Loading...
HomeMy WebLinkAbout0104591-Building (landing/steps) t � CITY OF OSHKOSH No 104591 y gC,;,, OF'r '``.,� } OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD 10�� € ON THE WATER �, ) ;� Job Address 213 IDA AVE Owner TRACY L OWENS Create Date 10/06/2003 r� / Designer Contractor OWNER Category 141 -Exterior Remodeling Plan Type � Building � Sign � Canopy � Fence 0 Raze I Zoning Class of Const: Size Unfinished/Basement _ 0 Sq.Ft. Rooms 0 Height 0 Ft. ❑ Projection I Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq.Ft. Baths 0 Signs 0 Foundation � Poured Concrete � Floating Slab � Pier 0 Other � Concrete Block � Post 0 Treated Wood Occupancy Permit Flood Plain Height Permit � Park Dedication #Dwelling Units 0 #Structures 0 - Use/Nature FR/ Replacing the front steps with a Landing minimum 3'x 3'and steps with risers not exceeding 8"rise and treads a minimum of 9" � of Work eep and 36"wide. The landing shail be provided with frost protection. Owner given handout for stairs. � E ' - - -- - ---J HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $500.00 Pian Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Issued By: Date 10/O6/2003 Final/O.P. 00/00/0000 � Permit Voided� In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the perrnit applicant to contact the easement holder(s)and to secure ny necessary approvals re starting such activity. Signature ����,G� ,��2-�" Date ����J�`�—� � AgenUOwner Address 1152 BERLIN RD MARSHALL WI 53559 - 9471 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.