Loading...
HomeMy WebLinkAbout02. 18-249 MAY 8, 2018 18-249 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE FINAL RESOLUTION FOR SPECIAL ASSESSMENTS FOR STORM SEWER LATERALS RELATING TO CONTRACT NO. 18-20 AND CONTRACT NO. 18-04/VARIOUS LOCATIONS INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the Common Council of the City of Oshkosh held a public hearing on the 8th day of May, 2018, at 6:00 p.m. for the purpose of hearing all interested persons concerning the preliminary resolution and report of the City Manager (Board of Public Works) on the proposed improvements as listed below, pursuant to the initial resolution adopted April 24, 2018,by the Oshkosh Common Council of the following named streets: Storm Sewer Laterals: 1244 Wisconsin Street 1029 Windsor Street 1103 Windsor Street 1123 Windsor Street 1259 Walnut Street 1014 Reichow Street 980 Alpine Court 341 Rosalia Street 1727 Doemel Street 1616 Covington Drive 1625 Covington Drive 1812 Northpoint Street 1935 Vinland Street 221 Foster Street 1513 West 51h Avenue 1690 Deerfield Drive 1309 Ontario Street 2150 Allerton Drive 50 East Waukau Avenue 1610 Deerfield Drive 1650 River Mill Road 310 Waugoo Avenue The following properties are included in this year's program due to limited additional work required to provide a storm sewer connection: 1250 Wisconsin Street 1028 Windsor Street 985 Alpine Court 345 Rosalia Street 1613 Covington Drive 211 Foster Street 215 Foster Street 1642 River Mill Road 306 Waugoo Avenue MAY 8, 2018 18-249 RESOLUTION CONT'D NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh as follows: 1. That the proposed street grade(s), from a datum plane established by the official United States Coast and Geodetic Survey, as identified and on file in the Department of Public Works is/are hereby permanently established. 2. The Common Council for the City of Oshkosh hereby orders that new sidewalk be constructed according to the established grade pursuant to Section 66.0907 of the Wisconsin Statutes and the ordinances of the City of Oshkosh at the following locations: None 3. That the report of the City Manager, acting as the Board of Public Works, pertaining to the construction of the above described public improvements, including plans and specifications therefor, is hereby adopted and approved with the following modifications: a. b. C. 4. That the action of the City Manager in advertising for bids and to carry out the work of such improvements in accordance with the reports of the City Manager and in accordance with the said resolution heretofore adopted, is hereby approved, ratified and confirmed. 5. That payment for said improvements be made by assessing the cost to the property benefited as indicated in said report, except as modified herein. 6. Assessments shown on the report represent an exercise of the police power and have been determined on a reasonable basis and are hereby confirmed. 7. That the assessments for all projects included in said report are hereby combined as a single assessment but any interested property owners shall be entitled to object to each assessment separately or all assessments jointly for any purpose or purposes. MAY 8, 2018 18-249 RESOLUTION CONT'D 8. That the assessments may be paid in cash, or in installments pursuant to Section 25-83 thru 25-89 of the Oshkosh Municipal Code, said deferred payments to bear interest at the rate of six percent (6%) per annum on the unpaid balance. The City Clerk shall publish an installment assessment notice in accordance with Section 66.0715(3)(e) of the Wisconsin Statutes in the official newspaper of the City. 9. The City Clerk is directed to publish this resolution in the OSHKOSH DAILY NORTHWESTERN, the official newspaper of the City. 10. The City Clerk is further directed to mail a copy of this resolution to every property owner whose name appears on the assessment roll whose post office address is known or can with reasonable diligence be ascertained. April 27, 2018 Dear Property Owner: Please find enclosed the following documents for your information and review: A letter of explanation from Public Works Assistant Director Steven Gohde. 1A. Information sheet on parking during construction. 2. The Initial Resolution adopted by the Oshkosh Common Council, which began the process for the improvement(s) adjacent to your property. 3. Notice of Public Hearing to be held by the Oshkosh Common Council on May 8, 2018 regarding assessments, which will be set with the adoption of the final resolution, also scheduled for adoption on May 8, 2018. 