HomeMy WebLinkAbout06. 18-380 JULY 24, 2018 18-380 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN ) PURPOSE: AWARD SID TO MINNESOTA ELEVATOR, INC. BADGER ELEVATOR FOR CITY HALL ELEVATOR MODERNIZATION FOR GENERAL SERVICES ($176,130.00) INITIATED BY: PURCHASING DIVISION WHEREAS, the City of Oshkosh has heretofore advertised for bids for City Hall elevator modernization for General Services; and WHEREAS,upon the opening and tabulation of bids, the following is the only bid: MINNESOTA ELEVATOR, INC BADGER ELEVATOR N50W13740 Overview Drive, Suite C Menominee Falls, WI 53051 Total Bid: $176,130.00 WHEREAS, this bid meets the minimum specifications and staff has reviewed the bid and recommends its acceptance. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 0323-0130-7214-06811 Property/Equipment Fund - Building TO: Honorable Mayor and Members of the Common Council FROM: Jon G. Urben, General Services Manager DATE: July 16, 2018 RE: Award Bid to Minnesota Elevator, Inc. Badger Elevator for City Hall Elevator Modernization for General Services ($176,130.00) BACKGROUND In the 2018 CIP the Common Council allocated $225,000.00 for modernization updates of the City Hall elevator. The current elevator is a 1979 OTIS electric -geared traction elevator that is 39 years old. The average service life for a traction elevator is between 25-35 years. The current elevator is operating properly, but replacement parts are becoming increasingly difficult to find and any serious repairs may result in the elevator being out of commission for extended periods of time. This modernization project will update the elevator to current code requirements and will also include new mechanical and equipment components, electrical and interior cab controls, wall finishes and lighting. The City engaged Performance Elevator Consulting (PEC) for engineering and design services for this project. ANALYSIS Working with PEC and Facilities Maintenance staff, Purchasing prepared bid specifications for this project. The bid was advertised in the local newspaper and posted on Onvia DemandStar. Three contractors attended the pre-bid meeting. Bids were due June 28, 2018. The bid tab is attached. Based on the bid review, it was the consensus of PEC and City staff that the sole bid received from our current elevator service provider met all the minimum bid requirements. Unfortunately this project will require the current elevator to be out of service for this modernization for approximately six weeks beginning Wednesday, November 15, 2018 through the last week of December. Staff is exploring establishing a reception area on the first floor of City Hall during this project to help direct citizen inquiries to departments on 2nd-4�h floors, should they choose to not utilize the stairs to these areas. In addition, staff is also reviewing alternate meeting room location sites for any City Hall public meetings during this project. Staff will communicate updates as the installation date nears. FISCAL IMPACT The total fiscal impact of this bid is $176,130.00. With the inclusion PEC's design fees of $14,551.00, the total fiscal impact to date for this project is $190,681.00. The 2018 CIP allocated $225,000.00 for this project. This project will be charged to A/N# 0323-0130-7214-06811. The remaining funds will be used City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 http://www.ci.oshkosh.wi.us for the electrical and life safety scopes of work necessary to complete the project. RECOMMENDATION Purchasing recommends the Common Council award this bid to Minnesota Elevator, Inc. Badger Elevator. Respectfully Submitted, Approved: Jon G. Urben, General Services Manager Mark A. Rohloff, City Manager ELEVATOR MODERNIZATION CITY OF OSHKOSH CITY HALL BIDS DUE JUNE 28, 2018 NAMES OF BIDDERS I BID I BID BOND Minnesota Elevator, Inc. $176,130.00 LOPF X Badger Elevator N50W13740 Overview Drive Suite C Menominee Falls, WI 53051