HomeMy WebLinkAbout2003-Plumbing (laterals) CITY OF OSHKOSH
OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 1740 ROBIN AVE Owner
Contractor 4 WAY CONSTRUCTION Category 401 - Residential-Exterior (laterals)
Bathtub 0 Shower 0 Ejector/Grind 0 DipWell 0 F Prep Sink
Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink
Lavatory 0 Lndry Tray 0 LocaIWaste 0 Wait. St. 0 Shamp Sink
Toilet 0 Lndry Stndp 0 CIothesWshr 0 Ice Chest 0 FIrNVst Sink
Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin
Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn
Water Heater 0 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal
Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec
Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker
No 104629
Create Date 10/07/2003
Plan
0 Gar Drain
0 Soda Disp
0 Coffee Maker
0 Int Grease Trap
0 Ext Grease Trap
0 RPZ Valve
0 EyeWash Statn
0
0
0
0
0
0
0
0
0
Use/Nature INSTALL SEWER AND WATER LATERALS FOR 8 UNIT APARTMENT
of Work
Size Material Type # Conn. Type
Sanitary Sewer 6" Plastic Lateral 1 New
0
0
0
0
Storm Sewer 0
0
0
0
0
Water Service 2" Plastic Lateral 1 New
0
0
0
0
Valuation $2,000.00 Plan Approval $0.00 Permit Fees $50.00 ~ Permit Voided
Issued By
Date
10/07/2003
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address P.O. BOX 133 BERLIN WI 54923 - 0000 Telephone Number
414-361-1403
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.