Loading...
HomeMy WebLinkAbout0104662 BOSHKOSH ON THE WATER .lob Address 700 N WESTHAVEN DR Designer Design II CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 104662 Category 221 - New Offices, Banks, Professional Owner Westhaven Office LLC Create Date 10/08/2003 NORTHCENTRAL CONSTRUCTION CORP. Plan Contractor Type Building (~ Sign (~ Canopy (~ Fence ~ Raze Zoning C-2PD Unfinished/Basement Finished/Living Garage Foundation Occupancy Permit Park Dedication Poured Concrete Concrete Block Not Required Not Required 0 Sq. Ft. 26984 Sq. Ft. 0 Sq. Ft. (~ Floating Slab (~ Post Class of Const: VB Rooms 0 Bedrooms 0 Baths 0 (~ Pier (~ Other (~ Treated Wood Flood Plain No # Dwelling Units 0 Height Stories 0 Ft. Size 26984 sq ft ~ Projection I Canopies 0 Signs 0 Height Permit Not Required # Structures 0 Use/Nature NEW OFFICE/26984 sq ft office/FOUNDATION AND SITE WORK ONLY of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $250,000.00 Plan Approval $0.00 Permit Fee Paid $785.00 Park Dedication $0.00 Date 10/08/2003 Final/O.P. 00/00/0000 Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 631 S HICKORY ST FOND DU LAC WI 54935 - 0000 Telephone Number 920-929-9400 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. JOB LOCATION: -~ ~ PROPERTY OWNER/CONTRACTOR: CONSTRUCTION DATA: ~ ZONING/LAND USE COMPLIANCE CHECKLIST New Construction Addition __ Alteration TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.) COMPLIANCECHECKLIST DEFICIENT Use Lot Width Lot Area Lot Area Per Family Flood Plain Front Yard Front Yard Side Street Rear Yard Side Yards Building Area Parking Standards Off-Street Loading Standards Vision Clearance Transitional Yard Standards Landscape Standards Height Conditions of Approval Compliance with P.C. or BZA Conditions of Approval Signage Standards Mechanical Equip. Screening COMMENTS REVIEW AUTHORITY As per Section 30,5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approve all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. APPROVED DENIED Plan Commission Action Required Variance(s) Required REVIEWED BY: