Loading...
HomeMy WebLinkAbout0104725-Building (storage bldg)OSHKOSH ON THE WATER .lob Address 375 N EAGLE ST Designer AEC CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner OSH AREA SCHL DISTWEST HIGH Contractor OWNER Category 240 - Other Non-Residential No 104725 Create Date 10/10/2003 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: VB Size 20' x 26' Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories 1 Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete (~) Floating Slab (~) Pier (~) Other (~) Concrete Block (~) Post (~) Treated Wood Occupancy Permit Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 1 Use/Nature School/Construct 20' x 26' detached equipment storage building. All loads must transfer properly. of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $9,000.00 Plan Approval $0.00 Permit Fee Paid $80.00 Park Dedication $0.00 Date 10/10/2003 Final/O.P. 00/00/0000 Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address PO BOX 3048 Agent/Owner OSHKOSH WI 54903 - 3048 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.