HomeMy WebLinkAboutChange Order No 1 16-22 Marion Road Water TowerChange Order No. 1 December 3, 2017
City of Oshkosh Contract No. 16-22
Marion Road Water Tower Replacement Project
Contractor: Chicago Bridge and Iron, LLC
This document shall become a supplement to City of Oshkosh Contract No. 16-22 and all provisions
will apply hereto.
TABLE 1
Description of Requested Changes
Item FO No. Description Action
Amount
1a. 01 Reduce size of valve vault and person door to facilitate construction Deduct
$17,538.00
lb. 02R Modify watermain to provide greater operational flexibility; modify site storm Add
$29,218.71
water features to better meet area storm water management objectives
lc. 04 Enclose dry riser tube at tower roof to mitigate water quality issues Add
$10,508.75
id. 05 Substitute grade of stainless steel pipe material Deduct
$9,975.00
1e. 06 Relocated watermain to avoid conflict with sewer. Actual sewer location Add
$13,370.38
differed from available records.
1f. 07 Extend tank vent to mitigate potential blockage by accumulated snow Add
$5,290.23
TOTAL VALUE OF CHANGE ORDER NO. 1 Add
$30,875.07
TABLE 2
Adjustments to Contract Price and Contract Time
Contract Price Adjustment Amount
Original Contract Price $3,624,000.00
Previous Change Orders $0.00
Adjustments in Contract Price this Change Order $30,875.07
Current Contract Price including this Change Order $3,654,875.07
Contract Duration Adjustment Duration
Original Contract Duration 730 days
Previous Change Orders 0 days
Adjustment to Contract Duration this Change Order 0 days
Current Contract Duration including this Change Order 730 days
Revised Contract Substantial Completion Date August 2, 2018
RECOMMENDED
Engineer — CH2M HILL Engineers, Inc.
APPROVED
tractor hicago Bridge & Iron, LLC.
APPROVED BY OWNER
City -M-1 anager
City Clerk
01ll,6fADJ$
Date
Date
qa � ,�
Date
Date
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh,
Wisconsin under this Change Order.
`l , c�
City Comptrol er Date
APPROVED AST FORM
- 1C
torney Date
RECEIVED
MAR - 7 2018
CQ(VIRACT FIELD ORDER (CFO) DEPT OF PUBLIC WORKSOSHKOSI-t, WISCONSIN
FIELD ORDER NOI: 001
TO CONTRACTOR: Chicago Bridge & Iron
PROJECT: Marion Road Water Tower Replacement PROJECT NO: 16-22
OW NER; City of Oshkosh
ENGINEER: CH2M HILL
1. Reduce the length of the valve vault by 2 feet. Provide 9400t wide by 16 -foot tong (interior dimensions) vault.
2. Reduce the height of the personnel door by 1 foot. Provide 4 -foot wide by 7 -tool tall door,
1..Areduced vauitbetteraccommodates proposed foundation design.
2. A reduced door better accomdates Intending tower steeling welding design.
Contract Amount or Price Contract Times (Calculate Days)
Original
Previous Contract
Modificalion(s)
(Add/Deduct)
This Contract Modification
(4"Deduct)
Revised Contract Amount
$ 3,624,000.00
3
$ 17,538
Original Duration 730
Days
Previous Contract
By; ��
0 -3--,7 ey
Modification(s)
By: CH2M L
Date: �4& J2c I g
(AddlDeduct)
Days
This Contract Modification
(Add/Deduct) 0
Days
Revised Contract Time 730
Days
The Revised Contract Completion Dale is:
.20 18
Q� r
Contractor
Engineer Recommendationr
By; ��
0 -3--,7 ey
By: C861
Date: s` �,� i
By: CH2M L
Date: �4& J2c I g
I Number all Modllicallons consecutively.
2 Recommendation necessary for Field orders.
Capies:Owner
Field File
PROTECT No. 681646
C131'
City of Oshkosh Contract No. 16-22
Marion Road Water Tower Replacement Project
Contractor: CB&I
Project Manager: Lance Jansen
Field Order 01
Changes in valve vault
Changes in height of door
Sincerely,
ance Jat
CB&I, c.
Cast
(17,538.00)
CB&I Inc.
14109 S. Route 59
Plainfield, IL 60544
Tel: 815-439-3100
Fax: 815-439-3130
www.CBI.com
WF Johnston,
$3,92.7
5!
$191..35 .
subtofial
$4,018
:TOTAL VAULT
Approved 'LENGTH $7x739 .
:CBI Engnihering
CB[Material
$1,700
CBI Fabrication
$1,500
-CBI'Field
.:Construction
$2,583
subtotat
:$9,333
5%
$466.65
TOTAL. PERSON
606R
Engineering Procurement • Construction Since 1889
6
0
4
Nt?iOTAL �!$17,538s�
W.F. Johnston
Construction, Inc.
To: Mike Allison
CBI Constructors, Inc.
1505 North Division Street
Plainfield, IL 60544
Description: Credit ofr Vault Reduction
Change Request
Number: 1
Date: 8/30116
Job. 16-009 Oshkosh, WI
Phone:
We are pleased to offer the following specifications and pricing to make the following changes:
Delete 2- 16" diameter by V-0" Spools
Materials: ($ 1,348.00)
Labor: ($ 672.00)
Credit for reduced quantities in the vault construction:
Materials- ($ 982.00)
Labor: ($ 825.00)
All Labor costs also includes supervision, equipment and required tools.
The total amount to provide this work is .: ............................... :.... ::.... :::.......... :....:..::...... .:...:..........
:_..;:
If you have any questions, please contact me at (815)467-4600.
