HomeMy WebLinkAbout28. 18-402 JULY 24, 2018 18-368 18-402 PENDING
JULY 10, 2018 RESOLUTION
(CARRIED LOST LAID OVER 7-0 WITHDRAWN )
UNTIL AUGUST 15, 2018 COUNCIL MEETING
PURPOSE: ACCEPT AND APPROVE WAIVER OF SPECIAL ASSESSMENT
NOTICES AND HEARING IN CONNECTION WITH
IMPROVEMENTS — PICKART ESTATES, PHASE I; NORTH 3300
BLOCK OF WEST 9TH AVENUE
INITIATED BY: PUBLIC WORKS DEPARTMENT
BE IT RESOLVED by the Common Council of the City of Oshkosh that the
Waiver of Special Assessment Notices and Hearing under Section 66.0703(7)(b) of the
Wisconsin Statutes, for public improvements and services, for the premises described
in the attached Waiver is accepted and approved.
WAIVER OF SPECIAL ASSESSMENT NOTICES AND
HEARING UNDER SECTION 66.0703, WISCONSIN STATUTES
The undersigned, owner of property benefited by the following improvements to be made by the
City of Oshkosh, Winnebago County, State of Wisconsin, to wit:
For public construction, surveying and inspection of concrete sidewalk and terrace tree
installation.
For private construction and public inspection and survey for sanitary sewer, storm sewer, water
main, laterals, grading & graveling, and concrete street pavement.
In consideration of the construction of said improvements by the City of Oshkosh, Wisconsin, I
hereby admit that such public improvement will benefit said property and consent to the levying
of special assessments against the premises under Section 66.0703 of the Wisconsin Statutes for
the cost of such improvements. In accordance with Section 66.0703 of the Wisconsin Statutes, I
hereby waive all special assessment notices and hearings required by Section 66.0703 of the
Wisconsin Statutes; and I further agree and admit that the benefit of my property from the
construction of such improvements is in proportion to the footage thereof.
Description of Premises
Pickart Estates Phase 1
Lots 1-24 and Outlot 1 and 4
Construction of Pauls Place, Marys Drive, Roberts Drive and Jimmys Drive
1. Sanitary Sewer & Laterals (Private Construction)
Estimated Construction Cost
6% Survey and Inspection
2. Water Main with Laterals (Private Construction)
Estimated Construction Cost
6% Survey and Inspection
3. Storm Sewer w/Laterals (Private Construction)
Estimated Construction Cost
6% Survey and Inspection
4. Grading, Graveling and Restoration (Private Construction)
Estimated Construction Cost
6% Survey and Inspection
$241,457.00 Private
$14,487.42 Payment
$266,759.00 Private
$16,005.54 Payment
I:\Engineering\Waiver ofSpecial AssessmenAWeiver of Special Assess • by SubdivlsionWickert Esules\Phase ITIckart Estates Phase I Wsivecdoc
$196,570.00 Private
$11,794.20 Payment
$78,299.46 Private
$4,697.97 Payment
Pickart Estates Phase 1
Page 2 of 4
5. Detention Basin Grading, Site Work and Restoration (Private Construction, Private
Survey/Inspection)
Estimated Construction Cost $225,116.30 Private
6% Survey and Inspection $0.00 Payment
6. Sidewalk (Public Construction) Assess
Assessment Rate = $25.00 per front foot of each lot
Includes 6% for Inspection and Surveying
Sunrise Estates
Lot #
Sidewalk Footage
Sidewalk Cost Estimate
1
215.35
$5,383.75
2
85.00
$2,125.00
3
85.00
$2,125.00
4
85.00
$2,125.00
5
212.48
$5,312.00
6
210.62
$5,265.50
7
80.21
$2,005.25
8
80.21
$2,005.25
9
80.21
$2,005.25
10
110.84
$2,771.00
11
105.95
$248.75
12
83.42
$2,085.50
13
84.58
$2,114.50
14
218.08
$5,452.00
15
83,00
$2,075.00
16
83.00
$2,075.00
17
83.00
$2,075.00
18
83.00
$2,075.00
19
83.00
$2,075.00
20
83.00
$2,075.00
21
90.00
$2,250.00
22
90.00
$2,250.00
23
90.00
$2,250.00
24
226.07
$5,651.75
7. Concrete Street Paving (Private) -Paving completed by July 31, 2021.
Native backfill to be used in utility trenches, utilities must be completed by
December 1, 2018. No paving until trenches have settled for three winter seasons.
