Loading...
HomeMy WebLinkAbout36. 18-467 AUGUST 28, 2018 18-467 RESOLUTION CARRIED 5-0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE SPECIFIC IMPLEMENTATION PLAN FOR PARKING LOT EXPANSION; 1331 HIGH AVENUE INITIATED BY: RIVER VALLEY CHURCH, INC. PLAN COMMISSION RECOMMENDATION: Approved w/conditions WHEREAS, the Plan Commission finds that the General Development Plan and Specific Implementation Plan for the proposed planned development for a parking lot expansion at 1331 High Avenue, is consistent with the criteria established in Section 30- 387(6) of the Oshkosh Zoning Ordinance. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that a General Development Plan and Specific Implementation Plan for the planned development of a parking lot expansion at 1331 High Avenue, per the attached, is hereby approved with the following conditions: 1. Final site lighting plan shall meet all the minimum 0.4 foot candle for parking areas. 2. Northern most curb cut and the residential curb cut shall be remove and replaced with curb and gutter to City standards. 3. SSM to be allowed 72% impervious surface. 4. SSM to reduce the setback along High Avenue to 44". 5. SSM to reduce the rear setback to 76". 6. SSM to not provide curb and gutter for the new parking area. 7. An additional 100 landscaping points are required along the north property line near the intersection of Congress Ave. and High Ave. 8. An additional 50 landscaping points are required along the east property line adjacent to the existing building. 9. Final landscaping plan shall be approved by the Department of Community Development. TO: Honorable Mayor and Members of the Common Council FROM: Darryn Burich Director of Planning Services DATE: August 22, 2018 RE: Approve Specific Implementation Plan for Parking Lot Expansion; 1331 High Avenue (Plan Commission Recommends Approval) BACKGROUND The subject area is located at the southwest corner of Congress Avenue and High Avenue and consists of one parcel approximately 1.50 acres in size. The subject area is currently an existing church, associated surface parking and a single family home. The applicant also requests approval of a General Development Plan (GDP) and Specific Implementation Plan (SIP) to allow for a parking lot expansion. ANALYSIS The church wishes to remove the existing residential structure and expand their surface parking lot. The current 53 space parking area was constructed in 2003. The present parking lot does not have adequate capacity for the activities conducted by the church. The current code requirement for parking would be 91 spaces based on the size of the sanctuary space. The applicant wishes to reconfigure / construct an additional 40 spaces bringing the lot up to a total of 93 spaces. In order to maintain and matching the existing parking lot setbacks, the applicant is requesting to rezone the property to Institutional with Planned Development Overlay (I -PD) and seek Base Standard Modifications. FISCAL IMPACT None anticipated as the SIP will not require expansion of city services to service the expanded parking area. The subject property was previously tax exempt as a single family home and will remain tax exempt as a parking lot. RECOMMENDATION The Plan Commission recommended approval of the general development plan and specific implementation plan at its August 7, 2018 meeting. City Hall, 215 Church Avenue P.O. Box 1 130 Oshkosh, WI 54903-1130 920.236.5000 http://www.ci.oshkosh.wi.us Respectfully Submitted, �arryn Burich Director of Planning Services Approved: oe Mark A. Rohloff City Manager City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 920.236.5000 http://www.ci.oshkosh.wi.us ITEM: ZONE CHANGE FROM INSTITUTIONAL (I) TO INSTITUTIONAL WITH PLANNED DEVELOPMENT OVERLAY (I -PD) AND APPROVAL OF A GENERAL DEVELOPMENT PLAN AND SPECIFIC IMPLEMENTATION PLAN FOR PROPERTY LOCATED AT 1331 HIGH AVENUE Plan Commission meeting of August 7, 2018. GENERAL INFORMATION Applicant: Fisher and Associates LLC on behalf of the owner Property Owner: River Valley Church Inc. Action(s) Requested: The applicant requests a zone change from the existing Institutional (I) to Institutional with a Planned Development Overlay (I -PD). The applicant also requests approval of General Development Plan and Specific Implementation Plan to allow for a parking lot expansion. Applicable Ordinance Provisions: The Zoning Ordinance does not establish criteria relative to appropriateness of changing zoning from one classification to another but relies on the Comprehensive Plan and good planning principles. Planned Development standards are found in Section 30-387 of the Zoning Ordinance. Property Location and Type: The subject area is located at the southwest corner of Congress Avenue and High Avenue and consists of one parcel approximately 1.50 acres in size. The subject area is currently an existing church, associated surface parking and a single family home. The surrounding area consists of two family and multi -family uses to the south, institutional uses to the north and east and multi -family residential to the west. The 10 and 20 Year Comprehensive Land Use Plans both recommend public institutional for the subject area. Subject Site Existing Land Use zoning Existing church I Adjacent Land Use and Zoning Existing Uses Zoning° North —._._...._..._...