HomeMy WebLinkAboutVinton Construction Change Order 17-010 132M City of� Oshkosh June 21, 2018 Mr. Ray Raboine Vinton Construction Company PO Box 1987 Manitowoc, WI 54221-1987 RE: Change Order No. 1(Final) Contract 17-01 Dear Mr. Raboine: Enclosed is an executed copy of Change Order No. 1 (Final) between the City of Oshkosh and Vinton Construction Company regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, mes Rabe, P.E., CPESC 'ro- Director of Public Works JER/tlt Enclosure: Change Order No. 1 (Final) cc: Pam Ubrig, City Clerk (w/original) Jennifer Messerschmidt, Interim Assistant Finance Director (w/copy) File (w/original) I:\Engineering\2017 CONTRACTS\17-01 FS 16 Prkng Lot\ Project_Information\Contract Info\Change Orders\17-01 Executed CO #1 Ltr_6-21-18.docx Page 1 of 1 City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 http://www.ci.oshkosh.wi.us TO: VINTON CONSTRUCTION CO. P. O. BOX 1987 MANITOWOC, WI 54221-1987 CHANGE ORDER #1 (2nd REVISED FINAL) DATE: APRIL 9, 2018 Your present contract with the City of Oshkosh, Contract No. 17-01, awarded August 8, 2017, is hereby amended and changed as follows: NET INCREASE TO: SECTIONS A & B $22,9.46.69 NET DECREASE TO: SECTIONS A & B ($17,669.38) NET INCREASE TO CONTRACT $5,277.31 TOTALS BID TOTAL $319,029.48 $319,029.48 CO #1 $5,277.31 $5,277.31 CONTRACT TOTAL $324,306.79 $324,306.79 CITY OF OSHKOSH BY: City Ma ager /45, City Clerk Approved and accepted: -001 tractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Co`mptrO ef'8 • , Approved a t form: City Attorne CONTRACT 17-01 CHANGE ORDER #1 (2ND REVISED FINAL) SECTION A ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRA T PRI E CONTRACTPRICE Removing pavement; Square A-1100 complete as specified Yards 2,210.00 2,190.21 -19.79 $2.55 ($50.46 Removing concrete and asphalt sidewalk and driveway; complete as Square A-1120 specified Feet 150.00 1,196.64 1046.64 $1.00 $1,046.64 Heavy biaxial geogrid; Square A-1231 complete as specified Feet 435.00 76.34 -358.66 $1.10 ($394.53) Geotextile fabric; complete Square A-1232 las specified Yards 550.00 665.47 115.47 $4.90 $565.80 3/4" clear stone storage A-1341 gallery; complete as specified Tons 335.00 791.95 456.95 $15.29 $6,986.77 Drilled dowel bars; 1 1/4"; A-1354 complete as specified Each 34.00 23.00 -11.00 $20.00 ($220.00) Adjust manholes and inlets; A-1360 complete as specified Each 3.00 3.00 $400.00 12" curb and gutter; 6"; with 18" pan section; 8"; complete Linear A-1445 as specified Feet 400.00 401.40 1.40 $37.30 $52.22 4" concrete sidewalk with 3" CABC and grading; complete Square A-1500 as specified Feet 270.00 201.60 -68.40 $6.25 ($427.50) 8" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as Square A-1520 specified Feet 2,040.00 2,019.28 -20.72 $7.60 ($157.47) Drilled No. 4 sidewalk tie bars - deformed; epoxy -coated; A-1560 complete as specified Each 8.00 12.00 4.00 $15.00 $60.00 Sawing existing pavement; Linear A-1700 complete as specified Feet 20.00 15.00 -5.00 $5.00 $25.00 Tack coat; complete as A-1900 specified Gallons 139.30 100.00 -39.30 $5.56 ($218.51 10" CABC and grading; Square A-1905 complete as specified Yards 1,990.00 1,906.19 -83.81 $32.01 ($2,682.76 Permeable articulating concrete block; complete as Square A-1979 specified Yards 76.00 76.34 0.34 $142.50 $48.45 Furnish and install fence; Linear A-1980 complete as specified Feet 224.00 226.00 2.00 $50.65 $101.30 Furnish and install 8" storm Linear A-2001 sewer; complete as specified Feet 130.00 125.90 -4.10 $41.00 $168.10 Furnish and install 12" storm Linear A-2003 sewer; complete as specified Feet 65.00 202.20 137.20 $58.00 $7,957.60 Furnish and install 18" storm Linear A-2009 sewer; complete as specified Feet 130.00 0.00 -130.00 $69.30 $9,009.00 Furnish and install 6" storm sewer underdrain; complete Linear A-2188 as specified Feet 90.00 88.10 -1.90 $17.20 $32.68 Furnish and install standard storm sewer manhole (4' diameter); complete as Vertical A-2201 specified Feet 3.00 3.09 0.09 $477.00 $42.93 Furnish and install standard storm sewer inlet manhole (4' diameter); complete as Vertical A-2213 specified Feet 7.50 7.45 -0.05 $557.00 $27.85 Page 1 of 3 CONTRACT 17-01 CHANGE ORDER #1 (2ND REVISED FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install 30" diameter storm sewer manhole; complete as Vertical A-2233 specified Feet 2.25 1.83 -0.42 $528.00 $221.77 Furnish and install trench drain inlet; complete as A-2240 specified Each 1.00 1.00 $18,355.00 Furnish and install storm sewer cleanout; complete as A-2241 specified Each 1.00 1.00 1 $400.00 Furnish; install; maintain; and remove Type D modified inlet protection; complete as A-2508 specified Each 15.00 14.00 -1.00 $70.00 $70.00 Sediment removal - Type D modified inlet protection; A-2510 complete as specified Each 10.00 0.00 -10.00 $5.00 $50.00 Furnish; install; maintain; and remove stone tracking pad; A-2512 complete as specified Each 1.00 0.00 -1.00 $1,248.50 $1,248.50 Furnish; install; maintain; and remove silt fence; complete Linear A-2514 as specified Feet 1 620.00 606.00 -14.00 $3.00 1 ($42.00 Furnish; install; maintain; and remove stone bag; complete A-2516 as specified Each 15.00 0.00 -15.00 $10.00 $150.00 Furnish; install; maintain; and remove 12" diameter sediment logs; complete as Linear A-2518 specified Feet 10.00 0.00 -10.00 $10.00 $100.00 Furnish and install topsoil 6" Square A-2600 depth; complete as specified Yards 750.00 1,441.33 691.33 $5.00 $3,456.65 Furnish and install turf grass; Square A-2620 complete as specified Yards 750.00 1,441.33 691.33 $0.50 $345.67 Furnish and install hydraulically -applied erosion control product; complete as Square A-2644 specified Yards 750.00 1,441.33 691.33 $2.00 $1,382.66 Furnish and install river rock landscaping stone; complete Square A-2654 as specified Yards 40.00 40.00 $11.25 Connect to existing storm sewer main; complete as A-2850 specified Each 1.00 1.00 $475.00 Connect to existing storm sewer inlet; complete as A-2858 specified Each 1.00 1.00 $475.00 Storm sewer utility line opening (ULO); complete as A-2914 specified Each 1.00 0.00 -1.00 $500.00 $500.00 General excavation; Lump A-2930 complete as specified Sum 1.00 1.00 $19,348.92 Relocate existing hydrant; A-4501 complete as specified Each 1.00 1.00 $1,500.00 SECTION A - (BID ITEMS A-1100 - A-4501) - SUBTOTAL $22,046.69 ($15,796.13) NET INCREASE TO SECTION A $6,250.56 Page 2 of 3 CONTRACT 17-01 CHANGE ORDER #1 (2ND REVISED FINAL) SECTION B ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER Furnish and install hydrant QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Unclassified excavation; Cubic B-1200 complete as specified Yards 550.00 550.00 1.00 $15.39 $900.00 Sawing existing pavement; Linear B-1700 complete as specified Feet 1,700.00 1,630.50 -69.50 $1.50 $104.25 Base aggregate dense; 1- B-1801 1/4"; complete as specified Tons 925.00 925.00 $10.78 Tack coat; complete as B-1900 specified Gallons 300.00 125.00 -175.00 $5.56 ($973.00 HMA Pavement LT; complete B-1901 as specified Tons 585.00 576.12 -8.88 $89.64 $796.00 HMA cold weather paving; B-1903 complete as specified Tons 50.00 50.00 $94.44 Asphaltic pavement milling; Square B-1950 complete as specified Yards 4,250.00 4,250.00 $3.13 Prepare foundation for asphaltic paving; complete as Lump B-1960 Ispecified Sum 1.00 1.00 $12,928.00 SECTION B - (BID ITEMS B-1200 - B-1960) - SUBTOTAL NET DECREASE TO SECTION B ADDITIONAL WORK REQUIRED: CO #1 $0.00 ($1,873.25) ($1,873.25) ITEM NUMBER DESCRIPTION UNIT BID QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRI E DECREASE IN CONTRACT PRICE Furnish and install hydrant extension; complete as Al -4999 specified Each 0.00 1.00 1.00 $900.00 $900.00 ADDITIONAL WORK: CO #1 (ITEM Al -4999) - SUBTOTAL NET INCREASE TO: SECTIONS A & B $900.00 $0.00 $5,277.31 NET INCREASE TO SECTIONS A & B $22,946.69 NET DECREASE TO SECTIONS A & B ($17,669.38) NET INCREASE TO CONTRACT: $5,277.31 Page 3 of 3