $7.75 $42,625.00 Curb ramp detectable warning field (natural/non-painted); 1540 complete as specified Square Feet 80.00 $35.00 $2,800.00 $38.00 $3,040.00 No. 4 reinforcing rods - deformed; epoxy - coated; complete as 1550 specified Linear Feet 360.00 $2.00 $720.00 $1.35 $486.00 Driffe—cTNo. 4 sidewalk tie bars - deformed; epoxy -coated; complete 1560 as specified Each 16.00 $7.00 $112.00 1 $6.00 $96.00 EnpinvennK\2UIS CONTRAfES\I&14 OSF4oxh Ave Aa.\Prujen ln(ormnVo"\Comud lnlol ltl ltl gidT .31- Page 23 of 40 8/31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements (45894635) Owner: City of Oshkosh, WI Solicitor. City of Oshkosh, WI Bid Opening: 08/31/2018 10:00 AM CDT Wood Sewer & Excavating, Inc. Carl Bowers & Sons Const Co. Inc. Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Cold weather covering (sidewalk) - single visquine; complete as 1580 specified Square Feet 3,750.00 $0.20 $750.00 $0.50 $1,875.00 Cod weather covering (sidewalk) - double visquine; complete as 1582 specified Square Feet 3,750.00 $0.30 $1,125.00 $1.00 $3,750.00 Cod west er covering (sidewalk) - double visquine with 6" hay, 1584 complete as specified Square Feet 3,750.00 $1.00 $3,750.00 $1.00 $3,750.00 Up -c arge or ate season cold weather concrete pavement; 1590 complete as specified Cubic Yards 105.00 $10.00 $1,050.00 $10.00 $1,050.00 Locate existing property monuments; complete 1650 as specified Each 25.00 $160.00 $4,000.00 $150.00 $3,750.00 Replace existing property monuments; 1652 complete as specified Each 10.00 $55.00 $550.00 $75.00 $750.00 Sawing existing pavement; complete as 1700 specified Linear Feet 200.00 $2.00 $400.00 $5.00 $1,000.00 Sawing concrete pavement full depth; 1710 complete as specified Linear Feet 1,225.00 $3.00 $3,675.00 $3.00 $3,675.00 4" asp a tic surface LT with 6" CABC and grading; complete as 1916 specified Square Yards 215.00 $78.00 $16,770.00 $70.00 $15,050.00 Pavement markings; epoxy; 8" (white); 1974 complete as specified Linear Feet 4,145.00 $1.00 $4,145.00 $1.00 $4,145.00 Pavement markings; epoxy; 4" (white); 1975 lcomplete, as specified I Linear Feet 1 190.001 $8.00 1 $1,520.00 1 $7.90 1 $1,501.00 I.\EnBi-ft\-8CONTRACTS\- Oshk-eve Arc.\Prgei Womuum\Conn.a 1-\-4 BWTA Wl- Page 24 of 40 8/31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements Q5894635) Owner. City of Oshkosh, WI Solicitor: City of Oshkosh, WI Bid Opening: 08/31/201810:00 AM CDT Wood Sewer & Excavating, Inc. Carl Bowers & Sons Const Co. Inc. Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Pavement markings; epoxy; 4" (yellow); 1976 complete as specified Linear Feet 5,800.00 $0.50 $2,900.00 $0.60 $3,480.00 Pavement markings; cross -walk epoxy; 12" (white); complete as 1977 specified Linear Feet 485.00 $10.00 $4,850.00 $10.00 $4,850.00 Pavement markings; stop -line epoxy; 18" (white); complete as 1978 specified Linear Feet 140.00 $11.00 $1,540.00 $11.25 $1,575.00 Pavement markings, arrow epoxy; Type 1 (white); complete as 1979 specified Each 2.00 $220.00 $440.00 $220.00 $440.00 Pavement markings; arrow epoxy; Type 2 (white); complete as 1980 specified Each 7.00 $300.00 $2,100.00 $290.00 $2,030.00 Pavement markings; arrow epoxy; Type 3 (white); complete as 1981 specified Each 4.00 $350.00 $1,400.00 $370.00 $1,480.00 Pavement markings, epoxy; 12" (yellow) diagonal; complete as 1982 specified Linear Feet 125.00 $10.00 $1,250.00 $12.00 $1,500.00 Furnish and install 6" storm sewer; complete 2000 as specified Linear Feet 160.00 $36.00 $5,760.00 $55.00 $8,800.00 Furnish and install 8" storm sewer; complete 2001 as specified Linear Feet 10.00 $52.00 $520.00 $65.00 $650.00 Furnish and install 10" storm sewer; complete 2002 as specified Linear Feet 20.00 $62.00 $1,240.00 $67.00 $1,340.00 Furnish and install 12" storm sewer; complete 2003 1 as specified I Linear Feet 1 610.001 $62.00 1 $37,820.00 1 $57.00 1 $34,770.00 1:1Enpurnng\IUItl -1- I.l Osh Ave Ami\PrgxLlNmmewn\ConVxtI ISIS Bid Page 25 of 40 8/31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements (85894635) Owner. City of Oshkosh, WI Solicitor. City of Oshkosh, WI Bid Opening: 08/31/201810:00 AM CDT Wood Sewer & Excavating, Inc. Carl Bowers & Sons Const Co. Inc. Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Furnish and install 12" RCP Class III storm sewer; complete as 2004 specified Linear Feet 50.00 $62.00 $3,100.00 $68.00 $3,400.00 Furnish and install 15" storm sewer; complete 2006 as specified Linear Feet 345.00 $70.00 $24,150.00 $74.00 $25,530.00 Furnish and install 15" RCP Class III storm sewer; complete as 2007 specified Linear Feet 35.00 $66.00 $2,310.00 $75.00 $2,625.00 Furnish and install 18" storm sewer; complete 2009 as specified Linear Feet 675.00 $79.00 $53,325.00 $76.00 $51,300.00 Furnish and install 18" RCP Class III storm sewer; complete as 2010 specified Linear Feet 80.00 $68.00 $5,440.00 $78.00 $6,240.00 Furnish and install 24" storm sewer; complete 2015 as specified Linear Feet 230.00 $89.00 $20,470.00 $95.00 $21,850.00 Furnish and insta 24" RCP Class III storm sewer; complete as 2016 specified Linear Feet 95.00 $64.00 $6,080.00 $120.00 $11,400.00 Fumish and install 30" storm sewer; complete 2021 as specified Linear Feet 2,670.00 $104.00 $277,680.00 $85.00 $226,950.00 Furnish and install 48" storm sewer; complete 2030 as specified Linear Feet 1,175.00 $128.00 $150,400.00 $130.00 $152,750.00 Furnish and install 19" x 30" HERCP Class III storm sewer; complete 2047 as specified Linear Feet 30.00 $136.00 $4,080.00 $90.00 $2,700.00 Furnish and install 24" x 38" HERCP Class III storm sewer; complete 2049 las specified Linear Feet 220.00 $136.00 $29,920.00 $125.00 $27,500.00 k\Engincenng\3010fONiRA(TS\1614 OshkasA Ave A. kNgl Informv6-1-Into\I-BIJTab--I1 Page 26 of 40 8/31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements (#5894635) Owner: City of Oshkosh, WI Solicitor. City of Oshkosh, WI Bid Opening: 08/31/201810:00 AM CDT Wood Sewer & Excavating, Inc. Carl Bowers & Sons Const Co. Inc. Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Furnish and install 6" storm sewer valve; 2199 complete as specified Each 1.00 $1,800.00 $1,800.00 $1,300.00 $1,300.00 Furnish and install standard storm sewer manhole (4' diameter); 2201 complete as specified Vertical Feet 35.10 $390.00 $13,689.00 $450.00 $15,795.00 Furnish and install standard storm sewer manhole (5' diameter); 2202 complete as specified Vertical Feet 73.75 $520.00 $38,350.00 $600.00 $44,250.00 Fumis and install standard storm sewer manhole (7 diameter); 2204 complete as specified Vertical Feet 26.90 $680.00 $18,292.00 $850.00 $22,865.00 Fun -fish an insta standard storm sewer manhole (4' x 4' box); 2207 complete as specified Vertical Feet 3.25 $1,200.00 $3,900.00 $800.00 $2,600.00 FurrusE—ZT-m-stall standard storm sewer manhole (6'x 6' box); 2209 complete as specified Vertical Feet 8.15 $1,500.00 $12,225.00 $850.00 $6,927.50 Furnish anInst standard storm sewer manhole (7'x 7' box); 2210 complete as specified Vertical Feet 9.10 $1,800.00 $16,380.00 $1,000.00 $9,100.00 T—ur—ru-sFa—nd install standard storm sewer inlet manhole (4' diameter); complete as 2213 specified Vertical Feet 5.70 $528.00 $3,009.60 $450.00 $2,565.00 Furnish and costa standard storm sewer inlet manhole (5' diameter); complete as 2214 specified Vertical Feet 24.55 $510.00 $12,520.50 $600.00 $14,730.00 I OSNaJi Ave Ares\�re�xt_INomution\Cannri Into\I6N BIJ Lb LLJI-Itl Page 27 of 40 8/31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements 015894635) Owner: City of Oshkosh, WI Solicitor: City of Oshkosh, WI Bid Opening: 08/31/201810:00 AM CDT Wood Sewer & Excavating, Inc. Carl Bowers & Sons Const Co. Inc. Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Furnish and install standard storm sewer inlet manhole (4'x 4' box); complete as 2219 specified Vertical Feet 14.70 $690.00 $10,143.00 $600.00 $8,820.00 Furnish and install storm sewer junction Chamber, complete as 2225 specified Each 1.00 $129,000.00 $129,000.00 $140,000.00 $140,000.00 Furnish and install Type 1 inlet, complete 2236 as specified Each 5.00 $1,800.00 $9,000.00 $2,000.00 $10,000.00 Furnish and install Type 3 inlet (with 18" sump); complete as 2237 specified Each 13.00 $2,000.00 $26,000.00 $2,000.00 $26,000.00 Furnish and install- storm sewer marker balls; complete as 2404 specified Each 5.00 $40.00 $200.00 $30.00 $150.00 Furnish and install storm sewer clay dams; 2406 complete as specified Each 5.00 $120.00 $600.00 $100.00 $500.00 urrus ; install; maintain; and remove Type D modified inlet protection; complete as 2508 specified Each 54.00 $150.00 $8,100.00 $115.00 $6,210.00 Sediment removal - Type D modified inlet protection; complete as 2510 specified Each 54.00 $30.00 $1,620.00 $25.00 $1,350.00 Furnish; insta ; maintain; and remove stone tracking pad; 2512 complete as specified Each 2.00 $2,400.00 $4,800.00 $1,500.00 $3,000.00 i. Page 28 of 40 8(31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements (#5894635) Owner. City of Oshkosh, WI Solicitor: City of Oshkosh, WI Bid Opening: 08/31/201810:00 AM CDT Wood Sewer & Excavating, Inc. Carl Bowers & Sons Const Co. Inc. Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Furnish; install; maintain; and remove silt fence; complete as 2514 specified Linear Feet 5,250.00 $2.00 $10,500.00 $2.50 $13,125.00 Furnish; install; maintain; and remove stone bag; complete as 2516 specified Each 75.00 $20.00 $1,500.00 $10.00 $750.00 urrus ; install; maintain; and remove 12' diameter sediment logs; complete as 2518 specified Linear Feet 825.00 $7.00 $5,775.00 $10.00 $8,250.00 Fumis ; install; maintain; and remove ditch check; complete as 2522 specified Each 27.00 $160.00 $4,320.00 $150.00 $4,050.00 Furnish; install; maintain; and remove dewatering tank system; complete as 2524 specified Each 2.00 $25,000.00 $50,000.00 $700.00 $1,400.00 Furnish; install; maintain; and remove turbidity barrier; 2526 complete as specified Each 2.00 $1,200.00 $2,400.00 $6,000.00 $12,000.00 Furnish and install salvaged topsoil; 2601 complete as specified Lump Sum 1.00 $150,000.00 $150,000.00 $100,000.00 $100,000.00 Install salvaged topsoil 12" depth; complete as 2606 specified Square Yards 1,105.00 $5.00 $5,525.00 $2.25 $2,486.25 Funush and install aquatic protective fencing, complete as 2609 specified Linear Feet 1,930.00 $6.00 $11,580.00 $6.00 $11,580.00 Furnish and install perennial rye grass; 2619 complete as specified Square Yards 4,020.00 $3.00 $12,060.00 $1.00 $4,020.00 I� INo\Id11 Bid— --- .4. Page 29 of 40 8/31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements 05894635) Owner: City of Oshkosh, WI Solicitor. City of Oshkosh, WI Bid Opening: 08/31/2018 10:00 AM CDT Wood Sewer & Excavating, Inc. Carl Bowers & Sans Const Co. Inc. Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Furnish and install turf grass; complete as 2621 specified Lump Sum 1.00 $69,000.00 $69,000.00 $75,000.00 $75,000.00 Furnish and install annual cover crop; 2625 complete as specified Lump Sum 1.00 $66,600.00 $66,600.00 $45,000.00 $45,000.00 Furnish and install Class I; Urban; Type A erosion control mat; 2633 complete as specified Lump Sum 1.00 $18,900.00 $18,900.00 $25,000.00 $25,000.00 Furnish and install reinforced grass pavement system; 2640 complete as specified Square Yards 430.00 $120.00 $51,600.00 $150.00 $64,500.00 Furnish and insta hydraulically -applied erosion control product; 2645 complete as specified Lump Sum 1.00 $33,000.00 $33,000.00 $20,000.00 $20,000.00 Furnish and install medium rip -rap with filter fabric; complete as 2648 specified Square Yards 190.00 $80.00 $15,200.00 $45.00 $8,550.00 Furnish and install heavy rip -rap with filter fabric; complete as 2650 specified Square Yards 185.00 $80.00 $14,800.00 $55.00 $10,175.00 FurnisF-a—nd install prairie treatment system; complete as 2660 specified Lump Sum 1.00 $160,000.00 $160,000.00 $170,000.00 $170,000.00 Rock excavation; 2750 complete as specified Cubic Yards 10.00 $0.01 $0.10 $400.00 $4,000.00 Abandon 8" - 12" storm sewer; complete as 2800 specified Linear Feet 450.00 $6.00 $2,700.00 $10.00 $4,500.00 Abandon 15" and larger storm sewer; complete 2802 as specified Linear Feet 1,580.00 $20.00 $31,600.00 $40.00 $63,200.00 I CnRinnnnX 11a1tl CONTRACTS\Isla Orhko..h Ave Are.\ Info\ 1&14 Bid T.b &31-V Page 30 of 40 8/31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements (!75894635) Owner: City of Oshkosh, WI Solicitor: City of Oshkosh, WI Bid Opening: 08/31/2018 10:00 AM CDT Wood Sewer & Excavating, Inc. Carl Bowers & Sons Const Co. Inc. Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Remove 30" and smaller storm sewer; complete 2804 as specified Linear Feet 120.00 $25.00 $3,000.00 $40.00 $4,800.00 Abandon storm sewer manholes and inlets; 2810 complete as specified Each 2.00 $600.00 $1,200.00 $500.00 $1,000.00 Remove storm sewer manholes and inlets; 2812 complete as specified Each 6.00 $600.00 $3,600.00 $500.00 $3,000.00 Connect to existing storm sewer main, 2850 complete as specified Each 8.00 $1,700.00 $13,600.00 $1,200.00 $9,600.00 Connect to existing storm sewer manhole; 2856 complete as specified Each 4.00 $1,800.00 $7,200.00 $1,200.00 $4,800.00 Conned to existing storm sewer inlet; 2858 complete as specified Each 2.00 $700.00 $1,400.00 $1,200.00 $2,400.00 Strip and stockpile topsoil; complete as 2903 specified Lump Sum 1.00 $110,000.00 $110,000.00 $32,000.00 $32,000.00 Clear trees; complete as 2906 specified Lump Sum 1.00 $1,900.00 $1,900.00 $10,000.00 $10,000.00 Grub stumps; complete 2912 as specified Lump Sum 1.00 $1,900.00 $1,900.00 $20,000.00 $20,000.00 Storm sewer utility line opening (ULO); 2914 complete as specified Each 2.00 $600.00 $1,200.00 $1,000.00 $2,000.00 General excavation; 2930 complete as specified Lump Sum 1.00 $134,000.00 $134,000.00 $520,000.00 $520,000.00 Excavation below subgrade - detention basin; complete as 2931 specified I Cubic Yards 1 2,000.001 $16.00 1 $32,000.00 $10.00 1 $20,000.00 Construct clay liner; 2934 complete as specified Lump Sum 1 1.00 $109,000.00 $109,000.00 $50,000.00 $50,000.00 Ip I. -- —11.11 -- Ave A-11, K Fnlo,meian\-1— 1-U .14 Bid LF 6J1-10 Page 31 of 40 8/312018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements (115894635) hkosh, WI shkosh, WI jidOpEening: 1/201810:00 AM CDT Wood Sewer & Excavating, Inc. Carl Bowers & Sons Const Co. Inc. Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Furnish; insta ; maintain; and remove chain link safety fencing; complete as 2946 specified Linear Feet 1,150.00 $18.00 $20,700.00 $10.00 $11,500.00 Furnish and install 3 backflow preventer; 2972 complete as specified Each 1.00 $19,900.00 $19,900.00 $12,000.00 $12,000.00 Furnish and install 8" sanitary sewer (new); 3030 complete as specified Linear Feet 100.00 $124.00 $12,400.00 $110.00 $11,000.00 Furnish and install 10" sanitary sewer (new); 3032 complete as specified Linear Feet 120.00 $136.00 $16,320.00 $120.00 $14,400.00 Furnishand install15" sanitary sewer (new); 3036 complete as specified Linear Feet 380.00 $149.00$56,620.00 $130.00 $49,400.00 Furnish and insta standard sanitary sewer manhole (4' diameter); 3100 complete as specified Vertical Feet 16.00 $310.00 $4,960.00 $350.00 $5,600.00 Furnish and install external sanitary sewer manhole chimney seal; 3114 complete as specified Each 2.00 $380.00 $760.00 $450.00 $900.00 umis an insta external sanitary sewer manhole chimney seal extension; complete as 3116 specified Each 2.00 $150.00 $300.00 $350.00 $700.00 Furnish and install internal sanitary sewer manhole chimney seal; 3118 complete as specified Each 1.00 $400.00 $400.00 $350.00 $350.00 urrus an nista internal sanitary sewer manhole chimney seal extension; complete as 3120 specified Each 1.00 $150.00 $150.00 $250.00 $250.00 r jne<,;,,R\101tl COMRACISUe-I�1-h Avr Ar«�\Pegea_Infurmatian\Contr�n INo\I611­Tbtlj-" Page 32 of 40 8/31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements 075894635) Owner. City of Oshkosh, WI Solicitor. City of Oshkosh, WI Bid Opening: 08/31/201810:00 AM CDT Wood Sewer & Excavating, Inc. Carl Bowers & Sons Const Co. Inc. Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Furnish and install 6" sanitary sewer "Insert -A. Tee" or "Kor-N-Tee'; 3222 complete as specified Each 1.00 $2,100.00 $2,100.00 $550.00 $550.00 Furnish and install 6" sanitary sewer laterals (new); complete as 3232 specified Linear Feet 45.00 $78.00 $3,510.00 $110.00 $4,950.00 Furnish and insta sanitary sewer lateral marker balls; complete 3236 as specified Each 2.00 $40.00 $80.00 $30.00 $60.00 Furnish and install clay dams; complete as 3238 specified Each 1.00 $100.00 $100.00 $100.00 $100.00 Furnish and install connection to existing 8" sanitary sewer mains; 3300 complete as specified Each 1.00 $1,800.00 $1,800.00 $2,000.00 $2,000.00 Furnish and install connection to existing 15' sanitary sewer mains; complete as 3306 specified Each 1.00 $2,000.00 $2,000.00 $3,000.00 $3,000.00 Furnish and install 18" sanitary sewer open cut casing pipes; complete 3410 as specified Linear Feet 10.00 $300.00 $3,000.00 $300.00 $3,000.00 Rock excavation; 3600 complete as specified Cubic Yards 25.00 $0.01 $0.25 $400.00 $10,000.00 Closed circuit televising, complete as 3700 specified Linear Feet 600.00 $3.00 $1,800.00 $2.50 $1,500.00 Furnish and install new 6" ductile iron water main with polywrap; 4020 complete as specified Linear Feet 160.00 $84.00 $13,440.00 $160.00 $25,600.00 I:IE ...-N20:8 MNTRA-I-Osbkoah Info\I - Bid Tb &31-1A Page 33 of 40 8/31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements (#5894635) Owner: City of Oshkosh, WI Solicitor. City of Oshkosh, WI Bid Opening: 08/31/201810:00 AM CDT Wood Sewer & Excavating, Inc. Carl Bowers & Sons Const Co. Inc. Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Furnish and install new 10" ductile iron water main with polywrap; 4024 complete as specified Linear Feet 95.00 $85.00 $8,075.00 $180.00 $17,100.00 Furnish and install new 12" ductile iron water main with polywrap; 4026 complete as specified Linear Feet 2,095.00 $129.00 $270,255.00 $165.00 $345,675.00 Furnish and install 2" water service (new); 4046 complete as specified Linear Feet 45.00 $76.00 $3,420.00 $110.00 $4,950.00 Furnish and install 2" corporation and stop box; complete as 4053 specified