4. Special assessment payment plan options explaining the payment choices after Contract No. 18-20 is certified as complete — payment choice or payment is not accepted at this time. 5. Assessment sheet indicating properties involved in the proposed project, the property footage, price per foot and estimated total assessment to the property. If you wish to appear before the Council before the final resolution is adopted to proceed with the construction, please refer to the "Notice of Public Hearing" enclosed. If you have any questions regarding the above listed documents, please contact the Public Works Department (236-5065) or the City Clerk (236-5011), Monday through Friday, 8:00 a.m. until 4:30 p.m. Sincerely, CITY OF OSHKOSH } PAMELA R. UBRIG City Clerk City of Oshkosh 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54902-1130 Pamela R. Ubrig . Y City Clerk f Angela l Oshkosh Deputy Ci Clerk Clerk Emily E. Karl Election Aide April 27, 2018 Dear Property Owner: Please find enclosed the following documents for your information and review: A letter of explanation from Public Works Assistant Director Steven Gohde. 1A. Information sheet on parking during construction. 2. The Initial Resolution adopted by the Oshkosh Common Council, which began the process for the improvement(s) adjacent to your property. 3. Notice of Public Hearing to be held by the Oshkosh Common Council on May 8, 2018 regarding assessments, which will be set with the adoption of the final resolution, also scheduled for adoption on May 8, 2018. 4. Special assessment payment plan options explaining the payment choices after Contract No. 18-20 is certified as complete — payment choice or payment is not accepted at this time. 5. Assessment sheet indicating properties involved in the proposed project, the property footage, price per foot and estimated total assessment to the property. If you wish to appear before the Council before the final resolution is adopted to proceed with the construction, please refer to the "Notice of Public Hearing" enclosed. If you have any questions regarding the above listed documents, please contact the Public Works Department (236-5065) or the City Clerk (236-5011), Monday through Friday, 8:00 a.m. until 4:30 p.m. Sincerely, CITY OF OSHKOSH } PAMELA R. UBRIG City Clerk CITY HALL 215 Church Avenue P.O. Box 1130 A Oshkosh, Wisconsin 54903-1130 City of Oshkosh -0- 1 O.fHKOIH April 27, 2018 Subject: Assessments for Storm Sewer Laterals (New and Relay) and Surface Drains Contract 18-20 To Property Owners on: ➢ WISCONSIN STREET ➢ WINDSOR STREET ➢ ALPINE COURT ➢ COVINGTON DRIVE ➢ VINLAND STREET ➢ DEERFIELD DRIVE ➢ EAST WAUKAU AVENUE ➢ WAUGOO AVENUE ➢ WALNUT STREET ➢ ROSALIA STREET ➢ FOSTER STREET ➢ ONTARIO STREET ➢ REICHOW STREET ➢ DOEMEL STREET ➢ NORTHPOINT STREET ➢ WEST 5TH AVENUE ➢ ALLERTON DRIVE ➢ RIVER MILL ROAD A public hearing is scheduled for Tuesday, May 8, 2018, in the Common Council Chambers at City Hall to consider improvements to your street. Staff will be available from 4:30 p.m. to 5:30 p.m. in Room 310 of City Hall to answer questions about the project and the estimated costs. Residents may also call the Department of Public Works Engineering Division at (920)236-5065 to have questions answered. The public hearing covers the proposed improvements, which include the following: storm sewer laterals and surface drains and the levy of special assessments that partially cover the cost of the improvements. Assessments are not due until the project is certified as complete and these charges can be paid by any one (1) of the plans as outlined by the City Clerk's information on payment plan options. Based upon the City of Oshkosh assessment policy, the assessable portions of the project have been identified and are outlined on the attached assessment worksheet(s). A. 1:\ Engineering \ 2018 CONTRACTS \ 18-20 Mini Storm \ Project_Information\ Correspondence \ Letters \ 18-20 Page 1 Of 3 641 Assessments Letter #1-_-27-18.docx The assessments are $750 or $400. The $750 assessment provides a storm sewer lateral onto the property and an eight -inch (8") diameter surface drain. The drain allows for sump pump discharges to be directed to the drain and collected. The $400 assessment is for property owners who have already coordinated work with the City and will hire a plumber to direct connect their sump pump discharges to the new lateral underground. The final assessment cost will not increase above the estimated total without another public hearing. Questions in regard to payment of Special Assessments can be answered by calling the City Clerk's office at (920)236-5011. Questions in regard to the construction project in general can be answered by calling the Department of Public Works Engineering Division at (920)236-5065. The sequence of construction has not yet been scheduled with a contractor. Residents will be notified approximately one (1) week before construction will begin on a particular property. All work within this contract is scheduled to be completed by the end of September 2018. The project construction consists of installation of storm sewers, laterals, and surface drains, as needed to accommodate drainage needs for the adjacent