Loading...
HomeMy WebLinkAbout0104787-BuildingOSHKOSH ON THE WATER .lob.Address 600 N WESTHAVEN DR Designer Design II CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner WESTHAVEN OFFICES LLC Contractor Create Date NORTHCENTRAL CONSTRUCTION CORP. Category 223 - Alteration Offices, Banks, Professional Plan J5-103-1003 No 104787 10/15/2003 Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning C2-PD Class of Const: VA Size 35'x45' Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories 1 Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 0 Use/Nature OFFICE / 1616 sq ft 2 story addition per State ID # 925994 of Work HVAC Contractor NORTHCENTRAL CONST CORP HTG Plumbing Contractor JT SCHMIDT PLUMBING INC Electric Contractor EXCELLENCE ELECTRIC, INC. Fees: Valuation $200,000.00 Plan Approval $0.00 Permit Fee Paid $635.00 Park Dedication $0.00 Issued By: Date 10/15/2003 Final/O.P. 00/00/0000 Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 631 S HICKORY ST FOND DU LAC WI 54935 - 0000 Telephone Number 920-929-9400 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ZONING/LAND USE COMPLIANCE CHECKLIST JOB LOCATION: PROPERTY OWNER/CONTRACTOR: CONSTRUCTION DATA: New Construction ~ Addition __ Alteration TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.) L~-~ ~-~ ~ --~' ~ COMPLIANCE CHECKLIST DEFICIENT Use Lot Width Lot Area Lot Area Per Family Flood Plain Front Yard Front Yard Side Street Rear Yard Side Yards __ Building Area __ Parking Standards __ Off-Street Loading Standards Vision Clearance Transitional Yard Standards __ Landscape Standards Height Conditions of Approval Compliance with P.C. or BZA Conditions of Approval Signage Standards Mechanical Equip. Screening COMMENTS REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approve all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. ~ APPROVED Plan Commission Action Required Variance(s) Required REVIEWED BY: DATE: DENIED