HomeMy WebLinkAboutItem IV PLAN COMMISSION STAFF REPORT MAY 1,2018 ITEM IV: SPECIFIC IMPLEMENTATION PLAN AMENDMENT FOR A MIXED-USE SITE LOCATED AT 851 SOUTH MAIN STREET GENERAL INFORMATION Owner/Petitioner: Bridgeview Holdings LLC—Will Steiner Action(s)Requested: The petitioner requests an amendment to the Specific Implementation Plan approval for a mixed-use site located at 851 South Main Street. Applicable Ordinance Provisions: Planned Development standards are found in Section 30-387 of the Zoning Ordinance. Background Information Property Location and Type: On April 22,2008,the Common Council approved a Planned Development for the block bounded by South Main Street,West 8th Avenue, Nebraska Street, and West 91"Avenue for a multi-family development on the western portion of the site and renovation of the existing 4-story building (formerly Miles Kimball) on the east side of the site. The multi-family development to the west of the subject site was constructed in 2008 per the approved Plarmed Development. The Miles Kimball building was never renovated,but the surrounding facility was razed in 2006 according to prior building permit records. The approximate 0.83 acre site includes a 4-story structure built in 1900, according to City Assessor information. The site was formerly used for light manufacturing/industrial purposes (Miles Kimball) and is now vacant. The surrounding area contains a mix of industrial, commercial and residential uses.The subject property is located within the South Shore East redevelopment area which is generally located on the south side of the Fox River from the west side of South Main Street to Lake Winnebago, with the southern boundary of 161h Avenue;and is immediately west of the area being identified as the "Sawdust District." Subject Site E:ristin . Land Ilse Zoning Vacant Industrial (former Miles Kimball) CMU-PD Adjacent Land Use and Zoning E.-cistim Uses Zoning North Vacant UMU _ South Mixed commercial/residential CMU East Vacant RMU West Multi-family residential CMU-PD Cartr telrerisiue'Plrrrt Laird Use Recotrturelydrrtiott Laud Use 10 Year Land Use Recommendation Mixed-_Use Downtown 20 Year Land Use Recommendation Mixed-Use Downtown ANALYSIS Use The previously approved Planned Development of the site was for renovation of the site for commercial use on the ground floor and residential units on floors 2-4 as well as an optional ground floor patio.The applicant is proposing to renovate the building to include two tenant spaces on the first floor that will either be a restaurant or retail space along with two patios on the south side of the building, office spaces on floors 2-4, and rooftop addition(511,floor)for a bar (50 patrons or less)and patio area. The proposed mix of uses is permitted in the Central Mixed Use district. The proposed use is consistent with the 10-year and 20-year Comprehensive Land Use Plans, as the area is identified as appropriate for mixed-use downtown development due to the subject site's proximity to the central city.The proposed renovation meets the guidelines of the South Shore Fast redevelopment area and is generally consistent with the approved Planned Development for the site with minor changes to the site design and use of the building. Per the applicant's narrative, the hours of operation and number of employees are currently pending based on prospective tenants for the building. Traffic generation will also be determined once final tenants are identified. Site Design&Access/Parking The petitioner is proposing various revisions to the approved site design. Three building additions are being proposed which include a mechanical room on the northwest corner of the building, a glass enclosed stair and elevator tower on the west end of the building, and a glass enclosed stair tower on the south side of the building. The mechanical room will include the sprinkler rise and electrical service and will be screened to match the building exterior. The stair and elevator towers are needed to allow vertical transportation outside the original building footprint and will also provide additional building articulation. Two concrete patios are being proposed for the south side of the ground floor retail/restaurant uses with each having a wood framed pergola,where the original plan only had one larger ground floor patio area. Staff does not have concerns with this change. The petitioner is proposing a reduction of parking area,from 52 spaces to 40 spaces. This reduction is necessary to accommodate the western(stair/elevator) addition and proposed dumpster enclosure placement. Staff does not have concerns with this change as the Central Mixed Use District does not require off-street parking. Furthermore, the change from residential units to office spaces should result in lesser demand for off-street parking. The parking area will be accessed from West 811,Avenue with the driveway generally in the same place as originally approved. The proposed dumpster