Each 1.00 $990.00 $990.00 $1,500.00 $1,500.00 Furnish and install water service clay dams; complete as 4055 specified Each 2.00 $100.00 $200.00 $100.00 $200.00 Furnish and install connections to existing 10" water main; 4062 complete as specified Each 1.00 $4,800.00 $4,800.00 $2,000.00 $2,000.00 Furnish and install connections to existing 12" water main, 4064 complete as specified Each 2.00 $3,960.00 $7,920.00 $2,000.00 $4,000.00 Furnish and install 12" x 6" water main tee; 4128 complete as specified Each 8.00 $1,090.00 $8,720.00 $930.00 $7,440.00 Furnish and install 12" x 10" water main tee; 4130 complete as specified Each 1.00 $1,150.00 $1,150.00 $1,100.00 $1,100.00 Furnish and install 12 11-1/4 degree water main bend; complete as 4221 specified Each 2.00 $780.00 $1,560.00 $740.00 $1,480.00 I:\F BinarinB\3018 fOM1UCT5\ Ibp Osh4wM1 Ave Arc.\Pnyen Info,mnim\Contr.n Info\ I&11 BiJ Lb LLJLItl Page 34 of 40 8/31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements (1!5894635) Owner: City of Oshkosh, WI Solicitor. City of Oshkosh, WI Bid Opening: 08/31/2018 10:00 AM CDT Wood Sewer & Excavating, Inc. Carl Bowers & Sons Const Co. Inc. Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Furnish and install 12" 22-1/2 degree water main bend; complete as 4230 specified Each 6.00 $750.00 $4,500.00 $760.00 $4,560.00 Furnish and install 6" 45 degree water main bend; complete as 4236 specified Each 14.00 $360.00 $5,040.00 $4-00.00 $5,600.00 Furnish and install 10 45 degree water main bend; complete as 4238 specified Each 4.00 $490.00 $1,960.00 $585.00 $2,340.00 Furnish and install 12" 45 degree water main bend; complete as 4239 specified Each 2.00 $800.00 $1,600.00 $815.00 $1,630.00 Furnish and install 6" water main cap; 4254 complete as specified Each 1.00 $200.00 $200.00 $200.00 $200.00 Furnish and install 6" water main gate valve; 4401 complete as specified Each 8.00 $1,190.00 $9,520.00 $1,300.00 $10,400.00 Furnish and install 10" water main gate valve; 4403 complete as specified Each 1.00 $2,220.00 $2,220.00 $2,500.00 $2,500.00 Furnish and install 12" water main gate valve; 4404 complete as specified Each 7.00 $2,730.00 $19,110.00 $3,000.00 $21,000.00 Fun -is aninstall 12" x 12" tapping valve and sleeve; complete as 4449 specified Each 1.00 $8,900.00 $8,900.00 $5,000.00 $5,000.00 Furnish and install hydrant; complete as 4500 specified Each 6.00 $3,770.00 $22,620.00 $4,000.00 $24,000.00 Furnish and install 20" water main casing pipe; 4728 complete as specified Linear Feet 12.001 $300.00 $3,600.00 $300.00 1 $3,600.00 I,\ Engi—gk— CONiRAM% —4 OSF4usM1 Ave Aro\Prgnt_Inlormnian\Comnd Wo\ —4 - Lb tl-JI-Itl Page 35 of 40 8/312018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements 05894635) Owner: City of Oshkosh, Wl Solicitor. City of Oshkosh, WI Bid Opening: 08/31/201810:00 AM CDT Wood Sewer & Excavating, Inc. Carl Bowers & Sons Const Co. Inc. Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Rock excavation; 4800 complete as specified Cubic Yards 25.00 $0.01 $0.25 $0.01 $0.25 Furnish and install pulf- box - non-conductive; 24" x 42"; complete as 5019 specified Each 17.00 $1,600.00 $27,200.00 $1,400.00 $23,800.00 Adjust pull box; 5025 complete as specified Each 17.00 $220.00 $3,740.00 $150.00 $2,550.00 Remove pull box; 5026 complete as specified Each 3.00 $100.00 $300.00 $110.00 $330.00 Remove concrete base; 5027 complete as specified Each 6.00 $200.00 $1,200.00 $110.00 $660.00 Furnish and install 3" Schedule 40 PVC; 5130 complete as specified Linear Feet 3,000.00 $9.00 $27,000.00 $8.00 $24,000.00 Furnish and install 3" Schedule 80 PVC; 5132 complete as specified Linear Feet 160.00 $11.00 $1,760.00 $9.00 $1,440.00 Furnish and insta Schedule 80 PVC conduit; trenchless installation; complete as 5134 specified Linear Feet 250.00 $35.00 $8,750.00 $21.00 $5,250.00 Connect to existing pull box; complete as 5180 specified Each 14.00 $135.00 $1,890.00 $150.00 $2,100.00 Connect to existing conduit; complete as 5184 specified Each 3.00 $125.00 $375.00 $150.00 $450.00 Furnish and install 4 gauge red-coated wire; 5230 complete as specified Linear Feet 3,905.00 $2.00 $7,810.00 $1.40 $5,467.00 Furnish and insta 4 gauge black-coated wire; complete as 5231 specified Linear Feet 3,905.00 $2.00 $7,810.00 $1.40 $5,467.00 Furnish and install 10 gauge red-coated wire; 5260 complete as specified I Linear Feet 1,105.00 $1.00 $1,105.00 $0.70 $773.50 IAve Ami\Projert_Infurm,lion\Cantr�d Info\ 1614 BIa Lb w3618 Page 36 of 40 8/31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements (#5894635) Owner. City of Oshkosh, WI Solicitor: City of Oshkosh, WI Bid Opening: 08/31/2018 10:00 AM CDT Wood Sewer & Excavating, Inc. Carl Bowers & Sons Const Co. Inc. Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Furnish and insta 10 gauge black -coated wire; complete as 5261 specified Linear Feet 1,105.00 $1.00 $1,105.00 $0.70 $773.50 Fumis an insta 10 gauge green -coated wire; complete as 5262 specified Linear Feet 5,570.00 $0.70 $3,899.00 $0.70 $3,899.00 Furnish and install 12 gauge red -coated wire; 5270 complete as specified Linear Feet 460.00 $0.60 $276.00 $0.65 $300.84 Fumis an insta 12 gauge black -coated wire, complete as 5271 specified Linear Feet 460.00 $0.60 $276.00 $0.65 $299.00 Fumis an insta 12 gauge green -coated wire; complete as 5272 specified Linear Feet 460.00 $0.60 $276.00 $0.65 $299.00 Inst contro er an cabinet; "City Supplied"; complete as 5320 specified Each 1.00 $700.00 $700.00 $2,200.00 $2,200.00 Furnish and install 14 gauge stranded wire; 5352 complete as specified Linear Feet 255.00 $1.00 $255.00 $0.70 $178.50 Fumis an insta 14 gauge stranded single pair twisted with shield; 5356 complete as specified Linear Feet 1,055.00 $1.30 $1,371.50 $1.50 $1,582.50 Furnish and install 14 AWG solid 5 conductor; 5362 complete as specified Linear Feet 440.00 $1.40 $616.00 $1.50 $660.00 Furnish and install 14 AWG solid 7 conductor; 5364 complete as specified Linear Feet 388.00 $1.70 $659.60 $2.00 $776.00 Furnish and install 14 AWG solid 9 conductor; 5366 complete as specified Linear Feet 946.00 $2.00 $1,892.00 $2,838.00 1 COYTR %1 4Osh{: Avn A,ri\Project Inf.m,,.XCannan Info\ -4 Bid L 31-I8 Page 37 of 40 8/31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements (#5894635) Owner. City of Oshkosh, WI Solicitor. City of Oshkosh, WI Bid Opening: 08/31/2018 10:00 AM CDT Wood Sewer & Excavating, Inc. Carl Bowers & Sons Const Co. Inc. Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Fumis aninstal 14 AWG solid 21 conductor; complete as 5372 specified Linear Feet 1,584.00 $3.40 $5,385.60 $4.50 $7,128.00 Furnish and install fuse holder; complete as 5380 specified Each 28.00 $40.00 $1,120.00 $100.00 $2,800.00 Furnish and install 5A fuse; complete as 5392 specified Each 28.001 $6.00 $168.00 $20.00 $560.00 Install single head fixture; "City Supplied'; 5400 complete as specified Each 13.00 $730.00 $9,490.00 $600.00 $7,800.00 Remove traffic signals; 5404 complete as specified Lump Sum 1.00 $2,640.00 $2,640.00 $2,000.00 $2,000.00 Install ummaire arms; on traffic signal poles; steel; 10' and LED luminaire heads; "City Supplied"; complete as 5410 specified Each 4.00 $354.00 $1,416.00 $400.00 $1,600.00 Install traffic sign pole; standard; aluminum; 10'; "City Supplied"; complete as 5420 