Submitted by: Marc F. Johnston Approved by:
W.F. Johnston Construction Date:
Cc: file
109 Industrial Drive
Minooka,IL 60447
Ph :(815)467-4600
$-3, 827.00
Page 1 of 1
I
\_ � ' � \ -
n ) �'��
rI�
k
��
�o
y -
a,
n �J
o i
� �� ±
m
RECEIVED%
MAR - 7 2018
CONTRACT FIELD ORDER (CEO)
FIELD ORDER ND: OEPT OF PUBLIC WORKS
TO CONTRACTOR: Chicago Bridge S Iron
PROJECT: Marian Road Water Tower Replacement PROJECT NO: 16-22
OWNER: City of Oshkosh
ENGINEER: CH2M
1. Shift location of new.watermain as shown in revised Drawing 05-C-203.
2. Connect new watermain to existing 8' watermain and existing 6" hydrant as shown on revised Drawing 05-C-203.
3. Add a 16' gate valve In the walermain between the tower site hydrants as shown on revised Drawings 05•C-203 and 08-N •001.
4. Reduce length of concrete encasement for 16'W, 4' SAN, and 2' SPD to 10' beyond ringwall as shown on revised Drawings 50-
S -201.50-S301, 50-D-301.
5. Refer to clarified callouts and corrected cailout leader lines regarding abandonment of existing water main and tie-in for new water
main shown on revised Drawing 05-C-203.
6. Shift driveway location to accommodate enlarged drainage swaie; relocate fence posts and plants as shown on revised Drawings
05-C-202, 05-C-203, 05-L-201.
7. Add box manhole below beehive inlet at end of drainage Swale as shown on revised Drawing 05-C-203
8_ Revise finished grades on new tower site and Rlverway area.
9. Reduce 12' SSS to 8' SSS.
10. Adjust grading, flow arrows, and spot elevations on Drawing 05-C-202.
f 1. Refer to beehive inlet detail added to Drawing 90 -SD -506.
1. To beats walermain within existing utility easement. 7• To add omitted manhole,
2. To improve distribution system piping network redundancy. 8, To meet City stormwater requirements.
3. To provide greater flexibility for tower maintenance activities, 9, To meet stormwater flow requirements.
4. Adjustment based on actual lower foundation design, 10. To Improve site and adjacent property drainage.
5. To clarify drawing callouts. 11. To meet City stormwater requirements.
6. To achieve greater than 40 percent stormwater TSS reduction
on new tower site.
Revised Drawings 05-C-203, 05-C•202, 05-L-201, 08-N-001, 50-S-201, 50•S-301
Contract Amount or Price ContractTirnes (Calculate Days)
Original
$ 3,624,000.00
Original Duration 730
Days
Previous Contract Modification(s)
$
Previous Contract -
Days
(AddfDeduct)
Modi%cation(s)
(Add/Deduct)
This Contract Modification
3 29,218.71
This Contract Modification 0
Days
fAddlDeduGN
(AddiDeduct)
Revised Contract Amount
$
Revised Contract Time 730
Days
The Revised Contract Completion Date is:
2018
vner
Contractor
Engineer Recommendation
By: _ _
Date: ?7— ZO-lSr
By: CB&I
Date, 7
By: CH2M
Date:
I'aoJECr NO -681646
City of Oshkosh Contract No. 16-22
Marion Road Water Tower Replacement Project
Contractor:. CB&I
Project Manager: Lance Jansen
Field Order 02
Changes in Water main Cost
CB&I Inc.
14109 S. Route 59
Plainfield, IL 60544
Tel: 815-439-3100
Fax: 815-439-3130
www.CBI.corn
2nd tier Subcontractor $22,736.00 see attached A Winter Price and Breakdown for FO 02
Subcontractor Mark-up @
5% $1,136.80 Per Contract
Sincerely,
L �ceJans
B , ne.
Engineering - Procurement • Construction Since 1889
Impact
Hours
Rate
Total
CB&I Direct Costs $4,648.62
Engineering
10
$130.59
$1,305.90
Project
Mgmt
10
$163.22
$1,632.20
Estimating
4
$128.59
$514.36
see attached 2016 T&M Rates
Subcontracts
2
$123,36
$246.72
HSE
Oversight
8
$11.8.68
$949.44
$4,648.62
Mark-up @ 15% $697.29
Total Field Order02 $29,218.71
Sincerely,
L �ceJans
B , ne.
Engineering - Procurement • Construction Since 1889
7 7_79
*kJ
I. LABOR
2016 T&M Rates
STANDARD TIME AND MATERIAL RATE SHEET
Classification
General Tank Superintendent
Tank Superintendent
Field Engineer
Weld Supervisor
Safety Supervisor
NDE Specialist
Tank Foreman
Leadman
Craftsman A
Craftsman B
Craftsman C
Craftsman D
Craftsman E
Craftsman F
Laborer
Field Accountant
Timekeeper
Holewatch/Firewatch
Straight
Overtime
Time
Rate
Rate
$141.10
/WH
$
174.50
/WH
$137,64
NVH
$
169.86
IWH
$109.04
NVH
$
131.67
NVH
$111.29
NVH
$
135.09
NVH
$118.68
NVH
$
144.97
NVH
$ 97.81
NVH
$
118.42
NVH
$112.15
1W
$
136.23
NVH
$ 97.81
NVH
$
118.42
NVH
$ 95.43
/WH
$
115.18
/WH
$ 93.86
NVH
$
113.01
NVH
$ 92.26
NVH
$
110.82
/WH
$ 89.88
NVH
$
107.58
1WH
$ 88.29
NVH
$
105.41
NVH
$ 85.08
NVH
$
101.06
NVH
$ 67.36
NVH
$
76.87
NVH
83.96
NVH
$
99.53
NVH
$ 77.91
NVH
$
91.22
NVH
S 63.96
NVH
$
72.20
NVH
All time over 10 hours per day when working 4 10 -hour days per week, over 8 hours
per day when working 5 8 -hour days per week, over 40 hours per week and all
Saturday and Sunday time will be invoiced at the overtime rate of time and one-half.
If an employee is brought in during the week, time worked on other CB&I projects
counts toward the 40 hours for overtime consideration -
Show -Up Time
Show up time will be invoiced for each person in the crew at the applicable labor rate
under the following circumstances:
2 1/2 hours per person for showing up if no work is commenced
5 hours per person if actual work is commenced.
10 hours per person if work continues past 4 hours.
Subsistence
Subsistence will be paid to CB&l employees who qualify, including days on which
show -up time is paid, and will be invoiced at the rate of $136.94 per day.
