Loading...
HomeMy WebLinkAbout0104586-Building (sign) CITY OF OSHKOSH wo 104586 � �GA�,,r OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD °F�'�1o�a''' ON THE WATER ,,�^` r � ' Job Address 145 N EAGLE ST Owner SIMEANNA SOUTH INC Create Date 10/06/2003 ' Designer Contractor JONES SIGN Category 254-Signs Plan Type 0 Building � Sign � Canopy � Fence � Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. � Projection � Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq.Ft. Baths 0 Signs 0 Foundation � Poured Concrete � Floating Slab � Pier � Other 0 Concrete Block 0 Post � Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 Use/Nature Retirement Home/Install a 7'tall monument ID sign,7'8"x 3'6"irreg shape non-illuminated sign mounted between pillars. Also install a of Work irectional sign at N Westfield entrance. i ' HVAC Contractor Plumbing Contractor Electric Contractor Fees: Val ion , $4,500.00 Plan Approval $0.00 Permit Fee Paid $40.00 Park Dedication $0.00 Issued By: Date 10/06/2003 Final/O.P. 00/00/0000 � Permit Voided� ` In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the Ciry strongly urges the permit applicant to contact the easement holder(s)and to secure�r%y�iiecessary appr�ls before s�ting such actiYif�r -�' � �- � ..-� ��' -'" Signature � �_..��` G_-� C-";� ���__ / �_,._;�`- Date /�O 0 __ E AgenUOwner ;'^ Address 711 HINKLE ST GREEN BAY L WI 54303 -4733 Telephone Number 920-494-6740 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.