enclosure will be located in the northwest corner of the parking lot. A base standard modification is required as the enclosure will be closer to West 81h Avenue than the principal structure,where code does not allow dumpster enclosures in front yard areas. Staff is supportive of ITEM IV-CUPISIP Anreud merit—857 S blain St. 2 the proposed location as the site has three frontages resulting in little, if any,feasible area that is accessible. Additionally,the materials of the enclosure will match with building materials for a more attractive appearance than wood. The sidewalk connection to the residential development to the west has been removed. However, two additional connections to the public sidewalk are proposed on the south side of the building for access to the stair tower and restaurant use, along with a connection on the east side of the building from South Main Street. A dedicated loading zone is not included. According to the applicant, deliveries will be made outside of peak hours. A straight or van truck will access the site using the same route and turning radius as a refuse pick-up truck. Street parking is allowed on W. 81h Avenue which will allow any deliveries made from a semi to be made via wheeled dolly from W. W,Avenue. A base standard modification will be needed as code requires a designated loading area. Staff is supportive of a base standard modification as large deliveries should be relatively infrequent. Lighting The proposed photometric plan exceeds the maximum allowable lighting level(0.5 footcandles)along the north, east,southeast, and south property lines. Staff is supportive of a base standard modification to allow the excess lighting as it does not spill over onto adjacent properties,but only onto public right-of-way areas. Signage Conceptual signage plans have been submitted which include wall signage on the north, south,and east facades, with three(3) signs per facade. According to the plans,the north and south facades each have 148' of lineal building frontage with 240 sq. €t.of wall signage proposed for each facade. The east facade has 45' of lineal building frontage with 82.5 sq. ft. of wall signage proposed. The zoning ordinance allows for a maximum of 1 sq. ft.of wall signage per linear foot of building frontage. The total wall signage area on all three facades exceeds the maximum allowance and will need to be reduced to meet code. The signage can be addressed under a separate building permit. The applicant may apply for a base standard modification to exceed maximum wall signage allowance at a later date,but will require more detailed signage plans. Landscaping A detailed landscaping plan has been submitted. The Central Mixed Use district is exempt from landscaping requirements for building frontages,street frontages,and yards,but must meet landscaping requirements for provided paved areas. The landscape plan is missing three(3) tall deciduous trees required at parking row ends and is slightly deficient on required paved area landscaping points required for tall/medium trees. Provision of the required parking row island trees should satisfy this requirement. These changes can be addressed during the site plan review process. Stormwater Management The application states that the grading of the proposed site has been revised from the previously approved SIP to provide the required quality treatment for the redevelopment on the site. The bio- retention area to the west will not be utilized as previously intended. ITEM JV-CUPISIPAniendment—851 Shlain St. 3 The Department of Public Works reviewed the plans and noted that the project must demonstrate that the water quality treatment and stormwater management system for the adjoining property to the west is not adversely impacted by this project. This also can be addressed during the site plan review process. Bu lding The proposed building facades will be similar to what was originally approved,with some minor additions/revisions. New glass enclosed stair/elevator towers are being added to the south and west facades. The petitioner feels that these additions will enhance the appearance of the building by providing"massing" to the original industrial structure and the exposed steel features enhance the industrial aesthetic. The petitioner also notes that"eyebrow" details have been added over the new windows for the first floor tenant spaces and the new punched windows along the north and south facades have been revised to create better rhytlun and symmetry. New canopies have been added to the north and west entrances to aid in entrance identification and wood framed open air pergolas are proposed over the patio areas. These features consist of brick piers with stone caps,exposed steel columns and beams,with wood fascia. Encroachment agreement(s) will be required as portions of pergola and canopy extend over the public right-of-way along the east and southeast property lines. The proposed rooftop addition(51h