properties. If you know of any underground wires and/or piping (examples: invisible electric fence, conduit for exterior lighting, irrigation system, etc.) on your property which are located near the sidewalk, right-of-way, or driveways, please contact the Engineering Division as soon as possible. Any private improvements within the right-of-way, brick pavers, shrubs, lights, etc. will be removed by the Contractor during construction and will not be replaced. In the event you wish to replace certain items, a permit must be obtained from the Department of Public Works prior to your beginning the work. Prior to the completion of the project, all disturbed areas will be topsoiled, seeded, and covered with erosion mat. The property owner is responsible for watering the newly vegetated areas. The matting placed over the seed is biodegradable. Please do not remove the mat because it serves as mulch for the new grass. Please set your lawn mower to the highest setting when mowing the new grass areas until the new grass areas are well established. A Construction Access Agreement and Frequently Asked Questions handout was recently mailed to you. If the Construction Access Agreement is signed and returned to the City, a storm lateral will be installed onto your property and an eight -inch (8") diameter surface drain with a slotted drain cover will be placed into your yard, unless you coordinate direct connecting your sump pump. The storm sewer lateral and drain will allow you to direct drainage and/or sump pump hoses to this location. This drain is connected to the storm sewer system and drains directly to local streams and lakes. The lateral is to be used for "clear water" only. "Clear water" is typically groundwater discharged by a sump pump or runoff from precipitation (i.e. rainfall or snow melt). Do not place pet waste, yard waste, or other waste material into the storm sewer system. In the event conditions on the property prevent the installation of the drain (example: a substantial retaining wall), a drain will not be installed, but the storm sewer lateral will be installed underground to the property line. You will be receiving additional information about the storm sewer lateral and drain, including a telephone number for contact to coordinate the lateral's and drain's final location. The drain is part of your private lateral and it will be yours to maintain. The drain will have a fabric filter installed as a part of the construction. Please leave the filter in place until the grass surrounding the drain is well established. The fabric will prevent dirt and debris from filling the pipe until the grass is established. I:\ Engineering \ 2018 CONTRACTS \ 18-20 Mini Storm \ Project_Wonnation\ Correspondence \ Letters \ 18-20 Page 2 Of 3 Assessments Letter #1 427-18.docx If the City does not receive a signed Construction Access Agreement from you, the storm laterals will only be provided in the City's right-of-way, typically to the terrace area between the sidewalk and curb. -The 8" yard drain will not be installed. In the event you want the lateral extended in the future, the full cost of the work will be your responsibility. Additionally, any sidewalk removed to accommodate the construction will be patched. These property owners will be sent orders to replace the patched sidewalk with permanent concrete in 2019. These property owners will be financially responsible for replacing all patched concrete sidewalk. The City has implemented a way for you to receive project updates via e-mail. The updates will provide information about access and construction progress. To receive these updates, please send a blank e-mail to contract1820-subscribe@lists.ci.oshkosh.wi.us. You will receive an e-mail stating your subscription request has been received. You must reply to the message within five (5) days to complete the subscription. The City will stop sending updates upon completion of the project. If at any time you wish to unsubscribe, please send an e-mail to this address, contract1820- unsubscribe@lists.ci.oshkosh.wi.us. Please feel free to contact the Public Works Engineering Division at (920)236-5065 prior to the scheduled public hearing if you have any questions on the proposed assessments or the project construction. Sincerely, � Steven M. Gohde, P.E. Assistant Director of Public Works SMG/tlt Enclosures 1:\ Engineering\ 2018 CONTRACTS \ 18-20 Mini Storm \Project_Information\ Correspondence \ Letters \ 18-20 Page 3 Of 3 Assessments Letter #1 4-27-18.docx City of Oshkosh Police Department 420 Jackson Street Oshkosh, WI 54901 Tel: 920-236-5720 Fax: 920-236-5087 dsmith@ci.oshkosh.wi.us PROFESSIONALISM • PRIDE • INTEGRITY • TEAMWORK Dean Smith Chief of Police As per Sections 27-27, 27-28, and 27-29 of the Municipal Code of the City of Oshkosh, there is no parking on City streets, 2 AM to 5 AM, unless the owner of vehicle was granted