HomeMy WebLinkAbout0104765 BOSHKOSH
ON THE WATER
.lob Address 2326 OREGON ST
Designer AEC
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner LEONARD G/THERE SCHMICK
Contractor OWNER
Category 232 - Alteration Stores & Customer Service
No 104765
Create Date 10/05/2003
Plan
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: VB Size 1500 sq ft
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation O Poured Concrete (~) Floating Slab (~) Pier (~) Other
(~) Concrete Block (~) Post (~) Treated Wood
Occupancy Permit Required Flood Plain No Height Permit Not Required
Park Dedication Not Required # Dwelling Units 0 # Structures 0
Use/Nature Retail Assembly / Subway / Alterations to convert building into Subway Store. ALL WORK MUST COMPLY WITH APPLICABLE CODES! No
of Work Plan Review has been conducted for this project.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$160,000.00 Plan Approval $0.00 Permit Fee Paid
$515.00 Park Dedication $0.00
Date 10/14/2003 Final/O.P. 00/00/0000
Permit Voided
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Address 5669 ANGLE RD
Agent/Owner
OSHKOSH
WI 54904 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.