HomeMy WebLinkAbout17. 18-482 SEPTEMBER 11, 2018 18-482 ORDINANCE
FIRST READING
(CARRIED 7-0 LOST LAID OVER WITHDRAWN )
PURPOSE: APPROVE CLOSURE OF 9TH STREET ROAD (WEST 9TH AVENUE)
FROM LINDEN OAKS DRIVE TO THE PROPOSED PAUL'S
PLACE
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
A GENERAL ORDINANCE OF THE CITY OF OSHKOSH AUTHORIZING A VARIANCE
TO SECTION 25-23 OF THE OSHKOSH MUNICIPAL CODE PERTAINING TO STREETS
TO REMAIN OPEN TO TRAFFIC DURING THE COURSE OF EXCAVATION WORK.
WHEREAS, the City of Oshkosh Municipal Code Section 25-23 requires a
passageway of not less than ten(10)feet in the travelled portion of the street to remain open
on various streets within the City of Oshkosh, including 91h Street Road; and
WHEREAS, the Developer of Pickart Estates subdivision, K&P Development, LLC,
has requested a variance from the terms of section 25-23 for the purposes of providing a safe
work area and reducing congestion to facilitate the connection of the proposed Pickart
Estates Subdivision, Phase I to the sanitary sewer main in 91h Street Road; and
WHEREAS, the timing of the closure is anticipated for a period not to exceed two (2)
consecutive weeks with an anticipated completion date no later than October 13, 2018.
NOW, THEREFORE the Common Council of the City of Oshkosh do ordain as
follows:
SECTION 1. That, Excel is hereby granted a variance from the provisions of Section
25-23 of the City of Oshkosh Municipal Code to close 91h Street Road for purposes of
providing a safe work area and reducing congestion as necessary to connect to sanitary
sewer utilties in 91h Street Road for a period not to exceed two (2) consecutive weeks subject
to the following conditions:
SEPTEMBER 11, 2018 18-482 ORDINANCE
FIRST READING CONT'D
A. Developer shall be permitted to close 91h Street Road pursuant to the terms
and conditions of this resolution.
B. Developer shall provide at least seven (7) day notice to the Department of
Public Works prior to any anticipated closure.
C. Developer shall provide all necessary and required signage for the closure
of the street and detour of traffic.
D. Developer shall work with the Department of Public Works to minimize the
effects of the street closure upon emergency services and the public.
E. Developer shall complete the work no later than October 13, 2018.
F. The Director of Public Works is hereby authorized to approve such closure,
approve such closure with conditions or take such other action as may be
necessary and appropriate in consultation with the Police and Fire Chiefs of
the City of Oshkosh to protect the health, safety and welfare of the citizens.
SECTION 2. This ordinance shall be in full force and effect from and after its
passage, publication and placement of the appropriate temporary signage indicating the
closure.
SECTION 3. Publication Notice. Please take notice that the City of Oshkosh enacted
ordinance #18-XXX APPROVE CLOSURE OF 9TH STREET ROAD (WEST 9TH AVENUE)
FROM LINDEN OAKS DRIVE TO THE PROPOSED PAUL'S PLACE (A GENERAL
ORDINANCE OF THE CITY OF OSHKOSH TO APPROVE CLOSURE OF 9TH STREET
ROAD (WEST 9TH AVENUE) FROM LINDEN OAKS DRIVE TO THE PROPOSED
PAUL'S PLACE) on September 11, 2018. The ordinance allows temporary closure of 91h
Street Road, for purposes of providing a safe work area and reducing congestion to allow
for sanitary sewer connections to be made in 91h Street Road for a period not to exceed two
(2) consecutive weeks. Construction shall be completed no later than October 13, 2018.
The full text of the ordinance may be obtained at the Office of the City Clerk, 215 Church
Avenue and through the City's website at www.ci.oshkosh.wi.us. Clerk's phone: 920-
236-5011.
City
o�
Oshkosh
MEMORANDUM
TO: Honorable Mayor and Members of the Common Council
FROM: Steven M. Gohde, Assistant Director of Public Works 5`_9
DATE: September 6, 2018
RE: Approve Closure of 91h Street Road (West 9th Avenue) from Linden Oaks Drive to
the Proposed Paul's Place
BACKGROUND
As part of the infrastructure needed to serve Pickart Estates, Phase 1, the sanitary sewer under 96h
Street Road (West 9th Avenue) needs to be extended to the west. The developer for this project,
K & P Development, LLC, has requested to close both lanes of traffic of 91h Street Road (West 9th
Avenue) from Linden Oaks Drive to the proposed Paul's Place for a period of two (2) weeks to
complete this work. Their request is attached.