permission or has purchased a City parking permit. If your street or sidewalk is under construction, it is NOT necessary to obtain a parking permit if you park your car within two blocks of the street under construction. All City ordinances and parking rules/guidelines must be followed, and all posted parking restrictions, including time zones and no parking areas, must be obeyed. You will need to follow the odd -even rules. On odd days of the week, the vehicle should be parked on the side of the street with odd -numbered houses. On even days of the week, the permit holder should park on the side of the street with even -numbered houses. Each night, the car should be parked on the opposite side of the street as the night before. NOTE: Odd and even dates are figured before midnight. If parking is only allowed on one side of the street, the Odd -Even rule DOES apply. Vehicles can only park on the side of the street that does not have restricted parking and are only allowed to park overnight on the appropriate Odd -Even days. In the case of a declared Snow Emergency, parking on City streets is restricted to one side of the street using the Odd -Even rule with dates figured from noon on the calendar date to noon on the following calendar date. It is the responsibility of the vehicle owner/operator to find appropriate parking in the event of a snow emergency. Vehicles in violation of snow emergency parking will be towed at the owner's expense. Disabled vehicles are not allowed to park overnight at anytime and should be moved within 24 hours. Motor busses, truck tractors, semi -trailers and motor trucks designed, used, or maintained primarily for the transportation of property as defined in Municipal Code 27-260 are not permitted to park overnight on City streets. All street parking is subject to the following guidelines: • May not park in signed / designated "No Parking" areas. • Vehicles may not stop or park in a designated "Fire Lane". • No parking within 10 feet of a fire hydrant (an official traffic sign may indicate a greater distance is required). • No parking in loading zones. • No parking within 4 feet of an alley or private roadway or driveway. • No parking within 15 feet to the near limits of a crosswalk. Failure to follow the above rules could result in parking citations being issued. Individuals wishing to appeal a parking citation may do so by completing a Request to Review Parking Citation form which is available at the Oshkosh Police Department Telecommunications Desk, on the Police Department website (oshkoshpd.com) or on the City of Oshkosh website. The Mission ofthe Oshkosh Po/ice Department is to promote pub/ic safety and to enhance the quaiilyofiife in ourcommunitythrough innovative po/inngandcommunitypartnerships APRIL 24, 2018 18-210 #2 RESOLUTION (CARRIED 6-0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE INITIAL RESOLUTION FOR SPECIAL ASSESSMENTS FOR STORM SEWER LATERALS RELATING TO CONTRACT NO. 18- 20 AND CONTRACT NO. 18-04 / VARIOUS LOCATIONS INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED BY the Common Council of the City of Oshkosh as follows: 1. The Common Council hereby declares its intention to exercise its police power under Section 66.0703 and 66.0705 of the Wisconsin Statutes to levy special assessments upon property within the following described areas for benefits conferred upon such property by improving the following: Storm Sewer Laterals: 1244 Wisconsin Street 1123 Windsor Street 980 Alpine Court 1616 Covington Drive 1935 Vinland Street 1690 Deerfield Drive 50 East Waukau Avenue 310 Waugoo Avenue 1029 Windsor Street 1259 Walnut Street 341 Rosalia Street 1625 Covington Drive 221 Foster Street 1309 Ontario Street 1610 Deerfield Drive 1103 Windsor Street 1014 Reichow Street 1727 Doemel Street 1812 Northpoint Street 1513 West 5th Avenue 2150 Allerton Drive 1650 River Mill Road The following properties are included in this year's program due to limited additional work required to provide a storm sewer connection: 1250 Wisconsin Street 345 Rosalia Street 215 Foster Street 1028 Windsor Street 1613 Covington Drive 1642 River Mill Road 985 Alpine Court 211 Foster Street 306 Waugoo Avenue 2. The total amount assessed against such district shall not exceed the total cost of the improvements and the amount assessed against any parcel shall not be greater than the benefits accrued thereto from said improvements. APRIL 24, 2018 18-210 RESOLUTION CONT'D 3. The assessments against any parcel may be paid according to the provisions of Section 25-83 through 25-89 of the Oshkosh Municipal Code. 4. The governing body determines that the improvements constitute an exercise of the police power for the health, safety, and general welfare of the municipality and its inhabitants. 