-- South --......._.. East Institutional land use ..—.__...._—....... _........ �..---........___....—...._....._......—_...._........._.....----....._.....--.__.._.._._ Two and Multi -Family Residential _......_—._.._.....—._.._.__.._..............._....—_................--.._........._._...._..................._---......._.— Institutional land use I -PD __.._._......_... _ ... — —._._....__._...._..- MR -20 --_......... _..----...._...... — --- ... __........... _._- -_.... I-PD ..........._._._.._._...._.........__._......—....._..---...._...---.--...........__...---......_.....�__..__....._-.....---._...__._...—..........---_.__ West Multi -Family Residential .............._......... - ..... ---._.......... --- ..... _.... _ MR -20 Comprehensive Plan Land Use Recommendation Land Use 10 Year & 20 Year Land Use Recommendation Public Institutional ANALYSIS Use The proposed development consists of an existing church, associated surface parking lot and an existing residential structure. The church wishes to remove the existing residential structure and expand their surface parking lot. The church was originally constructed in 1952, with the current sanctuary being added in 1963. The current 53 space parking area was constructed in 2003. The present parking lot does not have adequate capacity for the activities conducted by the church. The current code requirement for parking would be 91 spaces based on the size of the sanctuary space. The applicant wishes to reconfigure / construct an additional 40 spaces bringing the lot up to a total of 93 spaces. In order to maintain & matching the existing parking lot setbacks the applicant is requesting to rezone the property to I -PD and seek Base Standard Modifications. Site Design/Access The current church parking lot has two driveway accesses from High Avenue and the residential structure has an additional driveway opening. The applicant is proposing to remove the northern most curb cut and the current residential curb cut. They would then construct a new southern driveway apron to access the parking lot. This would give the applicant two total access points for the parking lot. The removal of the northern most curb cut should improve the current traffic conditions at the site as it is presently closer to the intersection than the city would allow. The applicant is requesting a BSM to allow the total impervious surface to exceed the allowed 60%. With the additional parking area the applicant is requesting to be allowed 72% impervious surface. Staff would not traditionally support a BSM to allow the reduction in required green space, however in this instance staff sees the increased parking area as a benefit as it will reduce the current demand for on street parking in the surrounding residential area. The applicant is requesting two BSM for reduced setbacks. The applicant wishes to reduce the setback along High Avenue to 4'4" in order to match the setback of the existing parking lot setback. The applicant also wishes to reduce the rear yard setback to 76" in order to match the setback of the existing parking lot. Staff is in support of the BSM. The setback reduction along High Avenue should largely be mitigated by landscaping. The reduction of the rear yard setback will be mitigated with a 6' board on board fence to match the existing. It does not appear to staff that either of the reduced setbacks have had an adverse effect on the area and similarly matching those setback should not pose an issue. Finally, the applicant is requesting a Base Standard Modification to be allow to construct the new parking area without the required curb and gutter. The applicant wishes to match the exiting parking lot and use grading / catch basins to meet stormwater requirements. Staff is in support of the BSM but the applicant will need final approval of its stormwater management plan by the Department of Public Works. Staff would like to note that when the existing parking lot needs to be reconstructed it will be required to meet City standards for curb and gutter. In exchange for the reduction in setbacks, green space and curbing requirements staff is suggesting the applicant be required to place additional landscaping along the north and northeast side of the building. Additional landscaping in these areas should aid in the