Page 1 of 3
FormNumber: CMS -730 -01 -FM -02016 Issued For Use: 04 MAR 2016 Printed: 2/9/2017 8:23 AM
2016 T&M Rates
STANDARD TIME AND MATERIAL RATE SHEET
It. TRAVEL
Round trip travel for one (1) trip from the permanent residence of a CR&I employee
the jobsite and return will be invoiced at the rate of $0.65 per mile.
Ill. TOOLS AND SUPPLIES
To cover the cost of tools and supplies required to perform the: work an amount of $9.94
per manhour will be invoiced. Please refer to Attachment A for a list of tools and supplies
included in this charge. Any tools or supplies which are not listed in Attachment A but are
provided by CB&I for the work will be reimbursed at the vendor's invoiced .amount plus 15.0%.
IV. EQUIPMENT RENTAL
Reimbursement for equipment owned by CB&I will be in accordance with the rates shown in
Attachment S. Fuel and lubricants for this equipment will be reimbursed at the
the vendor's invoicedamount plus 15.0%.
All equipment rented from third parties will be reimbursed at the vendors invoiced amount
plus 15.0%. Fuel and lubricants required for this equipment will be reimbursed at
the vendor's invoiced amount plus 15.0%
All deliveries of equipment or tools to and from the jobsite will be reimbursed
at the actual motor freight invoice amount plus 15,0%.
V. MATERIALS
Materials which CB&I furnishes for the work will be reimbursed at the vendor's invoiced amount,
inlcuding transportation, plus 15.0%. Weld rod and gases are considered material.
VL SUBCONTRACTORS
Subcontract services CB&I furnishes as part of the work will be reimbursed at the subcontractor's
invoiced amount, plus 15.0%.
Page 2of3
FormNumber., CMS -730 -01 -FM -02016 Issued For Use: 04 MAR 2016 Printed: 2/9/2017 8:23 AM
2016 T&M Rates
STANDARD TIME AND MATERIAL RATE SHEET
VII. OFFSITE ENGINEERING AND TECHNICAL SERVICES
Any CB&I furnished engineering and technical services required for the work will be reimbursed
at the following rates:
Classification Rate
Design Engineer $123.61 /WH
Detail Engineer $109.65 MIH
Any travel expenses incurred by above personnel will be invoiced at actual costs plus 15.0%.
VIII. SHOP FABRICATION
Any CB&I furnished shop fabrication for the work will be reimbursed at the rate of $77.64
per manhour expended.
IX. OFFSITE PROJECT MANAGEMENT
Project Management services required for the work will be reimbursed at the following rates:
Classification
Rate
Project Manager
$163.22
MIH
Construction Supervisor
$139.41
MIH
Project Engineer
$130.59
MIH
Procurement
$111.48
MIH
Estimator
$128.59
/WH
Subcontractor Administrator
$123.36
MIH
Any travel expenses incurred by above personnel will be invoiced at actual costs plus 15.0%,
X. TAXES
The above rates do not include state sales and use taxes, gross receipts taxes, or any other
similar taxes. If taxes are applicable to this work, they will be invoiced at cost.
XI_ INVOICES
Time and Material invoices will be on a weekly basis. Payment without retainage is expected
within 30 days.
Page 3 of 3
Form Number: CMS -730 -01 -FM -02016 Issued For Use: 04 MAR 2016 Printed: 2/9/2017 8:23 AM
:K, SNATCH, 316' CABLE
'ER, CABLE, LARGE
'ER, CABLE. SMALL
N HOIST, 3 TON
(P, 5 TON BRIDLED SCREW PLATE
tSTON TRACK
LAER, 4 LA MAUL
LAER, 5 LA MAUL
AP, P,ENFRO-BARGE, t-112 TON (EA. CLAMP)
E 314-, MANILA, t FT
'KLE 12 TON CAP, T- 19 PIN, SCREW PIN
G, 51's X 8' LONG
EADER BAR 10 TON FOR PLATE CLAMPS
LINE CLAMP - E455A
ICE. 2"X 15'
4K NUT, 314'C$
4K NUT, UW CS
;ER BAR. CS
IH LUG 2A38 CS
BULL PIN
CHANNEL
PLATE
(R, S' LONG,
ECECTR/G^TOOLS 6 SUPPWES ^
BULB, LIGHT, 120 V, 500 W. QUARTZ
EXTENSION CORD, t25 VOLT, TWIST -LOCK, t00'
GFCI TESTER
LIGHT STAND, QUARTZ
TAPE. ELECTRICAL(BLACK)
TAPE, FRICTION
2016 T&M Rates
ATTACHMENT A
CB1&I
BASIC TOOL AND SUPPLY LIST
}FOOLS bSUPPtiES
'ER W''HITE, 964, METAL
IM, SHEET
.MEASURING, I00'
, MEASURING, 50'
W. PUSH
L, CARPENTERS, 4'•0
K LINE
FPT-UP, LARGE
FIT-UP,STANDARD
TANK, NEW STYLE WI BUILT IN DIKE 8 FUEL PUMP
LEY AUTO LEVEL
SHIPPING, STEEL (SMALL)
GS, SEA CONTAINER. 21' LONG
IEY TRIPOD. TRANSIT
E BRUSH - HAND, CS.
i WHEEL, 6- X. 5,W X .020 THK C.S.