5. The Board of Public Works is directed to prepare a report consisting of: (a) Final plans and specifications for said improvements. (b) An estimate of the entire cost of the proposed work or improvements. (c) An estimate as to each parcel of property within the assessment district of: (1) The assessment of benefits to be levied for each improvement. (2) The damages to be awarded for property taken or damages by each improvement. (3) The net amount of benefits over damages or the net amount of damages over benefits for each improvement. (4) The total assessment against each parcel Upon completion of such report, the Board of Public Works is directed to file a copy thereof in the City Clerk's Office for public inspection. 6. Upon receiving the report of the Board of Public Works, the City Clerk is directed to give notice of a public hearing on such reports as specified in Section 66.0703(7)(a) of the Wisconsin Statutes. The hearing shall be held before the Common Council at the Council Chambers, Room 406 in the City Hall at a time set by the Clerk in accordance with the Wisconsin Statutes. The assessment against any parcel may be paid in cash, paid with the first property tax installment, or in ten (10) installments if the total amount of the assessment is greater than five hundred dollars ($500.00) or fifteen (15) installments if the total amount of the assessment is greater than one thousand dollars ($1000.00). 7. The installation of said street improvements shall be accomplished according to the provisions of Section 25-3 through 25-11 of the Oshkosh Municipal Code. #3 NOTICE OF PUBLIC HEARING Office of the City Clerk, City of Oshkosh, Winnebago County, Wisconsin: Please take notice that the City Council of the City of Oshkosh has declared its intention to exercise its power under Section 66.0703(7)(a) of the Wisconsin Statutes, to levy assessments upon property for benefits conferred upon such property by providing the following improvements fronting upon the following described streets: 1244 Wisconsin Street 1123 Windsor Street 980 Alpine Court 1616 Covington Drive 1935 Vinland Street 1690 Deerfield Drive 50 East Waukau Avenue 310 Waugoo Avenue STORM SEWER LATERALS 1029 Windsor Street 1259 Walnut Street 341 Rosalia Street 1625 Covington Drive 221 Foster Street 1309 Ontario Street 1610 Deerfield Drive 1103 Windsor Street 1014 Reichow Street 1727 Doemel Street 1812 Northpoint Street 1513 West 5th Avenue 2150 Allerton Drive 1650 River Mill Road The following properties are included in this year's program due to limited additional work required to provide a storm sewer connection 1250 Wisconsin Street 345 Rosalia Street 215 Foster Street 1028 Windsor Street 1613 Covington Drive 1642 River Mill Road 985 Alpine Court 211 Foster Street 306 Waugoo Avenue The report of the Public Works Director and City Manager showing proposed plans and specifications, estimated costs of improvements, proposed assessments and awards of damages is on file in the Office of the City Clerk and can be inspected there on any business day between the hours of 8:00 a.m. and 4:30 p.m. Notification that the City Manager (Board of Public Works) and City Council will hear all persons interested or their agents or attorneys concerning the matters in the preliminary resolutions authorizing awards of damages at 6:00 p.m. in the Council Chambers in the City Hall, Oshkosh, Wisconsin on MAY 8, 2018. All objections will be considered at said hearing and thereafter the amount of assessment will be finally determined. CITY OF OSHKOSH PAMELA R. UBRIG PUBLISH: 4/28/2018 CITY CLERK SPECIAL ASSESSMENT PAYMENT PLAN OPTIONS AFTER CONTRACT NO. 18-20 IS CERTIFIED AS COMPLETE CONTRACT NO 18-20 WILL CONSIST OF 1244 Wisconsin Street 1.123 Windsor Street 980 Alpine Court 1616 Covington Drive 1935 Vinland Street 1690 Deerfield Drive 50 East Waukau Avenue 310 Waugoo Avenue STORM SEWER LATERALS 1029 Windsor Street 1259 Walnut Street 341 Rosalia Street 1625 Covington Drive 221 Foster Street 1309 Ontario Street 1610 Deerfield Drive 1103 Windsor Street 1014 Reichow Street 1727 Doemel Street 1812 Northpoint Street 1513 West 511, Avenue 2150 Allerton Drive 1650 River Mill Road The following properties are included in this year's program due to limited additional work required to provide a storm sewer connection 1250. Wisconsin Street 345 Rosalia Street 215 Foster Street 1028 Windsor Street 1613 Covington Drive 1642 River Mill Road 985 Alpine Court 211 Foster Street 306 Waugoo Avenue Included in this mailing, is an estimated amount (quantities and costs) of the special assessment (sheet #5) against your property or properties. A statement of the same is on file in the office of the City Clerk. Once Contract No. 18-12 is certified as complete by the Public Works Department, the final amount (quantities and costs) of the special assessment against your property or properties will be mailed to you. At that time you will also receive the paperwork to select a payment choice for the