Loading...
HomeMy WebLinkAbout0104637-Building (roof & micorlam in garage)OSHKOSH ON THE WATER .lob Address 1225 MERRITT AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner DAVID M/MARGOT HIRSCH Contractor LAIB RESTORATION INC Category 141 - Exterior Remodeling No 104637 Create Date 10/07/2003 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/Re-roofing the house and garage (complete tear off), resheathing the main house roof. A microlam will be installed for the garage roof due of Work lo the rafters sagging. All structural work is required to be done to meet the minimum code requirements. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $5,000.00 Plan Approval $0.00 Permit Fee Paid $40.00 Park Dedication $0.00 Date 10/07/2003 Final/O.P. 00/00/0000 Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 21 W NEWYORKAVE OSHKOSH WI 54901 - 3757 Telephone Number 233-7026 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.