G BLOCK, 6"X6'X2--6"
. FIBERGLASS, 20' WI SHOES
4ER, SCAFFOLD TOOL
IlMIMMAIG ifim Y d Sffl tY N' I I 1 s + . + . . e y
IGk �O&S S S(/Pkf- . . - .' 1
LOT, A:R HOSE REPAIR
WRENCH, ANGLE GRINDER
HAMMER, CHIPPING,
CHISEL, DESLAGGING GUN
HISE:L,. FLAT, CHIPPING HAMMER
BINDING STONE, r X 114' X 518'
BINDER, AIR, r ANGLE
MOVER, COPPUS AJR FAN
GRINDER, AJR, STRAIGHT
hwzw$4 FlPES.' -' •--
HOSE,-SULI-, 1.112' X 50'
HOSE, AIR WICONNECTIONS '3/4' X IOT
DIOSE- AIR, WHIP W1 QUICK DISCONNECT, 314- X IS -
MANIFOLD. Alk .4 -WAY
3TTLE CART
JRNiNG OUTFIT
EGULATOR, OXYGEN„ 0-1000 PSI
EGULATOR, ACETYLENE 0.4000 PSI
DSE. FOR BURNING - 114"p TWIN OX-PROPANE-ACCET
ARCH, CUTTING
iT, BURNING. HOSE REPAIR
OGGLES, BURNING
ACK-STORAGE, ACETYL BOTTLES .(CAP -3FL&3 EMTY)
ACK, STORAGE, 02 BOTTLES (CAP -6 FULL & 6 EMPTY)
TRIKER. GAS TORCH LIGHTER
P CLEANER
P, lJt .ACETYLENE
rEirxNs raois ssDrPi(�s°.^
AMMER. SLAG
000, WELDERS
ENS, CLEAR REPLACEMENT
_LYS; WELDERS COLORED 09
-.-.'-.-�.-
ENTER PUNCH, HIGH STRESS
EAMTEST (T GAL), LO TEMP
ACUUM BOX., FLAT, 30"
AT BAND, TERRI CLOTH
BARRICADE 15U (BARRIER), YELLOW t BIACK
EXTINGUISHER- 10 LB
PLUGS (60)()
NIdKs
3A( OUST MASK V9970
ARNESS Wl SIDE O.Fi.ING - XLARGE
WI SHOCK ABSORBER
SHIELD, (GRIN(YNG)
HAT,BLUE
SHIELD HOLDER
IY GLASSES,CLEAR
IT' GOGGLES, MONO
, WATER, 5 GALLON
FIRST AID, LARGE
ETCHER„ BASKET -
WASH DEVICE
CAUTION HEARING PROTECT REQUIRED THIS AREA
CAUTION HIGH NOISE LEVEL
DANGER AUTHORIZED PERSONNEL ONLY
COMBUSTABLE LIQUID FUEL
DANGER 440 VOLTS
DANGER DIESEL
DANGER 00 NOT ENTER W OUT H.IiAT & S. GLASSES
DANGER DO NOT ENTER WtCUT HARD HAT & GOGGLES
DANGER EYE PROTECTION REQUIRED IN THIS AREA
LLLSJ111C.— IV--.]Y!'CLJ
LYON, YELLOW LUMBER (12 PER BOX)
'S - BOX OF 250
I BOX
2KER, SOAPSTONE (BOX)
'E, DUCT (P ROLL)
'E, MASKING, Z-
VARE-.062 DIA (16 GAUGE.)
;ES, CHI
FOREMAN'S
GREEN
RED
Page 1 of 1
FormNumber: CMS -730 -01 -FM -02016 Issued For Use: 04 MAR 2016 Printed: 2/9!2017 8:24 AM
COMPRES$OR9:1�1bt=trlc`.'.'.'. .'.'.'.':`.'.'.+.'.'.','.'.',$MIEN'.
YpftX�fJE7CCR 1 ?C NIeT•'.+.', .'.'.'.' V��tC�.
COMPRESSOR. 205 CFM
$317
CRANE._ MANTIS, 361218 TON w1STEEL TRACKS
$2,852
COMPRESSOR, 260 CFM
$481
CRANE, MANTIS; 3612 18 TON WIRUBBER PADS
$3,105
COMPRESSOR, 250 CFM
$481
CRANE, MANTIS, 001 OLP, 30. TON w1STEEL TRACKS
$3,985
COMPRESSOR, 260 CFM
$481
CRANE, MANTIS, 6010LP, 30 TON w1RUBBER PADS
54,542
cc�l�,Q�sscu�s=t3taser,
+$311
xczr�uuc.c�ar�s � �l .rarraiu•>
COMPRESSOR, 175 CFM
CRANE, GROVE RT--528C 28 TON
$1,948
COMPRESSOR, 375 CFM
$495
COMPRESSOR, W/AFTER COOLER, 175 CFM
$431
COMPRESSOR. WAFTER COOLER. 375 CFM
$646
COMPRESSOR. W/ AFTER COOLER, 825 CFM
$1,101
GENERATOR, 5 KW, GAS POWERED
$405
112 TON PICKUP
$380
GENERATOR, 80 KW, GAS POWERED
$773
314 TON PICKUP
$380
GENERATOR, 205 KW, DIESEL.
$061
1 TON PICKUP
TRAILER FLOAT, 35'-40
DOLLY, FIFTH WHEEL
$380
$253
5114
}'1/EI + ,
WELD-AIR UNIT, 205 KW Wl I SULLAIR COMP. & 6 MILLER C81400 $2,492
WELD-AIR UNIT, 205 KW Wl I SULLAIR COMP. & 3 MILLER C814008 3 CBI-650
$2.492
WELD-AIR UNIT, MINI 3-PACK Wi 1 SULLAIR COMP. & 3 MILLER C81400
$2,492
UI/EC9/NGhIACHINE�S '�7ectiie'+•+',',
WELDER, ELECTRIC,400A $75
WELDER, ELECTRIC, 600-650A
5101
- Rb A l L�'G 7C Q N
PANEL, POWER DISTRIBUTION, 400A Wl CABLE
PANEL, POWER DISTRIBUTION, 600.A Wl CABLE
PANEL, POWER DISTRIBUTION, 800A W/ CABLE
$203
$272
$342
WECDINGLMACHINES- D;w5el+'+ + + +'+ + + + + , + + + + +'+ + +'+
WELDER, DIESEL, 400A $272
WELDER, DIESEL, 600A- 800A
$317
SUB-PANEL, 10DA
S75
WELDER, DIESEL, 600A AIR PAK, MILLER #BIG BLUE AIR PAK
$450
SUB-PANEL, 200A - WILL PLUG INTO 600 AMP PANEL
TRANSFORMER, 15KVA
TRANSFORMER, 25 KVA
$107
S75
$96
-'+'+'
WELDER, AUTOMATIC GIRTH, LIGHTWEIGHT AGW, WI MPS $2,055
WELDER, AUTOMATIC GIRTH, AGW,W/MPS
$2,055
TRANSFORMER', 50KVA
$101
WELDER, AUTOMATIC. VERT, AVW, W MPS
$1,935
WELDER, LT7 DOWN FLAT TRACTOR WITH LINCOLN #LN-9 WIRE FEEDER
$468
. 0/5 -- Aji- Ng4ers +
WELDER, MINI GIRTH
$810
HOIST, INGERSOLL-RAND, 1 DRUM TO 1000#, BU NX CABLE
.$183
LEAD, WELDING. 125'
$21
HOIST, INGERSOLL-RAND, 1 DRUM, TO 2000#, HUL W/ CABLE
$247
OVEN, ROD. 3009, 125 VAC
S26
HOST, INGERSOLL-RAND, 1 DRUM OVER 20000, K4UI: Wl CAB
$436
LN-25 WIRE FEEDER
$96
lmt�r-apau�lx.x>'rs' reutfi!
