Loading...
HomeMy WebLinkAbout0104654-Plumbing (water heater)OSHKOSH ON THE WATER .lob Address 1777-1779 MARICOPA DR Contractor MOREMAN PLUMBING Bathtub 0 Shower Whirlpool 0 Floor Drain Lavatory 0 Lndry Tray Toilet 0 Lndry Stndp Res. Sink 0 Disposal Bar Sink 0 Dishwasher Water Heater 1 Sump Pump Site Drain 0 Classrm Sink Roof Drain 0 Breakrm Sink CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner MOKLER PROPERTIES INC Category 411 - Residential-Water Heaters No 104654 Create Date 10/07/2003 Plan 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 0 WaterSoffner 0 DrinkFtn 0 ServSink 0 SodaDisp 0 0 Local Waste 0 Wait. St. 0 ShampSink 0 Coffee Maker 0 0 ClothesWshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZValve 0 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye WashStatn 0 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Use/Nature of Work Apt B/Replace 30 gallon electric water heater. Size Material Type # Conn. Type Sanitary Sewer 0 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 0 0 0 0 0 Valuation $400.00 Plan Approval $0.00 Permit Fees $20.00 ~ Permit Voided Issued By Date 10/08/2003 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address PO BOX 1325 OSHKOSH WI 54903 - 0000 Telephone Number 231-9191 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.