special assessments. PAYMENT CHOICE OR PAYMENT IS NOT ACCEPTED AT THIS TIME. THE PAYMENT OPTIONS SHEET YOU WILL RECEIVE AFTER THE CONTRACT IS CERTIFIED AS COMPLETE WILL HAVE THE FOLLOWING OPTIONS: INVOICE - PAYMENT WITHIN 30 DAYS If you choose this option, the City of Oshkosh will then send you a special assessment invoice and you must make payment within thirty days of that notice. If the payment is not made within thirty days after receiving the special assessment invoice, 6% interest accrues from the date of notification. read other side If after making this selection, the property owner fails to make payment to the City Treasurer; the entire amount including interest will be placed on the next property tax bill. TOTAL ASSESSMENT ON NEXT TAX BILL IN FULL Property owners may elect to pay 100% of the assessment on the next designated real estate property tax bill, without interest. The total amount of the assessment will be included on and payable in conjunction with the next designated property tax bill. TEN ANNUAL INSTALLMENT PAYMENTS ON PROPERTY TAX BILL (ASSESSMENT MUST BE IN EXCESS OF $500.00) The amount of the assessment will be placed on the property tax bill with interest at 6% on the unpaid balance per year over the ten- (10) year period. The annual assessment payment and interest will be included in each year's tax bill payment. The assessment balance may be paid in full at any time during the ten-year period, with interest pro -rated to the month of payment. (Applies to assessments in excess of $500.00.) FIFTEEN ANNUAL INSTALLMENT PAYMENTS ON PROPERTY TAX BILL _ (ASSESSMENT MUST BE IN EXCESS OF $1,000.00) The amount of the assessment will be placed on the property tax bill with interest at 6% on the unpaid balance per year over the fifteen- (15) year period. The annual assessment payment and interest will be included in each year's tax bill payment. The assessment balance may be paid in full at any time during the fifteen -year period, with interest pro- rated to the month of payment. (Applies to assessments in excess of $1,000.00.) CITY OF OSHKOSH PAMELA R. UBRIG CITY CLERK read other side z WISCONSIN ST 1244 1250 filename: 1244, 1250 Wisconsin dwq PAGE 1 OF 2 CITY OF OSHKOSH STORM LATERAL ASSESSMENT ENGINEERING DIVISION CONTRACT NO. DRAWN 18-20 03-16-2018 WISCONSIN STREET GRAPHIC a 25 so 100 SCALE:(IN FEET) 1244. 1260 N15CONSIN ST. 1 wFEEr PARCEL I.D. DESCRIPTION OWNER REQUESTED STORM SEWER ADDRESS TOTAL LATERAL ._ 12-0314-0000. ____.___1250 WISCONSIN ST _._ ..___......_GEOFFREY.L/CHRISTINE..M._HANSON___.._.._.__.....__........__...._.._....__......__.__...______........____........._No............_.._.... ... _....... ___....__$750:x.__....._...... _.. - .............. 12-0313-000 . _......_.. ______....__..._.. _.._...____...._.__._..__..........�.. _. ........... TOTALS $1,150.00 $1,150.00 2018 ASSESSMENT RATES: PAGE 2 OF 2 CITY OF OSHKOSH STORM SEWER LATERAL NEW STORM SEWER LATERAL WITH DRAIN = $750.00 EACH ENGINEERING DIVISION SPECIAL ASSESSMENT NEW STORM SEWER LATERAL WITHOUT DRAIN = $400.00 EACH CONTRACT NO. DRAWN 18-20 3/19/2018 WISCONSIN STREET WARD REVISED 1244, 1250 WISCONSIN ST 12TH ♦, z 1123 113 1029 WINDSOR ST. 1028 filename: Windsor addresses.dwg PAGE 1 OF 2 CITY OF OSHKOSH STORM LATERAL ASSESSMENT ENGINEERING DIVISION CONTRACT N0. DRAWN 18-20 03-16-2018 WINDSOR STREET I GRAPHIC 0 25 s0 ios SCALE:(IN FEET) 1028, 1029, 1103 & 1123 WINDSOR ST. i way - goo rtrr N I I I I I WA0000 AVE. I I I � in I I I orT— filename: Wauqoo03.dwo PAGE 1 OF 2 CITY OF OSHKOSH ENGINEERING DIVISION STORM LATERAL ASSESSMENT CONTRACT N0. I DRAWN 18-04 02-20-201 e WAUG00 AVENUE GRAPHIC 0 xs so 100 306,310 WAUG00 AVE SCALE:(IN FEET) I \ I I I 308 310 I PARCEL I.D. DESCRIPTION OWNER REQUESTED STORM SEWER ADDRESS TOTAL LATERAL 02-0053-0000 _ 306 WALIGOO AVE _ CRAIG J DELORME NO 750.00 -- $750.00______....___.._..__....__._.__.. 02-0054-0000 310 WALIGOO AVE JEREMY P/LORI A HERZOG YES $750.00 $750.00 TOTALS $1,500.00 $1,500.00 2018 ASSESSMENT RATES: PAGE 2 OF 2 CITY OF OSHKOSH STORM SEWER LATERAL NEW STORM SEWER LATERAL WITH DRAIN = $750.00 EACH ENGINEERING DIVISION SPECIAL ASSESSMENT CONTRACT NO. DRAWN 18-04 2/20/2018 WAUGOO AVE WARD REVISED 306,310 WALIGOO AVE 2ND N 9 ALPINE CT. gas Y// filename: 980,985 Al ine Ct.dwq PAGE 1 OF 2 CITY OF OSHKOSH STORM LATERAL ASSESSMENT ENGINEERING DIVISION CONTRACT 40.DRAWN 18-20 Oa -19-2018 ALPINE COURT GRAPHIC SCALE: (IN FEET) 980, 985 ALPINE CT. i e+a - iao rm ♦� z z D q, 0 ELz 0 D 341 345 z/ ROSALIA ST. i filename: 341,345 Rosalia St.dwg PAGE 1 OF 2 CITY OF OSHKOSH sTaua LATERAL ASSESSMENTENGINEERING DIVISION CONTRACT NO. DRAWN 18-20 03-19-2016 ROSALIA STREET GRAPHIC 0 25 W 100 SCALE: (IN FEET) � 341. 345 ROSAUA ST. I INCH m 100 FEET PARCEL I.D. DESCRIPTION OWNER REQUESTED STORM SEWER ADDRESS TOTAL LATERAL 02-0513-0000 341 ROSALIA ST CHAD/MINDY K WILDERMAN YES 02 0512-0000 345 ROSALIA ST ADAM A SASSE NO 2018 ASSESSMENT RATES: NEW STORM SEWER LATERAL WITH DRAIN = $750.00 EACH TOTALS CITY OF OSHKOSH ENGINEERING DIVISION CONTRACT NO. DRAWN 18-20 3/19/2018 WARD REVISED $1,500.00 $1,500.00 PAGE 2 OF 2 STORM SEWER LATERAL SPECIAL ASSESSMENT ROSALIA STREET 341, 345 ROSALIA ST 0 z 0 z v 1825 1613 MANGTON DR. 1616 filename: 162516,13 Covin ton Dr.dwq PAGE 1 OF 2 CITY OF OSHKOSH STORM LATERAL ASSESSMENT ENGINEERING DIVISION CONTRACT NO. DRAWN 18-20 03-19-2018 COVINGTON DRIVE I GRAPHIC o 25 50 loo SCALE: (IN FEET) 1625, 1618, k 1613 COMNGTON DR. I NG a IM FEET P� Z I I ' I I 217 221 215 211 FOSTER ST. uj a 4J filename: foster02.dwg PAGE 1 OF 2 CITY OF OSHKOSH STORM LATERAL. ASSESSMENT ENGINEERING DIVISION CONTRACT NO. DRAWN 18-20 03-16-2018 FOSTER STREET GRAPHIC o ze M wo SCALE: (IN FEET) 211. 215. k 221 FOSTER ST. PARCEL I.D. DESCRIPTION OWNER REQUESTED STORM SEWER ADDRESS TOTAL LATERAL 06-0709-0000 211 FOSTER ST DAVID J/PATRICIA A GANNON NO X750.00 X750.00 06-0708-0000 215 FOSTER ST JOHN C KOCH ETAL $750.00 X750.00 06-0707y0000 221 FOSTER ST DAVID WEGNER_...._.._._......___.._._.__-----.___ _ . __. _._------------ . . . .. ..$750.00 X750.00 TOTALS $2,250.00 $2,250.00 2018 ASSESSMENT RATES: PAGE 2 OF 2 CITY OF OSHKOSH STORM SEWER LATERAL NEW STORM SEWER LATERAL WITH DRAIN = $750.00 EACH ENGINEERING DIVISION SPECIAL ASSESSMENT CONTRACT NO. DRAWN 18-20 3/19/2018 FOSTER STREET WARD REVISED 211, 215, & 221 FOSTER ST 6TH a� s 0 J _J RIVER MILL RD 1642 1650 Illenome: River MiII16.dw PAGE 1 OF 2 CITY OF OSHKOSH STORM LATERAL ASSESSMENTENGINEERING DIVISION CONTRACT N0. I DRAWN 18-20 04-13-2018 RIVER MILL ROAD GRAPHIC 0 25 50 ioo SCALE: (IN FEET) 1842, 1650 RIVER MILL RD. 1 INCIi 100 FEET PARCEL I.D. DESCRIPTION 12-2407-0000 1642 RIVER MILL RD 12-2408-0000 1650 RIVER MILL RD JAMES W SHELDON J LASKY 2018 ASSESSMENT RATES: NEW STORM SEWER LATERAL WITH DRAIN = $750.00 EACH NEW STORM SEWER LATERAL WITHOUT DRAIN = $400.00 EACH OWNER REQUESTED STORM SEWER ADDRESS TOTAL LATERAL WINDHAUSEN NO TOTALS $1,150.00 $1,150.00 PAGE 2 OF 2 CITY OF OSHKOSH STORM SEWER LATERAL ENGINEERING DIVISION SPECIAL ASSESSMENT CONTRACT NO. DRAWN 18-20 4/13/2018 RIVER MILL ROAD 1642, 1650 RIVER MILL ROAD WARD REVISED SPRUCE ST 0 1259 WALNUT ST filename: 1259 Walnut St.dwq PAGE 1 OF 2 CITY OF OSHKOSH STORM LATERAL ASSESSMENT ENGINEERING DIVISION CONTRACT NO. I DRAWN 04-17-2018 WALNUT STREET 18-20 GRAPHIC D 25 w 100 SCALE: (IN FEET) 1!! 1259 WALNUT ST. 1 INQ1 700 FEET PARCEL I.D. DESCRIPTION 12-0604-0000 1259 WALNUT ST 2018 ASSESSMENT RATES: KELLI HESS NEW STORM SEWER LATERAL WITHOUT DRAIN = $400.00 EACH OWNER REQUESTED YES TOTALS CITY OF OSHKOSH ENGINEERING DIVISION CONTRACT NO. DRAWN 18-20 4/17/201 WARD REVISED STORM SEWER ADDRESS TOTAL LATERAL $400.00 $400.00 PAGE 2 OF 2 STORM SEWER LATERAL SPECIAL ASSESSMENT WALNUT STREET 1259 WALNUT ST a� z REICHOW ST 1014 WINDSOR ST filename: 1014 Relchow St.dwg PAGE 1 OF 2 CITY OF OSHKOSH STORM LATERAL ASSESSMENT ENGINEERING DIVISION CONTRACT N0. DRAWN 18-20 04-17-2018 REICHOW STREET GRAPHIC 0 25 W 70o SCALE: (IN FEET) 1014 REXHOW ST. t ina - io0 F¢T PARCEL I.D. DESCRIPTION 13-0975-0000 1014 REICHOW ST 2018 ASSESSMENT RATES: OWNER STEVEN M/REBECCA A MOELLER NEW STORM SEWER LATERAL WITHOUT DRAIN = $400.00 EACH REQUESTED YES TOTALS CITY OF OSHKOSH ENGINEERING DIVISION CONTRACT NO. DRAWN _ 18-20 _ 4/17/2018 WARD REVISED 13TH STORM SEWER ADDRESS TOTAL LATERAL $400.00 $400.00 PAGE 2 OF 2 STORM SEWER LATERAL SPECIAL ASSESSMENT REICHOW STREET 1014 REICHOW ST ♦, z 1727 DOEMEL ST filename: 1727 Doemel St. dwq PAGE 1 OF 2 CITY OF OSHKOSH STORM LATERAL ASSESSMENT ENGINEERING DIMSION CONTRACT N0. I DRAWN 18-20 o4-17-2018 DOEMEL STREET GRAPHIC o 25 50 100 SCALE: 1727 DOEMEL ST. (IN FEET) I rc�a� - ioo FM PARCEL I.D. DESCRIPTION 15-1423-0000 1727 DOEMEL ST 2018 ASSESSMENT RATES: OWNER THOMAS J/ALEXANDRA E KLOECKL NEW STORM SEWER LATERAL WITHOUT DRAIN = $400.00 EACH REQUESTED YES TOTALS CITY OF OSHKOSH ENGINEERING DIVISION CONTRACT NO. DRAWN 18-20 4/17/201 WARD REVISED STORM SEWER ADDRESS TOTAL LATERAL $400.00 $400.00 PAGE 2 OF 2 STORM SEWER LATERAL SPECIAL ASSESSMENT DOEMEL STREET 1727 DOEMEL ST N � o z z a o a In _N cr OD z .Z E MURDOCK AVE filename: 1812 Northpoint St.dwg PAGE 1 OF 2 CITY OF OSHKOSH STORM LATERAL ASSESSMENT ENGINEERING DIVISION CONTRACT N0. DRAWN 18-20 o4-17-2018 NORTHPOINT STREET I GRAPHIC a 25 w tm SCALE: FEET) 1812 NORTHPOINT ST. (IN t iaa-too Fm I PARCEL I.D. DESCRIPTION OWNER REQUESTED STORM SEWER ADDRESS TOTAL LATERAL 15-2181-0000 1812 NORTHPOINT ST BARRY 2018 ASSESSMENT RATES: NEW STORM SEWER LATERAL WITHOUT DRAIN = $400.00 EACH N YARBRO YES 400.00 .............._...................................................................................................................................................................................................._�....................................................$400 :00 TOTALS $400.00 $400.00 PAGE 2 OF 2 CITY OF OSHKOSH ENGINEERING DIVISION STORM SEWER LATERAL SPECIAL ASSESSMENT CONTRACT NO. DRAWN 18-20 4/17/2018 NORTHPOINT STREET 1812 NORTHPOINT ST WARD REVISED 15TH Z MITCHELL ST e z 0 0 0 D m 1935 VINLAND ST -T7 L filename: 1935 Vinland St.dwg PAGE 1 OF 2 CITY OF OSHKOSH STORM LATERAL ASSESSMENT ENGINEERING DIVISION CONTRACT N0. I DRAWN 18-20 o4-17-2018 \INLAND STREET GRAPHIC 0 25 50 100 SCALE: (IN FEET) � 1 INCH m 100 i 1935 VINLAND STF= PARCEL I.D. DESCRIPTION OWNER REQUESTED STORM SEWER LATERAL ADDRESS TOTAL 12-1601-0000 1935 VINLAND ST 2018 ASSESSMENT RATES: DOUGLAS A INDEMER YES TOTALS $400.00 $400.00 PAGE 2 OF 2 NEW STORM SEWER LATERAL WITHOUT DRAIN = $400.00 EACH CITY OF OSHKOSH STORM SEWER LATERAL ENGINEERING DIVISION SPECIAL ASSESSMENT CONTRACT NO. DRAWN 18-20 4/17/2018 VINLAND STREET WARD REVISED 1935 VINLAND ST N 2 m D m W 5TH AVE 1513/ filename: 1513 W 5th Ave.dw PAGE 1 OF 2 CITY OF OSHKOSH STORM LATERAL ASSESSMENT ENGINEERING DIVISION CONTRACT NO. DRAWN 18-20 04-17-2018 W. 5TH AVENUE GRAPHIC a u 60 100 SCALE: (IN FEET) 1813 W 6TH AVE 1 PARCEL I.D. DESCRIPTION OWNER REQUESTED 06-1095-0000 1513 W 5TH AVE ERIK D/ TONIA A SAWICKI YES ....................................................................................................................................-...................--._.................................................................................................................................... - 2018 ASSESSMENT RATES: NEW STORM SEWER LATERAL WITHOUT DRAIN = $400.00 EACH TOTALS CITY OF OSHKOSH _ ENGINEERING DIVISION CONTRACT NO, DRAWN 18-20 4/17/2018 WARD REVISED STORM SEWER ADDRESS TOTAL LATERAL $400.00 $400.00 PAGE 2 OF 2 TORM SEWER LATERAI SPECIAL ASSESSMENT WEST 5TH AVENUE 1513 W 5TH AVE N MARICOPA DR m 0 DEERFIELD DR 114 44 a 9R,f. O,Q filename: 161090 Deerfield Dr.dw 1 PAGE 1 OF 2 CITY OF OSHKOSH STOW) LA70M ASSESW NT ENGINEERING DIVISION CONTRACT NO. DRAWN 18-20 04-17-2018 DEERFIEW DRIVE GRAPHICo sa w leo 1610. 1690 DEERFiF1D OR SCALE:(IN FEET) PARCEL I.D. DESCRIPTION OWNER REQUESTED STORM SEWER ADDRESS TOTAL LATERAL „13-2031-0000 1690 DEERFIELD DR ANDREW K/EMMA M HILL $750.00 750.00 13-2023-0000 1610 DEERFIELD DR CHARLES A/ANNA M HILL JR $400.00 $400.00 ...........----.........-_-...-__...........__.................. I......__......___...._..... _..._...._.._....._........ YES TOTALS $1,150.00 $1,150.00 2018 ASSESSMENT RATES: PAGE 2 OF 2 CITY OF OSHKOSH STORM SEWER LATERAL NEW STORM SEWER LATERAL WITH DRAIN = $750.00 EACH ENGINEERING DIVISION SPECIAL ASSESSMENT NEW STORM SEWER LATERAL WITHOUT DRAIN = $400.00 EACH CONTRACT NO. DRAWN 18-20 4/13/2018 DEERFIELD DRIVE WARD REVISED 1690, 1610 DEERFIELD DR z WESTERN ST ONTARIO ST PAGE 1 OF 2 PARCEL I.D. DESCRIPTION OWNER REQUESTED 12-0815-0000 1309 ONTARIO ST KEITH A/DANA A KOCH YES ................................ ......._..........................................................................................................-........................................... __ 2018 ASSESSMENT RATES: NEW STORM SEWER LATERAL WITHOUT DRAIN = $400.00 EACH TOTALS CITY OF OSHKOSH ENGINEERING DIVISION CONTRACT NO. DRAWN 18-20 4/17/2018 WARD REVISED STORM SEWER ADDRESS TOTAL LATERAL $400.00 $400.00 PAGE 2 OF 2 STORM SEWER LATERAI SPECIAL ASSESSMENT ONTARIO STREET 1309 ONTARIO ST ALLERTON DR PAGE 1 OF 2 PARCEL I.D. DESCRIPTION OWNER REQUESTED STORM SEWER ADDRESS TOTAL LATERAL 13-1742-0000 2150 ALLERTON ...DR .........................._LOIS.....MENZEL........................................... .................... ........................................................... .............. ... .......... .........................................._YES.................................................. ...$750.00 $750.00 ..........._..._...........-..................................... -............................. ........ TOTALS $750.00 $750.00 2018 ASSESSMENT RATES: PAGE 2 OF 2 CITY OF OSHKOSH STORM SEWER LATERAL NEW STORM SEWER LATERAL WITH DRAIN = $750.00 EACH ENGINEERING DIVISION SPECIAL ASSESSMENT CONTRACT NO. DRAWN 18-20 4/17/2018 ALLERTON DR WARD REVISED 2150 ALLERTON DR N 50 E WAUKAU AVE a J Q 2 U O J O filename: 50 E Waukau Ave.dwg PAGE 1 OF 2 CITY OF OSHKOSH STORM LATERAL ASSESSMENT ENGINEERING DIVISION CONTRACT N0. DRAWN 18-20 o4-18-2018 EAST WAUKAU AVENUE I GRAPHIC 0 25 50 100 SCALE: (IN FEET) 50 E WAUKAU AVE 1 MQ1 100 FEET PARCEL I.D. DESCRIPTION OWNER REQUESTED STORM SEWER ADDRESS TOTAL LATERAL 1 ........................................ ........................................._... .... 2018 ASSESSMENT RATES: NEW STORM SEWER LATERAL WITHOUT DRAIN = $400.00 EACH TOTALS CITY OF OSHKOSH ENGINEERING DIVISION CONTRACT NO. DRAWN 18-20 _ 4/17/2018 WARD REVISED 14TH $400.00 $400.00 PAGE 2 OF 2 STORM SEWER LATERAL SPECIAL ASSESSMENT EAST WAUKAU AVENUE 50 E WAUKAU AVE