PORTA POWER, 5 TON Wl PUMP $57
PORTA POWER, 10 TON W PUMP
$57
PORTA POWER, 50 TON Wl PUMP
$127
PORTA POWER, 100 TON W1 PUMP
$190
HOIST, HYDRAHOIST, 440NCH DIESEL, #11-35
HOIST, HYDRAHOIST, 3-WINCH DIESEL, #HP$l
$1,006
$1,006
CONTAINER, CONNEX, 8' X 40' $242
CONTAINER, CONNEX, TOOL, 8X8
$44
HOIST, HYDRAHOIST, ELECTRIC, $11-3S
5436
TOOT. BOX - FOREMANS STANDARD (KNAAK 89)
S26
TOOL BOX, PYRAMID (GANG BOX)
$26k(AN'H015
S
CHAINFALL HOIST-5 6 TON
CHAINFALL HOIST 10 TON
$49
$197
CONTAINER, CONVEX, 8'X 20' $96
Fl CN 6$ ii
TRAILER, VAN, PROJECT MANAGER $626
AILER, VAN, FOREMANS OFFICE
$190
084 A:bC 9—
CABLE, 1-1/2 TON LUG-ALL
$49
CONTAINER. CONNEX, 8' X 20, FOREMANS OFFICE 5151
TRAILER, VAN, 100%X-RAY
$247
HOIST, 1-112 TON LUG-ALL
$49
CONTAINER, CONNEX, X-RAY. 8X8
$166
HOIST, 3 TON LUG-ALL
$57
CONTAINER, SEA CONVEX, X-RAY, 8X20
$209
Page 1 of 2
FormNumber. CMS -730 -01 -FM -02016 Issued For Use: 04 MAR 2016 Printed. 2/912017 824 AM
ATTACHMENT B
CB&I
UN -FUELED EQUIPMENT RENTAL RATES 2016
NOTES:
1. Rates for equipment not listed will be furnished as needed.
2. Rates do not include operator.
3. The weekly rates are based on 40 hours per week and 4 weeks per month.
Rates for over 40 hours per week will be prorated at 75% of the above rates.
Page 2 of 2
FormNumber: CMS -730 -01 -FM -02016 Issued For Use: 04 MAR 2016 Printed: 2/9/2017 8:24 AM
EE
BUGGY, PLATE
$75
RECORDER, HYDROTEST, 0-6 PSIG
$203.
FIT UP YOKE, GIRTI-I (ADJUSTABLE)
$107
RECORDER. HYDROTEST, 0-15 PSIG
$203
FIT UP YOKE, WINDGIRDER (NDN -ADJUSTABLE)
$107
RECORDER: HYDROTEST, 0.000 PStG.
$203
VACUUM BOX, CORNER, 30"
$31
SURVEY THEODOLITE
$81
THREADING MACHINE, PIPE, MODEL 300
$166
SURVEY TRANSIT
$57
MACHINE, PIPE BEVELING, 2"- 4"
$75
MACHINE, PIPE BEVELING, 4"- 8"
MACHINE, PIPE BEVELING, W - 12-
MACHINE, PIPE BEVELING, 16"-20"
$75
$75
$114
SPREADER BAR 25 TON ADJUSTABLE $57
SPREADER BAR t00 TON ADJUSTABLE
$75
MACHINE, PIPE BEVELING, 20" - 26"
$227
GRINDER, ELECTRIC; 4-112", ANGLE
GRINDER, ELECTRIC, 9. ANGLE
$49
S49
SCAF-F47LDUYG,',',',`,'.'+'+'-.','+','-.',
BOARD, SCAFFOLD, 27 X 12" X 6' - PER 100 $127
BOARD, SCAFFOLD, 2"X 12"X8' - PER 100
1127
BLAST POT, SCHMIDT 600 LB.
$329
BOARD, SCAFFOLD, 2" X 12" X 10' - PER 100 $140
BOARD, SCAFFOLD, 2"X 1Z" X 12' -PER 100
$166
CANNED SAND UNIT, SCHMIDT 6 TON, 12V
$690
BOARD, SCAFFOLD, 2" X 12" X 14' - PER 100 -
$190
CANNED SAND UNIT, SCHMIDT 8 TON, 12V
$571
BRACKET: SCAFFOLD, ADJUSTABLE - PER 50
$405
PUMP, PAINT, 45:1
$335
BRACKET, SCAFFOLD, ADJUSTABLE, 54" - PER 50
$405
PUMP, PAINT. 56:1
$335
BRACKET, SCAFFOLD, ADJUSTABLE, EXTRA WIDE - PER 50
$405
HOPPER. SAND
$778
BRACKET. SCAFFOLD, RIGID - PER 50
$311
BULLARD #883240 BLAST HOOD
$317
AIR CONDITIONER, VORTEX, COMPLETE W/ VEST
$127
AIR DESICCANT DRYER (VAN -AIR)
SPIDER SKY CLIMBER. SC30. Wt 100' CABLE
SPIDER BUGGY, ST -17 or ST -19 or ST -26. w/150' CABLE
$166
$284
$311
Aifs T-OOrL-S-"-CCE-S&ll%E&'+'+','+','+',','+','+ ,','+ ,'+'--'+'--'+'+ -'
GRINDER, AIR -PENCIL/ DIE $49
GUN, DE -SLAGGING
$49
WRENCH, IMPACT, 34" DRIVE
S57
4WER-P& fiFiS+ ,
WRENCH. IMPACT, VDRIVE
$75
PUMP, TEST, HYDROTEST, 1000 PSI (LOW PRESSURE)
$297
WRENCH, IMPACT, 1 112" $101
ARC GOUGE
$57
PUMP, TEST, HYDROTEST, 1400 PSI (HIGH PRESSURE)
$297
AIR RECEIVER LARGE
$107
PUMP. TEST, HYDROTEST, 500 PSI (HIGH VOLUME)
$297
PUMP. SUMP, 1-1/2" AIR
$96
sUZ �p r cUrpnf Nr...:...'..-.'.-..._._..'.: -
s . u sir .r....._._,_...-._.