1,950 Center Line Feet of Roadway at $220/lf = $429,000.00
Eleven (11) Handicapped Ramps at $600.00 each = $6,600.00
Sidewalk installation for Outlot 1 and 4 - 1051.23 ft at $25/ft= $26,280.75
Estimated Construction Cost $461,880.75 Private
6% Survey and Inspection $27,712.85 Payment
IAEngineerinS\Waiver of Special AssessmentkWaiver of Special Assess -by Subdivi0onTickan Esutes\Phasa I Tickart Estates Phme 1 Waivecdoc
Pickart Estates Phase 1
Page 3 of 4
S. Street Lighting
Lighting fixture/equipment acquisition $46,200.00
Estimated Construction Cost (Public) $4,900.00
Includes installing bases, poles and fixtures
6% Survey and Inspection $2,772.00
9. Terrace Trees (Public Construction) Assess
Assessment Rate = $300 per tree
Outlot 1 and 4 - 15 trees at $300 each= $4,500.00.
Each lot assessed $187.50 for Outlot 1 and.4 trees
10. Final Plat Monuments (Private)
Estimated Construction Cost
TAlinginttring\Waiver of Special Assess menAWeivcrofSpccial Assess -by SubdivisionTickart HstetesThase ITicked Estates Phase I Waiver.doc
Private
Payment
Payment
$3,000.00 Private
Estimated number
Tree Cost
Lot #
of terrace trees
Estimate
1
4.00
$1,387.50
2
2.00
$787.50
3
1.00
$487.50
4
1.00
$487.50
5
2.00
$787.50
6
5.00
$1,687.50
7
2.00
$787.50
8
2.00
$787.50
9
1.00
$487.50
10
3.00
$1,087.50
11
2.00
$787,50
12
2.00
$787.50
13
2.00
$787.50
14
3.00
$1,087.50
15
2.00
$787.50
16
2.00
$787.50
17
1.00
$487.50
18
2.00
$787.50
19
1.00
$487.50
20
2.00
$787.50
21
2.00
$787.50
10. Final Plat Monuments (Private)
Estimated Construction Cost
TAlinginttring\Waiver of Special Assess menAWeivcrofSpccial Assess -by SubdivisionTickart HstetesThase ITicked Estates Phase I Waiver.doc
Private
Payment
Payment
$3,000.00 Private
Pickart Estates Phase 1
Page 4 of 4
Summary of Cost Calculations
4 — Year Irrevocable Letter of Credit or Bond for Private Construction = $1,519,282.51
Cash Payment for Public Engineering, Inspection and Construction = $82,369.97
2 — Year Irrevocable Letter of Credit after Acceptance of Private Construction = $303,856.50
Signature of Owner:
Vmd, � QzjJ
Paul Pickart
Signature of Developer: K&P Developement
el, 4L '�
Kevin K. Jaenke, Managing Member
Date
Date
1AEngineering\Waiver of Special Assessment\Waiver of Specie) Amm -by SubdivisionTickan EstatesThme I TickartEstata Phue I Waiver.doc
Engr. and
Dev Agree Waiver Section
Private Cost
Inspection (Public) Public Construction
1
$241,457.00
$14,487.42
2
$266,759.00
$16,005.54
3
$196,570.00
$11,794.20
4
$78,299.46
$4,697.97
5
$225,116.30
$0.00
6
$0.00
$0.00
7
$461,880.75
$27,712.85
8
$46,200.00
$2,772.00 $4,900.00
9
$0.00
$0.00
10
$3,000.00
$0.00
Totals
$1,519,282.51
$77,469.97 $4,900.00
4 — Year Irrevocable Letter of Credit or Bond for Private Construction = $1,519,282.51
Cash Payment for Public Engineering, Inspection and Construction = $82,369.97
2 — Year Irrevocable Letter of Credit after Acceptance of Private Construction = $303,856.50
Signature of Owner:
Vmd, � QzjJ
Paul Pickart
Signature of Developer: K&P Developement
el, 4L '�
Kevin K. Jaenke, Managing Member
Date
Date
1AEngineering\Waiver of Special Assessment\Waiver of Specie) Amm -by SubdivisionTickan EstatesThme I TickartEstata Phue I Waiver.doc