floor) will be consistent with the materials of the building and includes wood pergolas over the patio area. The petitioner feels that this adds additional articulation to the overall facades. The Central Mixed Use Design Standards state that the height of buildings shall be compatible with existing buildings in the immediate area which conform to the design theme of the area, as determined by Plan Commission. As the overall building height is being increased,it is up to Plan Commission to determine if the proposal is consistent with the buildings in the immediate area. Staff is supportive of the proposed changes to the building plan as the additions/revisions seem to only enhance the appearance of the facades. FINDINGS/RECOMMENDATION/CONDITIONS In its review and recommendation to the Common Council on an application for a Planned Development district, staff recommends the Plan Commission make the following findings based on the criteria established by Chapter 30-387(C)(b): (a)The proposed Planned Development project is consistent with the overall purpose and intent of this Chapter. (b)The proposed Planned Development project is consistent with the City's Comprehensive Plan and other area plans. (It is the responsibility of the City to determine such consistency.) (c)The proposed Planned Development project would maintain the desired relationships between land uses,land use densities and intensities, and land use impacts in the environs of the subject site. ITEM I V-CUPISIP Amendment—851 S Main Sl. 4 (d)Adequate public infrastructure is or will be available to accommodate the range of uses being proposed for the Planned Development project, including but not limited to public sewer and water and public roads. (e)The proposed Planned Development project will incorporate appropriate and adequate buffers and transitions between areas of different land-uses and development densities/intensities. (f)The proposed Planned Development project design does not detract from areas of natural beauty surrounding the site. (g)The proposed architectu re and character of the proposed Planned Development project is compatible with adjacent/nearby development. (h)The proposed Planned Development project will positively contribute to and not detract from the physical appearance and functional arrangement of development in the area. (i)The proposed Planned Development project will produce significant benefits in terms of environmental design and significant alternative approaches to addressing development performance that relate to and more than compensate for any requested exceptions/base standard modifications variation of any standard or regulation of this Chapter. (j)For Planned Development projects that are proposed to be developed in phases, the applicant can provide a timeline for development and can demonstrate that the project would be successful even if all phases were not or could not be completed. Staff recommends approval of the Specific Implementation Plan,with the findings listed above and the proposed following conditions: 1. Base standard modification to allow a dumpster enclosure between the building and public street. 2. Base standard modification to allow a commercial use without a designated loading area. 3. Base standard modification to allow lighting levels to exceed 0.5 footcandles at the north,east, southeast, and south property lines. 4. Final Iandscaping plan approval by the Department of Community Development. 5. Encroachment agreement be drafted for pergolas and canopies extending over public right-of- way and recorded with the Winnebago County Register of Deeds. ITERI IV-CUPISIP,,menehnent--851 S blain St. 5 SUBMIT TO: 'An City Of Oshkosh Dept,of Community pevelopment City 215 Church Ave.,P,O,Box 1 230 of Planned Development Application Oshkosh,WI 54901 Oshkosh PHONF:(920)236-5059 For General Development Plan or Specific Implementation Plan "PLEASE TYPE OR PRINT USING BLACK INK** APPLICANT INFORMATION Petitioner: Bridgeview Holdings LLC - Will Steiner Date: 04/02/18 Petitioner's Address: 300 Ohio Street City: Oshkosh state: WI zip: 54902 Telephone #: (920) 277-6576 Fax: ( } Other Contact # or Email: WIII@Wsteiner.com Status of Petitioner (Please Check)[Qr/kreenlafive a Tenant Prospective Buyer Petitioner's Signature (required): Date: 4/2/2018 OWNER INFORMATION Owner(s):_ Bridgeview Holdings LLC - Will Steiner Date: 04/02/18 Owner(5) Address: 300 Ohio Street _ City: Oshkosh ____State: Wl zip: 54902 Telephone #: (920) 277-6576 Fax: ( } Other Contact # or Email: 54902 Ownership Status (Please Check): t_!individual Trust Partnership Corporation Property Owner Consent:(required) By signature hereon,]/We acknowledge that City officials and/or employees may, in the performance of their functions, enter upon the property to inspect or gather other information necessary to process this application. I also understand that all meeting dates are tentative and may be postponed by the Planning Services