Loading...
HomeMy WebLinkAbout0103342-Building (garage roof)OSHKOSH ON THE WATER Job Address 1703 N MAIN ST Designer Category Type Zoning 141 - Exterior Remodeling CITY OF OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD Owner JOSEPH/YVONNE S JAJTNER Create Date Contractor SERVICE TEAM OF PROFESSIONALS FOX VA Plan · Building (~ Sign (~ Canopy (~ Fence Q Raze Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 (~ Pier (~) Other O Treated Wood Flood Plain # Dwelling Units 0 Unfinished/Basement 0 Sq. Ft. Finished/Living 0 Sq. Ft. Garage 0 Sq. Ft. Foundation · Poured Concrete (~) Floating Slab (~) Concrete Block (~ Post Occupancy Permit Park Dedication No 103342 08/06/2003 Size [] Projection j Canopies Signs Height Permit # Structures 0 0 Use/Nature of Work IFR/ Repair garage roof that was damaged by a tree. All work shall comply with applicable codes. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1,826.00 Plan Approval $0.00 Permit Fee Paid Issued By: ~ ~ [] PermitV°ided I ~~work pursuant to rules governing the described construction. In the performance Signature 7~-~f? ~ ( ~'~/-'- - ~ AgentJOwner Address PO BOX 7165 APPLETON $25.00 Park Dedication $0.00 Date 08/06/2003 Final/O.P. 00/00/0000 WI 54912 - 0000 Telephone Number 920-830-8612 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity.