HomeMy WebLinkAbout09. 18-313 JUNE 12, 2018 18-313 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE CHANGE ORDER NO. 1 FOR PUBLIC WORKS CONTRACT NO. 17-01 PARKING LOT CONSTRUCTION (+$5,277.31) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: VINTON CONSTRUCTION COMPANY, INC. PO Box 1987 Manitowoc, WI 54221-1987 Net Increase to contract: $5,277.31 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 0323-1717-7216-06702 Property Improvement Fund - Land Improvement City of� Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works c�I DATE: June 7, 2018 RE: Approve Change Order No. 1 for Public Works Contract No. 17-01 Parking Lot Construction Vinton Construction Company, Inc. (+$5,277.31) BACKGROUND Change Order No. 1 for Contract 17-01 is scheduled for consideration by the Common Council at the June 12, 2018 meeting. The contract was originally awarded to Vinton Construction Company, Inc. in August of 2017. ANALYSIS Following is a summary of the significant changes to each section of the CIP: • Fire Station 16 Property Improvements o An existing hydrant on site was planned to be relocated, but it was not anticipated that an extension would be required and one had to be added. o Unexpected utility conflicts resulted in the need to raise the elevation of the storm sewer, leading to a reduced subsurface storage area. In order to still meet the site's storm water requirements, the stone gallery area had to be expanded. o Topsoil restoration areas ended up slightly larger than planned to allow for additional laydown areas for the Contractor. The space originally provided was insufficient for their equipment storage during construction. FISCAL IMPACT Contract Section Change Order Amount New Contract Total CIP Budget Amount Property Improvements $5,277.31 $324,306.79 $363,500.00 Total $5,277.31 $324,306.79 $363,500.00 Adequate funds are available in the Property Improvements section of the 2017 Capital Improvement Budget. RECOMMENDATIONS I recommend approval of Change Order No. 1 to Contact No. 17-01 in the amount of +$5,277.31 to Vinton Construction Company, Inc. Approved: Mark A. Rohloff City Manager 1:\Engineering\2017 CONTRACTS\17-01 FS16Prkng Page 1 Of 1 Lot \ Project_Information \ Correspondence \ Memo \ 17-01 Memo for CO #1_6-7-18.docx TO: VINTON CONSTRUCTION CO. P. O. BOX 1987 MANITOWOC, WI 54221-1987 CHANGE ORDER #1 (2"d REVISED FINAL) DATE: APRIL 9, 2018 Your present contract with the City of Oshkosh, Contract No. 17-01, awarded August 8, 2017, is hereby amended and changed as follows: NET INCREASE TO: SECTIONS A & B $22,946.69 NET DECREASE TO: SECTIONS A & B ($17,669.38) NET INCREASE TO CONTRACT $5,277.31 TOTALS BID TOTAL $319,029.48 $319,029.48 CO #1 $5,277.31 $5,277.31 CONTRACT TOTAL $324,306.79 $324,306.79 CITY OF OSHKOSH BY: City Manager City Clerk Approved and accepted: �ntracr I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT 17-01 CHANGE ORDER #1 (2ND REVISED FINAL) SECTION A ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Removing pavement; Square A-1100 complete as specified Yards 2,210.00 2,190.21 -19.79 $2.55 ($50.46) Removing concrete and asphalt sidewalk and driveway; complete as Square A-1120 specified Feet 150.00 1,196.64 1046.64 $1.00 $1,046.64 Heavy biaxial geogrid; Square A-1231 complete as specified Feet 435.00 76.34 -358.66 $1.10 ($394.53) Geotextile fabric; complete Square A-1232 as specified Yards 550.00 665.47 115.47 $4.90 $565.80 3/4" clear stone storage A-1341 gallery; complete as specified Tons 335.00 791.95 456.95 $15.29 $6,986.77 Drilled dowel bars; 1 1/4"; A-1354 complete as specified Each 34.00 23.00 -11.00 $20.00 ($220.00) Adjust manholes and inlets; A-1360 complete as specified Each 3.00 3.00 $400.00 12" curb and gutter; 6"; with 18" pan section; 8"; complete Linear A-1445 as specified Feet 400.00 401.40 1.40 $37.30 $52.22 4" concrete sidewalk with 3" CABC and grading; complete Square A-1500 as specified Feet 270.00 201.60 -68.40 $6.25 ($427.50) 8" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as Square A-1520 specified Feet 2,040.00 2,019.28 -20.72 $7.60 ($157.47) Drilled No. 4 sidewalk tie bars - deformed; epoxy -coated; A-1560 complete as specified Each 8.00 12.00 4.00 $15.00 $60.00 Sawing existing pavement; Linear A-1700 complete as specified Feet 20.00 15.00 -5.00 $5.00 ($25.00) Tack coat; complete as A-1900 specified Gallons 139.30 100.00 -39.30 $5.56 ($218.51) 10" CABC and grading; Square A-1905 complete as specified Yards 1,990.00 1,906.19 -83.81 $32.01 ($2,682.76) Permeable articulating concrete block; complete as Square