HomeMy WebLinkAboutVinton Construction Change Order 17-010
132M
City
of�
Oshkosh
June 21, 2018
Mr. Ray Raboine
Vinton Construction Company
PO Box 1987
Manitowoc, WI 54221-1987
RE: Change Order No. 1(Final)
Contract 17-01
Dear Mr. Raboine:
Enclosed is an executed copy of Change Order No. 1 (Final) between the City of Oshkosh and
Vinton Construction Company regarding the abovementioned project.
If you have any questions, please call our office at (920)236-5065.
Sincerely,
mes Rabe, P.E., CPESC
'ro-
Director of Public Works
JER/tlt
Enclosure: Change Order No. 1 (Final)
cc: Pam Ubrig, City Clerk (w/original)
Jennifer Messerschmidt, Interim Assistant Finance Director (w/copy)
File (w/original)
I:\Engineering\2017 CONTRACTS\17-01 FS 16 Prkng Lot\ Project_Information\Contract Info\Change
Orders\17-01 Executed CO #1 Ltr_6-21-18.docx
Page 1 of 1
City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 http://www.ci.oshkosh.wi.us
TO: VINTON CONSTRUCTION CO.
P. O. BOX 1987
MANITOWOC, WI 54221-1987
CHANGE ORDER #1 (2nd REVISED FINAL)
DATE: APRIL 9, 2018
Your present contract with the City of Oshkosh, Contract No. 17-01, awarded August 8, 2017, is hereby
amended and changed as follows:
NET INCREASE TO: SECTIONS A & B $22,9.46.69
NET DECREASE TO: SECTIONS A & B ($17,669.38)
NET INCREASE TO CONTRACT $5,277.31
TOTALS
BID TOTAL $319,029.48 $319,029.48
CO #1 $5,277.31 $5,277.31
CONTRACT TOTAL $324,306.79 $324,306.79
CITY OF OSHKOSH
BY:
City Ma ager
/45,
City Clerk
Approved and accepted:
-001
tractor
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the
within Change Order.
Co`mptrO ef'8 • ,
Approved a t form:
City Attorne
CONTRACT 17-01 CHANGE ORDER #1 (2ND REVISED FINAL)
SECTION A
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRA T PRI E
CONTRACTPRICE
Removing pavement;
Square
A-1100
complete as specified
Yards
2,210.00
2,190.21
-19.79
$2.55
($50.46
Removing concrete and
asphalt sidewalk and
driveway; complete as
Square
A-1120
specified
Feet
150.00
1,196.64
1046.64
$1.00
$1,046.64
Heavy biaxial geogrid;
Square
A-1231
complete as specified
Feet
435.00
76.34
-358.66
$1.10
($394.53)
Geotextile fabric; complete
Square
A-1232
las specified
Yards
550.00
665.47
115.47
$4.90
$565.80
3/4" clear stone storage
A-1341
gallery; complete as specified
Tons
335.00
791.95
456.95
$15.29
$6,986.77
Drilled dowel bars; 1 1/4";
A-1354
complete as specified
Each
34.00
23.00
-11.00
$20.00
($220.00)
Adjust manholes and inlets;
A-1360
complete as specified
Each
3.00
3.00
$400.00
12" curb and gutter; 6"; with
18" pan section; 8"; complete
Linear
A-1445
as specified
Feet
400.00
401.40
1.40
$37.30
$52.22
4" concrete sidewalk with 3"
CABC and grading; complete
Square
A-1500
as specified
Feet
270.00
201.60
-68.40
$6.25
($427.50)
8" concrete sidewalk/
driveway/ramp with 3" CABC
and grading; complete as
Square
A-1520
specified
Feet
2,040.00
2,019.28
-20.72
$7.60
($157.47)
Drilled No. 4 sidewalk tie bars
- deformed; epoxy -coated;
A-1560
complete as specified
Each
8.00
12.00
4.00
$15.00
$60.00
Sawing existing pavement;
Linear
A-1700
complete as specified
Feet
20.00
15.00
-5.00
$5.00
$25.00
Tack coat; complete as
A-1900
specified
Gallons
139.30
100.00
-39.30
$5.56
($218.51
10" CABC and grading;
Square
A-1905
complete as specified
Yards
1,990.00
1,906.19
-83.81
$32.01
($2,682.76
Permeable articulating
concrete block; complete as
Square
A-1979
specified
Yards
76.00
76.34
0.34
$142.50
$48.45
Furnish and install fence;
Linear
A-1980
complete as specified
Feet
224.00
226.00
2.00
$50.65
$101.30
Furnish and install 8" storm
Linear
A-2001
sewer; complete as specified
Feet
130.00
125.90
-4.10
$41.00
$168.10
Furnish and install 12" storm
Linear
A-2003
sewer; complete as specified
Feet
65.00
202.20
137.20
$58.00
$7,957.60
Furnish and install 18" storm
Linear
A-2009
sewer; complete as specified
Feet
130.00
0.00
-130.00
$69.30
$9,009.00
Furnish and install 6" storm
sewer underdrain; complete
Linear
A-2188
as specified
Feet
90.00
88.10
-1.90
$17.20
$32.68
Furnish and install standard
storm sewer manhole (4'
