HomeMy WebLinkAbout0104591-Building (landing/steps) t
� CITY OF OSHKOSH No 104591 y
gC,;,,
OF'r '``.,� }
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD 10�� €
ON THE WATER �, ) ;�
Job Address 213 IDA AVE Owner TRACY L OWENS Create Date 10/06/2003 r� /
Designer Contractor OWNER
Category 141 -Exterior Remodeling Plan
Type � Building � Sign � Canopy � Fence 0 Raze I
Zoning Class of Const: Size
Unfinished/Basement _ 0 Sq.Ft. Rooms 0 Height 0 Ft. ❑ Projection I
Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0
Garage 0 Sq.Ft. Baths 0 Signs 0
Foundation � Poured Concrete � Floating Slab � Pier 0 Other
� Concrete Block � Post 0 Treated Wood
Occupancy Permit Flood Plain Height Permit �
Park Dedication #Dwelling Units 0 #Structures 0 -
Use/Nature FR/ Replacing the front steps with a Landing minimum 3'x 3'and steps with risers not exceeding 8"rise and treads a minimum of 9" �
of Work eep and 36"wide. The landing shail be provided with frost protection. Owner given handout for stairs. �
E
' - - -- - ---J
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $500.00 Pian Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00
Issued By: Date 10/O6/2003 Final/O.P. 00/00/0000
� Permit Voided�
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work
described in this permit application within an easement,the City strongly urges the perrnit applicant to contact the easement
holder(s)and to secure ny necessary approvals re starting such activity.
Signature ����,G� ,��2-�" Date ����J�`�—�
�
AgenUOwner
Address 1152 BERLIN RD MARSHALL WI 53559 - 9471 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.