Division for incomplete submissions or other administrative reasons. Property Owner's Signature: Same as applicant Date: TYPE OF REQUEST: ❑ General Development Plan (GDP) ❑ General Development Plan (GDP) Amendment ❑Specific Implementation Plan (SIP) ®Specific implementation Plan (SIP) Amendment SITE INFORMATION A.ddress/Location of Proposed Project: 851 South Main Street Proposed Project Type: Office - Floors 2,3,4 and Restaurant/ Retail - Floors 1 and 5 Current Use of Property, Vacant Building zoning: CMU-PQ Land Uses Surrounding Your Site: North: Vacant/ Commercial South: Commercial East: Vacant West: Multi-family Residential It is recommended that the applicant meet with Planning Services staff prior to submittal to discuss the proposal. ➢ Application fees are due at time of submittal.Make check payable to City of Oshkosh. ➢ Please refer to the fee schedule for appropriate fee. FEE IS NON-REFUNDABLE For more information please visit the City's website at www.ci.oshkosli.wi.us/Community_Development/Pfant)ing.htn) Page 6 Staff Date Rec'd • Specific treatment and location of recreational and open space areas, including designation of any such areas to be classified as common open space. a Proposed grading plan. ❑ Specific landscaping plan for the subject site, specifying the location, species, and installation size of plantings. The landscaping plans shall include a table summarizing all proposed species. a Architectural plans for any nonresidential buildings, multi-family structures, or building clusters, other than conventional single-family or two-family homes on individual lots, in sufficient detail to indicate the floor area, bulk, and visual character of such buildings. ❑ Engineering plans for all water and sewer systems, stormwater systems, roads, parking areas, and walkways. o Signage plan for the project, including all project identification signs, concepts for public fixtures and signs, and group development signage themes that may or may not vary from City standards or common practices. a Specific written description of the proposed SIP including: Specific project themes and images. • Specific mix of dwelling unit types and/or land uses. • Specific residential densities and nonresidential intensities as described by dwelling units per acre, and landscaping surface area ratio and/or other appropriate measures of density and intensity. • Specific treatment of natural features, including parkland. • Specific relationship to nearby properties and public streets. • Statistical data on minimum lot sizes in the development, the precise areas of all development lots and pods; density/intensity of various parts of the development; building coverage, and landscaping surface area ratio of all land uses; proposed staging; and any other plans required by Plan Commission. • A statement of rationale as to why PD zoning is proposed.This statement shall list the standard zoning requirements that, in the applicant's opinion,would inhibit the development project and the opportunities for community betterment that are available through the proposed PD project. • A complete list of zoning standards that would not be met by the proposed SIP and the location(s) in which such exceptions/base standard modifications would occur. • Phasing schedule, if more than one development phase is intended. ❑ Agreements, bylaws, covenants, and other documents relative to the operational regulations of the development and particularly providing for the permanent preservation and maintenance of common open areas and amenities. ❑ A written description that demonstrates how the SIP is consistent with the approved GDP and any and all differences between the requirements of the approved GDP and the proposed SIP. I hereby certify that to the best of my knowledge all required application materials are included with this application. I am aware that failure to submit the required completed application materials may result In denial or delay of the application request. Applicant's Signature (required): Date: 4/2/2018 Q Page 7 3 A" On' April 2, 2018 EXCEL ARCHITECTS•ENGINEERS•SURVEYORS Project Narrative Project: Bridgeview Holdings 851 South Main Street Oshkosh, WI Bridgeview Holdings, LLC is requesting Specific Implementation Plan (SIP) Amendment & Encroachment approval for the renovation of an existing vacant building located at 851 South Main Street into a mixed-use space containing office, restaurant and retail tenants. The property is currently zoned CMU-PD. The property is part of an approved General Development Plan on the block bounded by South Main Street, West 8th Avenue, Nebraska Street and West 9f" Avenue in the South Shore Redevelopment Project Area. The west portion of the block contains townhouses and the proposed renovation project is on the eastern portion of the block. Surrounding land uses include: vacant and commercial to the north, south and east and multi-family residential to the west. The proposed project will be