HomeMy WebLinkAbout2003-Plumbing (water heater)OSHKOSH
ON THE WATER
.lob Address 1230 SUMMIT AVE
Contractor MOREMAN PLUMBING
Bathtub 0 Shower 0
Whirlpool 0 Floor Drain 0
Lavatory 0 Lndry Tray 0
Toilet 0 Lndry Stndp 0
Res. Sink 0 Disposal 0
Bar Sink 0 Dishwasher 0
Water Heater 1 Sump Pump 0
Site Drain 0 Classrm Sink 0
Roof Drain 0 Breakrm Sink 0
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No 104779
Owner Create Date 10/15/2003
Category 411 - Residential-Water Heaters Plan
Ejector/Grind 0 DipWell 0 F Prep Sink 0 Gar Drain
Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp
LocaIWaste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker
CIothesWshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap
Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap
Beer Tap 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve
Dent. Oper. 0 Hand Sink 0 Urinal 0 EyeWash Statn
Lab Sink 0 Plaster Sink 0 Standp Rec 0
Sterilizer 0 Surgeons Sink 0 Ice Maker 0
0
0
0
0
0
0
0
Use/Nature MULTI-FAMILY/#1230 A/Replace gas water heater.
of Work
Size Material Type # Conn. Type
Sanitary Sewer 0
0
0
0
0
Storm Sewer 0
0
0
0
0
Water Service 0
0
0
0
0
Valuation $350.00 Plan Approval $0.00 Permit Fees $20.00 ~ Permit Voided
Issued By
Date
10/15/2003
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address PO BOX 1325 OSHKOSH WI 54903 - 0000 Telephone Number
231-9191
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.