Loading...
HomeMy WebLinkAbout0104710-BuildingOSHKOSH ON THE WATER .lob .Address 457 W 14TH AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner GARY F/MARY GRAY Contractor OWNER Category 111 - Single Family Addition No 104710 Create Date 10/07/2003 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/ Constructing a 16' x 18' addition off the rear of the house. The addition will be a minimum of 5' from the existing detached garage. Dean of Work and Dean Builders (410-2565) will be doing the construction. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $20,000.00 Plan Approval $0.00 Permit Fee Paid $95.00 Park Dedication $0.00 Date 10/10/2003 Final/O.P. 00/00/0000 Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 457W 14TH AVE Agent/Owner OSHKOSH WI 54902 - 6539 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.