overall appearance of a gateway into the Center City. It is staff's opinion the applicant should be required to add 100 landscaping ITEM. Rezone, GDP/SIP 1311 High Ave points along the north property line and 50 landscaping points along the east side of the building. Staff recommends a condition be placed requiring final landscaping be approved by the Department of Community Development. Storm Water Management/Utilities Storm water management plans have been provided and are being reviewed by the Department of Public Works. The applicant has been in discussion with the Department of Public Works regarding storm water management for the area. Finalized storm water management plans will need to be submitted and approved as part of the Site Plan Review processes. Landscaping Paved Area Code requires 50 landscaping points per 10 parking stalls or 10,000 sq. ft. of paved area, equating to a required 170 paved area landscaping points for the new parking area. The plan indicates 172 points provided. The code further specifies 30% of all points will be devoted to medium or tall trees and 40% will be devoted to shrubs. All paved landscaping requirements are being met. Street Frontage Code requires 100 points per 100' of street frontage. The subject parcel has 150' of frontage along the new parking area. The plan indicates 152.1 points provided. All street frontage landscaping requirements are being met. Bufferyards The zoning ordinance would require a 0.1 opacity bufferyard for Institution land uses adjacent to multi -family residential zoned property. The applicant is proposing to match the existing a 6' wood fence along the west property line. The fence meets the bufferyard requirements. Along the south property line the applicant is proposing to provide 134 landscaping point to satisfy the bufferyard requirement. Signage No sign plans have been provided. Any future signage will be required to meet the standards for the Institutional (I) zoning district. Site Lighting A photometric plan has been provided by the applicant. The provided plan meets the City's requirements of no greater than 0.5 foot candle at the property lines, however the plan does fall short of meeting the City's minimum requirement of 0.4 foot candle for parking areas. Final approval of the lighting plan will occur during the Site Plan Review processes. FINDINGS/RECOMMENDATION/CONDITIONS In its review and recommendation to the Common Council on an application for a Planned Development district, staff recommends the Plan Commission make the following findings based on the criteria established by Chapter 30-387 (C)(6): (a) The proposed Planned Development project is consistent with the overall purpose and intent of this Chapter. ITEM. Rezone, GDP/SIP 1311 High Ave (b) The proposed Planned Development project is consistent with the City's Comprehensive Plan and other area plans. (It is the responsibility of the City to determine such consistency.) (c) The proposed Planned Development project would maintain the desired relationships between land uses, land use densities and intensities, and land use impacts in the environs of the subject site. (d) Adequate public infrastructure is or will be available to accommodate the range of uses being proposed for the Planned Development project, including but not limited to public sewer and water and public roads. (e) The proposed Planned Development project will incorporate appropriate and adequate buffers and transitions between areas of different land uses and development densities/intensities. (f) The proposed Planned Development project design does not detract from areas of natural beauty surrounding the site. (g) The proposed architecture and character of the proposed Planned Development project is compatible with adjacent/nearby development. (h) The proposed Planned Development project will positively contribute to and not detract from the physical appearance and functional arrangement of development in the area. (i) The proposed Planned Development project will produce significant benefits in terms of environmental design and significant alternative approaches to addressing development performance that relate to and more than compensate for any requested exceptions/base standard modifications variation of any standard or regulation of this Chapter. (j) For Planned Development projects that are proposed to be developed in phases, the applicant can provide a timeline for development and can demonstrate that the project would be successful even if all phases were not or could not be completed. Staff recommends approval of the zone change request and approval of the General Development Plan and Specific Implementation Plan, the findings listed above and the proposed following conditions: 1. Final site lighting plan shall meet all the minimum 0.4 foot candle for parking areas. 