compatible with the surrounding zoning, which includes: Urban Mixed Use (UMU) to the north, Riverfront Mixed Use (RMU) to the east, Central Mixed Use (CMU) to the south, and Central Mixed Use wl PD Overlay (CMU-PD) to the west. The property currently consists of an existing (4) story 24,524 sq. ft. (5,131 sq. ft. per floor) vacant building and gravel and grass lawn area. The building renovation will include offices on floors 2, 3 and 4 and potential restaurant and retail space on floors 1 and 5. The following building additions are proposed: 4,205 sq. ft. (5) story stair and elevator tower (841 sq. ft. per floor) to the west, 1,813 sq. ft. roof top addition and 1,385 sq. ft. (5) story stair tower (277 sq. ft. per floor) to the south. . .. Proposed exterior building modifications are designed to pay homage to its manufacturing past and bring back to life this century old industrial building by capturing the current mixed use trend while reclaiming and enhancing the existing industrial building with Spartan brick massing and steel applique. Because of these modifications and additions, a conceptual building code narrative has been included with the proposal to show the intent of how this facility will meet the building code. These modifications. will include: • All the existing painted exterior brick will be tuck-pointed, bead blasted and sealed to bring back their original industrial aesthetic • New punched window openings along the north and west.facades o Include proportions and details from turn of the century industrial buildings • New entrance canopy to identify the north entrance o Brick piers with stone caps o Exposed steel columns and beams o Wood fascia o Enhances the existing industrial appearance • New mechanical room and mechanical screen on the northwest facade o A mechanical room to include the sprinkler riser, electrical service o Provide opaque screening to a ground mounted mechanical unit. Screening will match the building exterior. • New eyebrows over new windows on the first floor tenant spaces o Brick piers with stone caps o Exposed steel columns and beams o Wood fascia o Enhances the existing industrial appearance • New glass enclosed stair and elevator tower addition on the west end o Massing to enhance the original industrial building o Details to create a turn of the century appearance o New canopy to identify the west entrance o Exposed steel structure to enhance the industrial aesthetic o Stair and elevator to provide vertical transportation outside the original building mass • New glass enclosed stair tower on the south o Massing to enhance the original industrial building o Details to create a turn of the century appearance o New canopy to identify the west entrance o Stair and elevator to provide vertical transportation outside the original building mass • New patios from the first floor tenant spaces along south facade with entrances from the two first floor tenant spaces • Wood framed open air pergola over the patios o Brick piers with stone caps o Exposed steel columns and beams o Wood framing members to provide shade over patios ................. o Enhances the existing industrial appearance • New roof top patios and bar o Will create spaces that allow users to view the lake, river and downtown o Adds additional articulation to the overall facades The hours of operation and number of employees is currently pending based on the tenant mix for the building. Traffic Generation can also be determined once final tenants are identified. The building renovation will be a positive change to the area. The redeveloped property will fit with the character of the existing neighborhood and there will be no`negative impact on neighbors. This development will also create an excitement to the downtown neighborhood by providing a facility that will provide modern conveniences and services while not forgetting Oshkosh's historic manufacturing past. SIP Narrative Requirements: • Specific project themes and images o The proposed development, in an effort to be respectful to the buildings manufacturing history, is a blend of turn of the century charm and modern day amenities. With the reclamation of the original brick facade and addition of exposed steel structured glass stair tower additions, this facility will provide users with a sense of its storied past while furnishing the comforts of modern day amenities. • Specific mix of land uses o The proposed uses will include restaurants, retail spaces and office space. These uses and services will be a needed addition to a developing and growing area. • Specific residential densities and nonresidential densities as described by dwelling units per acre, and landscaping surface area ratio and/or other appropriate measures of density and intensity. o The proposed 31,927 sq. ft. facility with include 17,181 sq. ft. of space for office use, and 6,849 sq. ft. of space for either restaurant or retail space. The proposed site will include 