PLASMA CUTTING OUTFIT, ELECTRIC, (Max 1 inch Capacity)
$253
FAN, AIR, 1 ID VAC. EXPLOSION PROOF
$166
PLASMA CUTTING OUTFIT, Electric (Greater than 1 inch Capacity)
$361
FAN, AIR RAISE, HARTZELL
$119
BURNER, MAGNETIC TRACK, CARRIAGE
$114
CRANE MATS 4X24
581
TORCH, BIG BERTHA
$26
CRANE MATS MANTIS
SAW, SAND, PORTABLE, ELECTRIC
MONITOR, CONSTANT (LEL, 02, CO) MSA 360 W! CALIBRATIOr`
$81
$at
$247
N0AIQESTRUC n4E-EXA4W=T.IQMEQi11P.MENT , ,'+ , , + , + +','+ +-I�
YOKE, MT, Y-6 $101
GUAGE, THICKNESS, UT
$311
MONITOR, (LEL, 02, H2S), MSA MINIGUARD III) W/ CALIBRATIO!
$247
X-RAY UNIT, RIGAKU„ 200 KVP, w/ SURVEY METERS
$431
MONITOR, LEL ONLY W/ CALIBRATION KIT
$247
X-RAY UNIT, RIGAKU,. 300 KVP, w/ SURVEY METERS
$545
VACUUM CI.EANER (55 GAL)
5158
BUGGY, ISOTOPE, w( SURVEY METERS
$34a
AIR BAG W/ CONTROLS & HOSE, 73 TON
$592
RECORDER, PVVHT, ESTERLINE
$545
RIVET BUSTER (90LB) WI BUGGY
$167
BUGGY, SHELL VERT C2Ca2 W/O MPS OR WELDING MACHINE
$3a0
BUGGY, SHELL VERT #2082 WITH MPS AND WELDING MACHID
$1.101
NOTES:
1. Rates for equipment not listed will be furnished as needed.
2. Rates do not include operator.
3. The weekly rates are based on 40 hours per week and 4 weeks per month.
Rates for over 40 hours per week will be prorated at 75% of the above rates.
Page 2 of 2
FormNumber: CMS -730 -01 -FM -02016 Issued For Use: 04 MAR 2016 Printed: 2/9/2017 8:24 AM
AUGUS` WIN TER & SONS, INC.
MECHANICAL CONTRACTORS
2323 NORTH ROEMER ROAD.-APPLETON, WI 54911
PO BOX 1898' APPLETON, VVI 54912
PHONE: 920-739-8881 " FAX: 920-739-2230
January 23, 2016
Marc Johnston
CHANGE {ORDER PRICE AND BREAKDOWN
ProjectlJob#: Oshkosh Marion Rd Water Tower 87216
Description: FO. 02 Change routing of water main
Our change order price and breakdown follows:
Auaust Winter
Material.......................................................
$ 9,111
Labor................:.... I..................... 44 hrs
$ 2,453 _
Direst Costs ............ ...................... .......... ..:..
$ 932
Equipment Rental ..........................................
$ 6,870
Indirect Costs ...............................................
$ 405
Subtotal.......................................................
$ 19,770
Overhead ....................................................
$ 2,966
Total..... ............. ......... 0 .......... .............
$ 22,736
Subcontracts
Total Subcontractor Costs........ ......................
$ -
Subcontractor Markup. ...................................
$ -
Total Subcontractor Costs wtoverhead...............
$ -
Total AWStSubcontractor Costs :...................... $ 22,736
ProfitlBond........................ ............. ...... $ _
Change Order Total ....................... $ 22,736
Time extension required is 3 days. This quotation based upon acceptance within 30 days.
Exclusions: 0
Derek Lewin
August Winter & Sons, Inc.
PH: 920-739-8881 FX: 920-739-2230
VISIT OUR WEB SITE AT WWW.AUGUSTWINTER.COM
Branch Once: $613 Schofield Avenue' Schofield, VVI 54476' PH: 715f355-7555' FAX: 7151355-9048
HVAC ' PLUMBING' TANK FABRICATION ' PROCESS PIPING `IND. SHEETMETAL
SPECIALTY METAL FAB.' ASME PRESSURE VESSELS' ASME CODE WELDING * 24 HR. SERVICE' ENGINEERING
STATE OF WISCONSIN LICENSED MASTER PLUMBERS, LICENSE NUMBER 227170
August WInter Sons, Inc.
Change Order/Small Projects Report
Project/Job#: Oshkosh Marion Rd Water Tower 87216
Description: FO. 02 Change routing of water main
MATERIAL
Material Credit w/restocking
Material ADD
Sales Tax
LABOR
General Foreman Hours
Foreman Hours
Field Plumber/Fitter Hours
Field Tanner Hours
Shop Hours
Operator Hours
DIRECT COSTS
Insurance & Taxes
Trucking
Testing & Cleaning
Balance Air/Water
Tools & Expendables
Shop Equipment Charge
Subsistence
.......................................
0.00
.......................................