2. Northern most curb cut and the residential curb cut shall be remove and replaced with curb and gutter to City standards. 3. BSM to be allowed 72% impervious surface. 4. BSM to reduce the setback along High Avenue to 4'4". 5. BSM to reduce the rear setback to 76". 6. BSM to not provide curb and gutter for the new parking area. 7. An additional 100 landscaping points are required along the north property line near the intersection of Congress Ave. and High Ave. 8. An additional 50 landscaping points are required along the east property line adjacent to the existing building. 9. Final landscaping plan shall be approved by the Department of Community Development. The Plan Commission approved of the zone change request and approval of the General Development Plan and Specific Implementation Plan as requested with conditions. The following is the Plan Commissions discussion on this item. ITEM Rezone, GDP/SIP 1311 High Ave Mr. Lyons presented the item and reviewed the site and surrounding area. The proposed development consists of an existing church, associated surface parking lot and an existing residential structure. The church wishes to remove the existing residential structure and expand their surface parking lot. The current 53 space parking area was constructed in 2003. The present parking lot does not have adequate capacity for the activities conducted by the church. The current code requirement for parking would be 91 spaces based on the size of the sanctuary space. The applicant wishes to reconfigure / construct an additional 40 spaces bringing the lot up to a total of 93 spaces. In order to maintain & match the existing parking lot setbacks the applicant is requesting to rezone the property to I -PD and seek Base Standard Modifications. Mr. Borsuk inquired if the area along the apartments is transitional. Mr. Lyons stated there is a 6 foot high fence that runs along the west property line and will continue that fence along to the south. Mr. Borsuk asked what was proposed for stormwater management. Mr. Lyons stated the applicant should be able to address the stormwater. The applicant did not meet the 20,000 square foot threshold so there is not much that needs to be done. Mr. Bowen inquired if the additional 150 landscape points was only on the existing property. Mr. Lyons responded that the new property meets the landscaping requirements. The 150 landscape points is for the existing property only. Rick Fisher from Fisher & Associates stated the storm area on the site is less than 20,000 sq. ft. A catch basin is proposed for stormwater management in the new area that is directed to the existing storm sewer system. Mr. Borsuk stated he has concern that there is an increase in impervious surface which increases the stormwater runoff. Mr. Gohde stated because there was a house on the property, the increase to the impervious surface is not dramatic. Mr. Fisher stated the potential runoff will be directed to the storm sewer rather than to the adjacent neighbors like it does now. Mr. Borsuk questioned if the existing parking lot would need to be rebuilt, would it have to meet storm water standards. Mr. Gohde stated once the site triggers the 20,000 sq. ft. it would fall under the redevelopment standards and have to be treated for water quality at that time and the default will have some quantity control but a specific target would not have to be met. ITEM: Rezone, GDP/SIP 1311 High Ave Motion by Propp to approve a zone change from the existing Institutional (I) to Institutional with a Planned Development Overlay (I -PD) and approval of a general development plan and specific implementation plan for property located at 1331 High Avenue with the following conditions: 1. Final site lighting plan shall meet all the minimum 0.4 foot candle for parking areas. 2. Northern most curb cut and the residential curb cut shall be remove and replaced with curb and gutter to City standards. 3. BSM to be allowed 72% impervious surface. 4. BSM to reduce the setback along High Avenue to 4'4". 5. BSM to reduce the rear setback to 7'6". 6. BSM to not provide curb and gutter for the new parking area. 7. An additional 100 landscaping points are required along the north property line near the intersection of Congress Ave. and High Ave. 8. An additional 50 landscaping points are required along the east property line adjacent to the existing building. 