specified Each 1.00 $120.00 $120.00 $200.00 $200.00 Install trattic sign pole; standard; aluminum; 15'; "City Supplied"; complete as 5422 specified Each 4.00 $120.00 $480.00 $200.00 $800.00 Install WDOT Type 10 traffic signal poles; "City Supplied"; 5424 complete as specified Each 2.00 $2,500.00 $5,000.00 $2,000.00 $4,000.00 Install WDOT ype 13 traffic signal poles; "City Supplied"; 5426 complete as specified Each 2.00 $3,000.00 $6,000.00 $2,000.00 $4,000.00 1:\ En%i.6.B\E018 Ave Aw\P�ojiti_Infwm�0an\Conlran W. 18 14 BW Tab &3148 Page 38 of 40 8/31/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements 05894635) Owner. City of Oshkosh, WI Solicitor. City of Oshkosh, WI Bid Opening. 08/31/201810:00 AM CDT Wood Sewer & Excavating Inc. Carl Bowers & Sons Const Co. Inc. Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Install monotube arms; 30'; "City Supplied'; 5428 complete as specified Each 2.00 $2,200.00 $4,400.00 $2,000.00 $4,000.00 Install monotube arms; 45'; "City Supplied'; 5430 complete as specified Each 2.00 $2,800.00 $5,600.00 $2,000.00 $4,000.00 Install 3-section tr 'c signal head'; "City Supplied"; complete as 5434 specified Each 12.00 $460.00 $5,520.00 $200.00 $2,400.00 Inst 4-section tr 'c signal head; "City Supplied'; complete as 5436 specified Each 8.00 $500.00 $4,000.00 $300.00 $2,400.00 pe estrian signs head with countdown timer; "City Supplied'; 5438 complete as specified Each 7.00 $250.00 $1,750.00 $200.00 $1,400.00 Install pedestrian push button; "City Supplied'; 5440 complete as specified Each 7.00 $100.00 $700.00 $200.00 $1,400.00 Furnish and install Type 2 Base; complete 5502 as specified Each 16.00 $1,000.00 $16,000.00 $1,100.00 $17,600.00 Furnish and install Type 10 base; complete 5510 as specified Each 2.00 $8,000.00 $16,000.00 $8,500.00 $17,000.00 Furnish and install Type 13 base, complete 5512 as specified Each 2.00 $11,000.00 $22,000.00 $16,500.00 $33,000.00 Furr is and insta temporary traffic control/operations; 5999 complete as specified Lump Sum 1.00 $120,000.00 $120,000.00 $55,000.00 $55,000.00 Section 2: Alternate A (Awarded) $54,800.00 $52,935.00 Furnis ; in—stall; maintain; and remove stone tracking pad; A-2512 complete as specified Each 1.00 $2,900.00 $2,900.00 $1,800.00 $1,800.00 I . E- g\2m—sTxn4-a. 1w14( hk«h A�A,\P..:„.mm,m.e.mC.1..1imm�18-uaidr.hn31-18 Page 39 of 44) 9/4/2018 Contract 18-14 - Oshkosh Avenue Area Redevelopment Infrastructure Improvements (115894635) Owner. City of Oshkosh, WI Solicitor. City of Oshkosh, WI Bid Opening: 08/31/201810:00 AM CDT Wood Sewer & Excavating, Inc. Carl Bowers & Sons Const Co. Inc. Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension A-2514 Furnish; inst, maintain; and remove silt fence; complete as specified Linear Feet 350.00 $3.00 $1,050.00 $3.00 $1,050.00 A-2602 Install salvaged topsoil 6 depth; complete as specified Square Yards 675.00 $6.00 $4,050.00 $2.00 $1,350.00 A-2619 Furnish and install perennial rye grass; complete as specified Square Yards 675.00 $2.00 $1,350.00 A-2644 Fumis and irtst hydraulically -applied erosion control product; complete as specified Square Yards 675.00 $4.00 $2,700.00 A-2902 Strip and stockpile topsoil; complete as specified Square Yards 675.00 $4.00 $2,700.00 $1.00 $675.00 A-2932 Import clay material; complete as specified Cubic Yards 4,005.00 $10.00 $40,050.00 $12.00 $48,060.00 Section 3: Alternate B (Not Awarded) $40,050.00 $48,060.00 B-2932 Import clay material; complete as specified Cubic Yards 4,005.001 $10.00 $40,050.00 $12.00 $48,060.00 Bid Total: 1 1$3,952,937.40 $4,278,760.29 I .. �11­11 ron•Txnc�s..ie-iao kn n.<,aid r.n nai-ia Page 40 of 40 9/4/2018