A-1979 specified Yards 76.00 76.34 0.34 $142.50 $48.45 Furnish and install fence; Linear A-1980 complete as specified Feet 224.00 226.00 2.00 $50.65 $101.30 Furnish and install 8" storm Linear A-2001 sewer; complete as specified Feet 130.00 125.90 -4.10 $41.00 $168.10 Furnish and install 12" storm Linear A-2003 sewer; complete as specified Feet 65.00 202.20 137.20 $58.00 $7,957.60 Furnish and install 18" storm Linear A-2009 sewer; complete as specified Feet 130.00 0.00 -130.00 $69.30 $9,009.00 Furnish and install 6" storm sewer underdrain; complete Linear A-2188 as specified Feet 90.00 88.10 -1.90 $17.20 $32.68 Furnish and install standard storm sewer manhole (4' diameter); complete as Vertical A-2201 specified Feet 3.00 3.09 0.09 $477.00 $42.93 Furnish and install standard storm sewer inlet manhole (4' diameter); complete as Vertical A-2213 specified Feet 7.50 7.45 -0.05 $557.00 ($27.85) Page 1 of 3 CONTRACT 17-01 CHANGE ORDER #1 (2ND REVISED FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install 30" diameter storm sewer manhole; complete as Vertical A-2233 specified Feet 2.25 1.83 -0.42 $528.00 ($221.77) Furnish and install trench drain inlet; complete as A-2240 specified Each 1.00 1.00 $18,355.00 Furnish and install storm sewer cleanout; complete as A-2241 specified Each 1.00 1.00 $400.00 Furnish; install; maintain; and remove Type D modified inlet protection; complete as A-2508 specified Each 15.00 14.00 -1.00 $70.00 $70.00) Sediment removal - Type D modified inlet protection; A-2510 complete as specified Each 10.00 0.00 -10.00 $5.00 $50.00) Furnish; install; maintain; and remove stone tracking pad; A-2512 complete as specified Each 1.00 0.00 -1.00 $1,248.50 ($1,248.50) Furnish; install; maintain; and remove silt fence; complete Linear A-2514 as specified Feet 620.00 606.00 -14.00 $3.00 ($42.00) Furnish; install; maintain; and remove stone bag; complete A-2516 as specified Each 15.00 0.00 -15.00 $10.00 $150.00) Furnish; install; maintain; and remove 12" diameter sediment logs; complete as Linear A-2518 specified Feet 10.00 0.00 -10.00 $10.00 ($100.00) Furnish and install topsoil 6" Square A-2600 depth; complete as specified Yards 750.00 1,441.33 691.33 $5.00 $3,456.65 Furnish and install turf grass; Square A-2620 Icomplete as specified Yards 750.00 1,441.33 691.33 $0.50 $345.67 Furnish and install hydraulically -applied erosion control product; complete as Square A-2644 specified Yards 750.00 1,441.33 691.33 $2.00 $1,382.66 Furnish and install river rock landscaping stone; complete Square A-2654 as specified Yards 40.00 40.00 $11.25 Connect to existing storm sewer main; complete as A-2850 specified Each 1.00 1.00 $475.00 Connect to existing storm sewer inlet; complete as A-2858 specified Each 1.00 1.00 $475.00 Storm sewer utility line opening (ULO); complete as A-2914 specified Each 1.00 0.00 -1.00 $500.00 $500.00 General excavation; Lump A-2930 complete as specified Sum 1.00 1.00 $19,348.92 Relocate existing hydrant; A-4501 complete as specified Each 1.00 1.00 $1,500.00 SECTION A - (BID ITEMS A-1100 - A-4501) - SUBTOTAL $22,046.69 ($15,796.13) NET INCREASE TO SECTION A $6,250.56 Page 2 of 3 CONTRACT 17-01 CHANGE ORDER #1 (2ND REVISED FINAL) SECTION B ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Unclassified excavation; Cubic B-1200 complete as specified Yards 550.00 550.00 $15.39 Al -4999 Sawing existing pavement; Linear 0.00 1.00 1.00 $900.00 $900.00 B-1700 complete as specified Feet 1,700.00 1,630.50 -69.50 $1.50 $104.25) Base aggregate dense; 1- B-1801 1/4"; complete as specified Tons 925.00 925.00 $10.78 Tack coat; complete as B-1900 specified Gallons 300.00 125.00 -175.00 $5.56 ($973.00) HMA Pavement LT; complete B-1901 as specified Tons 585.00 576.12 -8.88 $89.64 $796.00) HMA cold weather paving; B-1903 complete as specified Tons 50.00 50.00 $94.44 Asphaltic pavement milling; Square B-1950 complete as specified Yards 4,250.00 4,250.00 $3.13 Prepare foundation for asphaltic paving; complete as Lump B-1960 specified Sum 1.00 1.00 $12,928.00 SECTION B - (BID ITEMS B-1200 - B-1960) - SUBTOTAL NET DECREASE TO SECTION B ADDITIONAL WORK REQUIRED: CO #1 $0.00 ($1,873.25) ($1,873.25) ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE Furnish and install hydrant extension; complete as Al -4999 specified Each 0.00 1.00 1.00 $900.00 $900.00 ADDITIONAL WORK: CO #1 (ITEM A1-4999) - SUBTOTAL NET INCREASE TO: SECTIONS A & B $900.00 $0.00 $5,277.31 NET INCREASE TO SECTIONS A & B $22,946.69 NET DECREASE TO SECTIONS A & B ($17,669.38) NET INCREASE TO CONTRACT: $5,277.31 Page 3 of 3