$
9,111.00
0.0%
$
_
0.0
@
$ -
$
_
22.0
@
$ 56.99
$
1,253.78
22.0
@
$ 54.49
$
1,198.78
0.0
@
0.0
@
$ -
$
_
0.0
@
$ _
$
_
27.0% of Labor
5.0% of Labor
0.0% of Labor
0.0% of Labor
6.0% of Labor
$ 6.00 per shop hour
Equipment Excavator with opera 26.0 Hours @
Rental Dumptruck 8.0 Hours @
0.0 Hours @
0.0 Hours @
0.0 Hours @
0.0 Hours @
Indirect Costs
SUBCONTRACTS
NOTE: This change order does not address Impact costs on
base contract
Exclusions:
NOTE: This change
Time extension required is 3 days.
$ 235.00
$ 95.00
$ 662.19
$ 6,110.00
$ 760.00
Indirect Costs Total
Page 1
Date: 1123/2016
Change Order #: 1
Material Subtotal $ 9,111
Labor Subtotal $ 2,453
Total Contractor Costs
Overhead
Subtotal Contractor Costs
...................................... $ -
...................................... $`-
...................................... $�'
...................................... r--
Total Subcontractor Costs
Overhead
Subtotal Subcontractors Costs
Subtotal $ 932
Subtotal $ 6,870
$ 405
19,770
15.0% $ 2,966
-$x£,738'
10.0% $
Total Contractor/Subcontractor Costs $ 22,736
Profit 0.0% $ -
Bond 0-0y. T --
Total
-Total Amount Of Change 1 22,736
This quotation based upon acceptance within 30 days.
s order does not address impact costs on base contrail.
S:1AWS Pm*ts\Jobs & Work Orders187216 & 390172 Oshkosh Marion Rd Water Tower Replacement DLIPM1COs, CBs. & RFls\Changs OrderslFO.2
� 4. .. moo. -1., tie.. •- -- -- .- . .
Material & Labor Worksheet
Project Oshkosh Marion Rd Water Tower 87216 Date
Description: FO. 02 Change routing of water main
1/23/2016
Material Description
Qty
Each
Material
Total
Ea
Labor
Total
16" DI pipe
20
75.00
1500
$ -
16" MJ Valve
1
6061.00
6061
$ -
Manhole and casting
1
1050.00
1050
$ -
bacKII material
1
500.00
500
$ -
install extra 16" pipe
0
4.00
$ -
install extra valve
0
12.00
$ -
install manhole
0
12.00
$ -
Grub trees
0
16.00
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
0
$ -
9111
$ -
2/1/2017 2:52 PM
S:\AWS Pru0ct6Uobs & Work Orders\87216 & 390172 Oshkosh Marion Rd Water Tower Replacement DL\PM\COs, CBs, & RFls\Change
-_.,.tcn n .................4... .. _... -4--
CONTRACT FIELD ORDER (CFO)
RECEIVED --
MAR - Z 2018
DEPT OF PUBLIC WORKS
O
FIELD ORDER NO: 04 OSHKOSH, WISCONSIN
TO CONTRP;CTOR: Ch1 -cagy Bridge i£ Iron - -
PROJECT: Marion Road Water Tower Replacement PROJECTNO: 16-22
OWNER: City of Oshkosh
ENGINEER: CF12M
Provide additional tank roof support to permit welded closure of tank roof gap
i; To meat Wisconsin Administrative Code.
Contract Amount or Price Contract Tirnes (Calculate Days)
Ofiginal $ 3,624,000.00 Original Duration 730 Days
Previous Contract Modification(s) $ -Previous Contract - Days
(AddlDeduct) Modif icalion(s)
(Add/Deduct)
This Contract Modification $ 10,508.75 This Contract Modification 0 Days
(Add/Dedu;t) (AddfDeduct}
Revised Contract Amount $ Revised Contract Time 730 Days
The Revised. Contract Completion Date is:
% MIA
Own Contractor
Engineer Recommendation
By: r4, By: CB
Date: '�—I Date: s 2ely
By: CH2M L.�1" '
Date: 3 4-1 AUig
Peo)Ecr No. 681646
rc,
City of Oshkosh Contract No_ 16-22
Marion Road Water "foyer Replacement Project
Contractor: CB&I
Project Manager: Lance Jansen
Field Order 04
Description of Change Cost
Access tube roof detail
from collar to welded
correction. (Drawings
were complete for collar
detail)
Rev
CB&I Direct Costs $9,138'.04
Mark-up @ 15% $1,370.71.
Total $10,508.75'
Total Field Order 04
$10,508.75
Approved
Impact
Hours
Rate
Total
Engineering
39
$130.59
$5,093.01
Project Mgmt
6
$163.22
$979.32
Estimating
18
$12859
$2,314.62
Subcontract
2
$123.36
$246.72
Home Office
2
$83.96
$167.92
Tank Crew
3
$112.15
$336.45
$9,138.04
Sincerely,
Lanc Ja en
CB Inc.
Engineering - Procurement - Construction Since 1889
CB&I Inc.
14109 S. Route 59
Plainfield, IL 60544
Tel: 815-439-3100
Fax: 815439-3130
www.CBI.com
c tIfid'F't +'fir:
CONTRACT FIELD ORDER (CFO)
RECEIVED
!MAR - 7 2018
DEPT OF PUBLIC WORKS
FIELD ORDER NO: 05 OSHKOSH, WISCONSIN
TO CONTRACTOR. Chicago Bridge & Iron
PROJECT: Marion Road Water Tower Replacement PROJECT NO: 16.22 T
OWNER: City of Oshkosh
ENGINEER: CH2M
1. Replace ASTM A778 SST pipe for ASTM A312 SST,
1. To maetconstruction schedule constraints.
Contract Amount or Price Contract Tunes (Calculate Days)
Original 3 3,624,000.00 Original Duration 730 Days
Previous Contract Modification(s) 5 Previous Contract Days
(AddlDeduct) Modifications)
(Add(Deduct)
This Contract Modification
(A44/Deduct)
Revised Contract Amount
$ 9,975.00
This Contract Modification
{Add/Deduct)
0 Days
$ Revised Contract Time 730 Days
The Revised Contract Completion Date is:
,min
PROJECT NO, 681646
Contractor
Engineer Recommendation
By
Date. �7 — 2 D ($�
By: C8v--
/
Date: '/ -Z2 " i;t,,
By: CH2M s -l.