A detour route will be required to be posted for the duration of the construction. Advanced
warning signs will be placed seven (7) days prior to the closure to warn drivers. The work is
anticipated to start September 241h, but may change due to weather and site conditions. A
previous request was approved under Ordinance No. 18-399. That Ordinance required the work
to be completed by August 31, 2018. Due to delays, the Contractor was not able to complete the
work by the date on the original request. Therefore, the developer has submitted a new request.
ANALYSIS
City Ordinance No. 25-23 requires 9th Street Road (West 9th Avenue) to remain open to traffic at
all times. The developer cited worker and traveling public safety concerns as the basis for the
closure request. Based on the location and depth of the sanitary sewer, construction under traffic
will be very difficult and would likely require a temporary roadway be constructed.
FISCAL IMPACT
There are no fiscal impacts to this ordinance.
1:\ Engineering \ 2018 CONTRACTS \ 18-17 Pickart Est \ Project Information\ Correspondence \ Memo \ 18- Page 1 Of 2
17 Memo for 9th St Rd (W 9th Ave) Closure_9-6-18.docx
RECOMMENDATIONS
I recommend approval of the request to close 9th Street Road (West 91h Avenue) from Linden Oaks
Drive to the proposed Paul's Place for a period of two (2) consecutive weeks with the following
conditions:
All work, including restoration, must be completed by October 13, 2018.
The developer shall post a detour route, approved by the Department of Public Works,
and post warning signs at least seven (7) days prior to the closure.
Approved:
Mark A. Rohloff
City Manager
SMG/tlt
I:\Engineering\2018 CONTRACTS\18-17 Pickart Est\ Project_lnformation\ Correspondence \Memo\ 18- Page 2 of 2
17 Memo for 9th St Rd (W 9th Ave) Closure_9-6-18.docx
EXCEL
ARCHITECTS • ENGINEERS • SURVEYORS
DATE: August 30, 2018
TO: Steven M. Gohde, P.E., Asst. Director Public Works/City Engineer, DPW
FROM: K & P Developement, LLC — Kevin Jaenke (920-279-0891)
RE: Pickart Subdivision Sanitary Sewer Main Extension
To facilitate connection of the proposed Pickart Estates Subdivision sanitary sewer main extension to
the existing public main in 91h Street Road, we find it will be necessary to temporarily close both lanes of
Stn Street Road. The reasons for this temporary closure are noted below:
The existing sanitary manhole to which the proposed main will connect to is located in the
center of 91h Street Road approximately 100 feet east of the intersection of 91h Street Road and
the proposed Paul's Place; said paved roadway is approximately 21 feet wide.
The proposed sanitary main extension is approximately 17 feet below the current 91h Street
Road centerline. Due to the size of the equipment needed to complete this construction and
the depth of the excavation, the entire roadway will need to be closed.
Duration of this phase of the project will be approximately two (2) weeks from initial pavement
saw cut through final pavement restoration as noted below:
o Day 1; set-up barricades and saw cut pavement.
o Day 2; begin excavation.
o Day 3-5; excavation and trench shoring.
o Day 6; core existing manhole.
o Day 7; install pipe, bedding, seal pipe connections.
o Day 8-9; backfill and compaction.
o Day 10; roadway restoration with hot -mix asphalt.
• DNR approval for this sanitary sewer extension was granted on July 6, 2018. Anticipated start
date of construction is September 24, 2018
• This second closure request is being submitted because the contractor was not able to complete
construction of the utilities during the previously stated two (2) week timeframe beginning
August 1.
• The owner has been in contact with Kobussen Bus Service to inform them of the possible
closure.
• A road closure/detour plan has been prepared and is attached.
We therefore respectfully request approval from the City of Oshkosh Common Council to allow the
temporary closing of both lanes of 9th Street Road to provide adequate area and safe working conditions
during this phase of the subdivision development project.
Please contact me if you require any additional information. Thank you.
www.invarion.com
Legend
North Arrow
® Work Area
A
Gaggle Maps
aIy
$aD1191 h..ch q
Pd Wi t zel Ave
11 DETOUR _..� DETOUR
O
l
ROAD CLOSED
O
LOCAL TRAFFIC ONLY O
Q
QN �,'i'iKisG VP
pp Q
000 6U� <Ne OWQ
mo OOo �O' 00 c<
1 U fLUQ pOW O
1 9 t A v e
00
goo O A
= o
o � o Waw
wW
o A0O� �¢ rc
N C"ao gle d o
M w g W
o ¢ o
o
o
Date: 8/21/2018 Author: Chris Duprey Project: 9th Ave. Closure &Detour
Comments:
Not to Scale. "9th Ave." placards to be att