diameter); complete as
Vertical
A-2201
specified
Feet
3.00
3.09
0.09
$477.00
$42.93
Furnish and install standard
storm sewer inlet manhole (4'
diameter); complete as
Vertical
A-2213
specified
Feet
7.50
7.45
-0.05
$557.00
$27.85
Page 1 of 3
CONTRACT 17-01 CHANGE ORDER #1 (2ND REVISED FINAL)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
Furnish and install 30"
diameter storm sewer
manhole; complete as
Vertical
A-2233
specified
Feet
2.25
1.83
-0.42
$528.00
$221.77
Furnish and install trench
drain inlet; complete as
A-2240
specified
Each
1.00
1.00
$18,355.00
Furnish and install storm
sewer cleanout; complete as
A-2241
specified
Each
1.00
1.00
1
$400.00
Furnish; install; maintain; and
remove Type D modified inlet
protection; complete as
A-2508
specified
Each
15.00
14.00
-1.00
$70.00
$70.00
Sediment removal - Type D
modified inlet protection;
A-2510
complete as specified
Each
10.00
0.00
-10.00
$5.00
$50.00
Furnish; install; maintain; and
remove stone tracking pad;
A-2512
complete as specified
Each
1.00
0.00
-1.00
$1,248.50
$1,248.50
Furnish; install; maintain; and
remove silt fence; complete
Linear
A-2514
as specified
Feet
1 620.00
606.00
-14.00
$3.00
1
($42.00
Furnish; install; maintain; and
remove stone bag; complete
A-2516
as specified
Each
15.00
0.00
-15.00
$10.00
$150.00
Furnish; install; maintain; and
remove 12" diameter
sediment logs; complete as
Linear
A-2518
specified
Feet
10.00
0.00
-10.00
$10.00
$100.00
Furnish and install topsoil 6"
Square
A-2600
depth; complete as specified
Yards
750.00
1,441.33
691.33
$5.00
$3,456.65
Furnish and install turf grass;
Square
A-2620
complete as specified
Yards
750.00
1,441.33
691.33
$0.50
$345.67
Furnish and install
hydraulically -applied erosion
control product; complete as
Square
A-2644
specified
Yards
750.00
1,441.33
691.33
$2.00
$1,382.66
Furnish and install river rock
landscaping stone; complete
Square
A-2654
as specified
Yards
40.00
40.00
$11.25
Connect to existing storm
sewer main; complete as
A-2850
specified
Each
1.00
1.00
$475.00
Connect to existing storm
sewer inlet; complete as
A-2858
specified
Each
1.00
1.00
$475.00
Storm sewer utility line
opening (ULO); complete as
A-2914
specified
Each
1.00
0.00
-1.00
$500.00
$500.00
General excavation;
Lump
A-2930
complete as specified
Sum
1.00
1.00
$19,348.92
Relocate existing hydrant;
A-4501
complete as specified
Each
1.00
1.00
$1,500.00
SECTION A - (BID ITEMS A-1100 - A-4501) - SUBTOTAL $22,046.69 ($15,796.13)
NET INCREASE TO SECTION A $6,250.56
Page 2 of 3
CONTRACT 17-01 CHANGE ORDER #1 (2ND REVISED FINAL)
SECTION B
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
NUMBER
Furnish and install hydrant
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
Unclassified excavation;
Cubic
B-1200
complete as specified
Yards
550.00
550.00
1.00
$15.39
$900.00
Sawing existing pavement;
Linear
B-1700
complete as specified
Feet
1,700.00
1,630.50
-69.50
$1.50
$104.25
Base aggregate dense; 1-
B-1801
1/4"; complete as specified
Tons
925.00
925.00
$10.78
Tack coat; complete as
B-1900
specified
Gallons
300.00
125.00
-175.00
$5.56
($973.00
HMA Pavement LT; complete
B-1901
as specified
Tons
585.00
576.12
-8.88
$89.64
$796.00
HMA cold weather paving;
B-1903
complete as specified
Tons
50.00
50.00
$94.44
Asphaltic pavement milling;
Square
B-1950
complete as specified
Yards
4,250.00
4,250.00
$3.13
Prepare foundation for
asphaltic paving; complete as
Lump
B-1960
Ispecified
Sum
1.00
1.00
$12,928.00
SECTION B - (BID ITEMS B-1200 - B-1960) - SUBTOTAL
NET DECREASE TO SECTION B
ADDITIONAL WORK REQUIRED: CO #1
$0.00 ($1,873.25)
($1,873.25)
ITEM
NUMBER
DESCRIPTION
UNIT
BID
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRI E
DECREASE IN
CONTRACT PRICE
Furnish and install hydrant
extension; complete as
Al -4999
specified
Each
0.00
1.00
1.00
$900.00
$900.00
ADDITIONAL WORK: CO #1 (ITEM Al -4999) - SUBTOTAL
NET INCREASE TO: SECTIONS A & B
$900.00 $0.00
$5,277.31
NET INCREASE TO SECTIONS A & B
$22,946.69
NET DECREASE TO SECTIONS A & B
($17,669.38)
NET INCREASE TO CONTRACT:
$5,277.31
Page 3 of 3