9. Final landscaping plan shall be approved by the Department of Community Development. Seconded by Vajgrt. Motion carried 8-0. ITEM. Rezone, GDP/SIP 1311 High Ave 6 City of Oshkosh Community Development Department 215 Church Ave Oshkosh VVI 54903 July 1, 2015 Attention: Community Development Department RE: Rezoning application for a parking lot for River Valley Church 1331 High Ave, City of Oshkosh, Oshkosh, Wl To whom it may concern: The Church is requesting a rezoning to IDP to allow deviations from some of the current design standards. The church was originallyconstructed in 1952, with the current sanctuary being added in1963, and the current parking lot with 53 stalls being constructed in 2003.. The current parking lot does not have adequate capacity for the attendance of services and other weekly activities. There are gatherings and Sunday School before, during, and after Sunday services. The calculated number of parking stalls that are required is 91. The proposed parking lot should be expanded/reconfigured to have 93 spaces including 4 handicapped accessible spaces that will meet current ADA requirements. The church's goals with this project are: • Expand the parking to maximize the number of spaces available and to minimize street parking in the surrounding residential area. • Provide a new entry into the existing gathering space that incorporates a handicapped accessible entrance ramp and accessible parking. As part of the IPD; the proposed design will have the following deviations from the current zoning requirements: • The overall green space will be 28% vs the current 40% required • The corner lot side yard setback for the parking lot will be 4'-4" to match existing lot. • The rear yard setback will be reduced to 6'--4 to match existing. • A 6'-0" wood board -on -board fence will be installed in the rear yard to match existing fence rather than landscaping • The parking lot will be constructed without curb and gutter to match existing. There will be a catch basin installed in the new parking lot so that all of the water that falls on the pavement, drains to the storm sewer to avoid runoff to adjacent properties We thank you for considering this rezoning and site plan application. Sincerely, 7 Richard J. Fisher, A.I.A. Senior Project Architect FISHER & ASSOCIATES, LLC 9 E G Cedar 5t. Dc:rere WI 341 5 rh:920-532-9199 Cali: P2o-376-0007 Page 7 rb LQ (D AO ,I M tC •iwlG/ NTJH bb'Q rwgCRfY LPC cT--i'M 1.-1—.-tt11.— rjtrR +uo i oP - �nIR4D 1PJ®N.L DH11.�t9 NW }RT�IDC MtOLW LWANGM IIJI lR6D MPWR W.DORic •L' GP�Am NM 6uIrO Lo+p1M M�tfM C>�p0 wnR.w�D...s.�a.erom.wla+m pwlnDum. � kt- 3H"/'M= PLANTING DETAIL �� na.ST�•-- TF= PLANTING VtTAIL MpRDII Asphalt \ `+ LANDS, -APE REQUIREMENTS P v�p w n To tT gHgYVN I2} JAPANr'.,C TRy;y LILAC 10 • 20 PTS (AT 917CL'T) 40, BHRUB9 • 68 PPS - TOTAL BCLOYI • RbD (S) PPIT28R.1)iIPER • 25 PTS (� GOLOPIA!�C 9PIREA • 6.6 PM (7) GRAY DOGWOOD- 95 PTS. (b) M 411rAN= YCW • 90 P (I) USH BURNIN6 B • 93 PT`,. (b) 6OLDPLAHG 3PIRCA 33 •26A PTS (AT 2TR=) . 525 PTS .5KKUY-TOTAL BCLOW • LAb (4) JAPANM= Y[W • 20 IM (9) BURNING BU5H • 163 PT5 (b) 60w7mAmr BPIKr • I4D Pf5 (U BURNIN& BUSH • 93 PTS. (2) PPIT3'R-UNIPCR • 10 Pt' LANDSCAPE PLAN L O \) AP�RIGAN HORN3t:API • 41D I'll,(2 BU1tN1N6 DU.Ai •13_2 Pf9 (4)\\J\APAl4r= Yr" • 20 M.o. (D) OOLDPLAMC SPIRCA •26.4 PM LANDSCAPE PLAN L O REZONE.GDP.SIP PEPPLER PROPERTIES LLC HIGH & ASHLAND LLC 1331 HIGH AVE I10 BOX 3301 PO BOX 191 PC: 08-07-18 OSHKOSH WI 54903 OSHKOSH WI 54903 JUSTIN J/JACQUELINE F DLUGOLENSKI 1565 MARICOPA DR OSHKOSH WI 54904 J & J HOLDINGS OF WI LLC 1501 ARBORETUM DR OSHKOSH WI 54901 RANE INVESTMENTS LLC 230 01 -HO ST STE 200 OSHKOSH WI 54902 CITY OF OSHKOSH PO BOX 1130 OSHKOSH WI 54903 PAINE ART CENTER & GARDENS INC 1410 ALGOMA BLVD OSHKOSH WI 54901 FISHER AND ASSOCIATES LLC ATTN: RICHARD J FISHER 916. CEDAR STREET DE PERE WI 54116 BANE INVESTMENTS . LLC/GAUTREAU ADVENTURES 230 OHIO ST STE 200 OSHKOSH WI 54902 RIVER VALLEY CHURCH INC 1331 HIGH AVE OSHKOSH WI 54901 Page 9 -CC NGRESSAV--j v4 td 41 C 1613 .......... ......... .. ... ....... . EM Iry -NEMY ........ ... .... ....... .. nil- . ......... ... ...... r -NF -W -YO E M. M—rVIRE 5110 jw I in = 0.03 m! ffmp- - --------- M=;4.E-- 1 in 150 ft . . . . . . . . . . . . ..... or City of Oshkosh maps and data are intended to be used for general identification purposes onty, and Of the C41y of Oshkosh assumes no lability for the accuracy of the Wormation, Those using the Printing Date: 7/1712018or Information are responsible for verifying amufacy. For full dlsda�mer please go to vAsw.ci.oshkosh.wi.usiGiSdisdaimer Prepared by: City of Oshkosh, N Oshkosh L JAGIS'MamingVan Gommissbn Site Pfan).(.ap TeniplaMP]an Comfn'ssllon Site Plan Maplemplate.flud U k a t;a b Page 10 City of Oshkosh maps and data are intended to be used for general Identification purposes only, and the City of Oshkosh assumes no lability for the accuracy of the infornialJon. Those using the information are resWib!e for verify" amrracy. For full disclaimer please go to �w,vi,ci.oshkosh.vd.us/GIS&daimef Plan Map Tbmo.atekPlan CoMmisslon Site Pianhlap N 1 in 0.09 m! I in = 500 ft AfIN 'd Ciiv Printing Date: 7117/2018 Oshkosh Prepared by: City of Oshkosh, WI Page 12 User.