HomeMy WebLinkAbout0104586-Building (sign) CITY OF OSHKOSH wo 104586
� �GA�,,r
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD °F�'�1o�a'''
ON THE WATER ,,�^` r � '
Job Address 145 N EAGLE ST Owner SIMEANNA SOUTH INC Create Date 10/06/2003 '
Designer Contractor JONES SIGN
Category 254-Signs Plan
Type 0 Building � Sign � Canopy � Fence � Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. � Projection �
Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0
Garage 0 Sq.Ft. Baths 0 Signs 0
Foundation � Poured Concrete � Floating Slab � Pier � Other
0 Concrete Block 0 Post � Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication #Dwelling Units 0 #Structures 0
Use/Nature Retirement Home/Install a 7'tall monument ID sign,7'8"x 3'6"irreg shape non-illuminated sign mounted between pillars. Also install a
of Work irectional sign at N Westfield entrance.
i
'
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Val ion , $4,500.00 Plan Approval $0.00 Permit Fee Paid $40.00 Park Dedication $0.00
Issued By: Date 10/06/2003 Final/O.P. 00/00/0000
� Permit Voided� `
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work
described in this permit application within an easement,the Ciry strongly urges the permit applicant to contact the easement
holder(s)and to secure�r%y�iiecessary appr�ls before s�ting such actiYif�r -�' �
�- � ..-� ��' -'"
Signature � �_..��` G_-� C-";� ���__ / �_,._;�`- Date /�O 0 __
E
AgenUOwner ;'^
Address 711 HINKLE ST GREEN BAY L WI 54303 -4733 Telephone Number 920-494-6740
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.