Date:
PROJECT NO, 681646
Fill, A
LN J Je
City of Oshkosh Contract No. 16-22
Mat -ion Road Water Tower Replacement Project
Contractor: CB&I
Project Manager: Lance Jansen
Field Order 05
Substitute ASTM A778
SST for ASTM A312 SST
SS Piping change of spec
Lump sum deduct
Material
CB&I Mark-up 5%
Total credit
Cost
$(9,975.00),
$ 9,500.00
$475.00
$9,975.00
CB&I Inc.
14109 S. Route 59
Plainfield, IL 60544
Tel: 815-439-3100
Fax: 815-439-3130
www.CBI.com
Original cost of the A312 12 SS pipe estimated for the job was $28,482. At the time or order the delivery
duration did not ineet our schedule., in order to to meet schedule we requested the use of A778 SS pipe
which was accepted. The difference in cost was nominal but the savings to CB&I in the schedule was
worth $ 10,000 so this is what was offered as a savings.
Sincerely,
�
e Janse CB& 1. Inc
Engineering - Procurement - Construction Since 1889
CONTRACT FIELD ORDER (CFO)
ECEIVED
DEPT OF PUBLIC WORKS
FIELD ORDER NO: 06 OSHKOSH, WISCONSIN
TO CONTRACTOR: Chicago Bridge & Iron
PROJECT: Marion Road Water Tower Replacement PROJECT NO: 16-22
OWNER: City of Oshkosh
ENGINEER: CH2M
t. Relocate buried watermain to avoid conflict with sewer
1. Piping conflict was identified during construction because sewer was not accurately located in the City GIS or project drawings..
Contract Amountor Price Contract Times (Calculate Days)
Original 1 3,624,000.00 Original Duration 730 Days
Previous Contract Modification(s) 1 Previous Contract Days
(Add/Deduct) Modification(s)
(Add/Deduct)
This Contract Modification
(AddiDeduct)
Revised Contract Amount
1 13,370.38
3
This Contract Modification 0 Days
(AddlDeduct)
Revised Contract Time 730 Days
The Revised Contract Completion Date is:
IniA
Owne
Contractor
Engineer Recommendation
BY:
Date: ?7 ' 2-0 --1 g �
By: CBIS
Date: 1'` `�� yr ry
By: CI-12ML-
Dale: —3/ t / D- 6, e
PROJECT No. 631646
City of Oshkosh Contract No. 16-22
Marion Road Water Tower Replacement Project
Contractor: CB&I
Project Manager: Lance Jansen
Field Order 06
Description of Change Cost
Install four (4)16" diameter
mechanical joint 45 degree
bends to avoid conflict with
sewer
CB&I Direct Costs from
Subcontractor $11,626.42
CB&I Mark-up 15% $1,743.96
Total Cost FO 06 $13,370.38
Sincerely,
��"anc risenCB&I, Inc.
14 i ' 1i
Engineering • Procurement • Construction Since 1889
CB&I Inc.
14109 S. Route 59
Plainfield, IL 60544
Tel: 815-439-3100
Fax: 815-439-3130
www.CBI.com
a
3
m
u;
ti
'o
0
m
5
ci
C 3
C
0
�m
L
N �
� �
O
v3
c m
y m
C �
O �
� W
?� �
7
IIII
IAI
I
�
iii
iiii�iunii
0
i
uuii��e
n
NINNIIIINII
IYI
II
�I�IIIIIII�
N
�Illlrll�ll
II�II
°
ilii
iuumun�
N
u�iu�
CONTRACT FIELD ORDER (CFO)
FIELD ORDER NO: 07
TO CONTRACTOR: Chicago Bridge & Iron
PROJECT: Marion Road Water Tower Replacement PROJECT NO: 16-22
OWNER: City of Oshkosh
ENGINEER: CH2M
RECEIVED
MAR m 7- 2018
DEPT OF PUBLIC WORKS
OSHKOSH, WISCONSIN
Provide and install 2 -foot tank vent extension and install between tank vent nozzle and vent. Fabricate extension of 1/4
inch steel. Blast, prime and paint per Section 09 90 00 Painting and Coating.
Provide additional clearance between vent inlet and accumulated snow.
Contract Amount or Price ContractTimes (Calculate (Days)
Original $ 3,624,000.00 Original Duration 730 Days
Previous Contract ldodification(s) $ Previous Contract Days
(A"Deducl) Modificallon(s)
(AddlDeducl)
This Contract Modification S 5,290.23 This Contract Modification 0 Days
iAddlDadus+) (AddfDeduct)
Revised Conlract Time
Revised Contract Amount $
The Revised Contract Completion Date is:
730 Days
GT.Y W
PRoJECr No. 681646
Contractor
Engineer Recommendation
BY"
Date: �7 — ZO l�
8y: C B & I
Date: TLo,le
By: C H 2 M
Dale:
PRoJECr No. 681646
CB&I Inc.
14109 S. Route 59
Plainfield, IL 60544
Tel: 815-439-3100
Fax: 815-439-3130
www.CBI.com
City of Oshkosh Contract No. 16-22
Marion Road Water Tower Replacement Project
Contractor: CB&I
Project Manager: Lance Jansen
Field Order 07
Description of Change Cost
Impact..
Hours
Rate
Total
Add tank vent extension
Engineering
6
$130.59
$783.54
Provide and intsall 2'-0" vent
extension from vent nozzle
to vent. Fabricate 1/4" steel,
blast prime and finish paint
per contract.
Project
$4,600.20
Management
6
$163.22
$979.32
Estimating
4
$128.59
$514.36
CB&I Mark-up 15% $690.03
Fabrication
4
$ 77.64
$310.56
Tank Field
4
$112.15
$448.60
(8 hours due to
multiple coats of
finish and cure
Total FO 07 $5,290.23
Paint Field
8
$112.15
$897.20
time between)
$3,933.58
Material including
paint
$462.62
Freight
$204.00
Lump sum
Total CB&I cost
$4,600.20
Paint material was an estimated material quantity and the freight
was estimated
as a shop cost to ship
the
extension to the project jobsite.
Sincerely,
/Lanc nse
&I, I c
Engineering • Procurement • Construction Since 1889