25.4% open space and 74.6% impervious surface. The exterior lighting on the site will meet the code requirements and provide an inviting atmosphere for the public. Site lighting plans are included with the SIP amendment submittal. • Specific treatment of natural features o The major natural feature on the property is the existing four story brick building. The proposed development will reclaim the original brick and enhance the original industrial building with exposed steel structural and elements. • Specific relationship to nearby properties and public streets o The existing building is centrally located on the east side of the site and will remain in its current location. Parking areas are proposed on the west and north sides of the building as previously intended on the existing SIP. ...:.................... ..... ....... . • Statistical data on minimum lot sizes in the developmdnt,the`.precise areas of all development lots and pads; dens itylintensty of various parts of the development; building coverage, and landscaping surface area ratio of all land uses; proposed staging; and any other plans required by Plan Commission. o The existing lot is 36,316 sf(0.83 ac)and contains a 6,170 sf(0.14 ac) building and 12,002 sf,(0.28 ac) of gravel for a total of 0.42 acres of impervious coverage (50%) and 0.42 acres of open space (50%). The proposed site will contain a building footprint of 7,400 sf(0.17 ac), 19,702 sf (0.45 ac) of impervious surfaces,.and. 9,211 sf (0.21 ac) of open space. Based on the surface coverages,the proposed site is comprised of 74.6% impervious surfaces, and 25.4% open. space. The proposed driveway will .. be in generally the same location as the current SIP that will be amended.'. f r.''�'r',��y�� .s„�S.s',"l-^��la,�,„-�3�st..., ' �Yi✓%r''.���,"`�'"' �f,`��.9?� .3'�w�,.- ® A statement of rationale as to why PD zoning is proposed. This statement shall list the standard zoning requirements that, in the applicant's opinion, would inhibit the development project and the opportunities for community betterment that are available through the proposed PD project. o The proposed SIP is a revision to the previously approved SIP; however the proposed revisions made to the development will provide much needed services and amenities to the downtown neighborhood. In addition, the proposed site generally follows the previously approved SIP with minor modifications to the layout. • A complete list of zoning standards that would not be met by the proposed SIP and the location(s) in which such exceptions/base standard modifications would occur, o Section 30-191(E)(2)(b) — Refuse or Recycling Enclosures ■ Dumpster enclosure is located in the front setback • The proposed property has street frontage on three sides. Finding a compliant location is difficult if not impossible. In an effort to comply with the intent of the ordinance, the proposed dumpster enclosure materials will match the existing building materials including adding brick piers. Dumpster enclosure detail is provided with submittal. o Section 30-54(G) • Minimum Pavement Setback • The patio concrete on the southeast corner of the building is located within the 5' pavement setback. The proposed location creates no adverse conditions to the public. o Section 30-114 (B)(3) ■ Permitted Projects into All Required Yards • Several eyebrows, a brick pier, and some signage are proposed to encroach into the right of way along the eastern side of the site. Because the existing historic building is currently built on the east right of way line, any additions or amenities along the east facade will need.to extend in the ........................................... .. right of way. This will create no foreseen.adverse effects to the public are created and aide in the overall industrial design of the development. An encroachment request is being made with the SIP amendment for these items. o Section 30-190 ■ Lighting Levels • We are not meeting the required lighting levels at the north property line to the public street. Due to the proximity of the pro line from aur proposed g ro osed li ht pole location we are property not able to meet this requirement. We are meeting the required levels to the west property line to the neighboring property. The site spillover is not onto neighboring properties and into right of way providing greater visibility for the public. ��' 1�;.'���_ '�"L?2�a� ,� r � ��t� � r���� r.�;J r�,v`Li"z'���r '��`.r�•P�r'`'`%r�,F'f��z�. F"z� ,���"�n�r�n V;;..�.._ f ��/ �:m � 0 8 a _ �7' �- � .:,e -•,>r.;n�. 2"r6, v�1.�.�;-.,,,-' ,6., r.':�t.�M.�, .ar<r,r r,. .�1��'.,v _ s..: - �G r ra �� ,:,�;- c -:Ga ;.r1 -��_'h��:-L;•, ��i rrv � .r'''. ;;-.�� r��� -ice?�s,x:...,, ��°.�_ �''`' _�'' `r� .r- '�?r�,, _••�S. r r S. � 6 trf,:�Y pp�,�rc.-i&* y•aG.f'` v',,.;:.L:�'✓ -.F. �r; �-_r�' � ✓'I,s'�,,s, ,� .! ,`- '' ,f', e� � P�'- - '.;�;, f 3 y' yy gg J (' a.31a r5u^✓.'�-'. -y t r- '!'Y'r' ` �,; ci'- -',.,,r_ v -;:'?.,.,a s - yam" -' fel i; s- v;l4 .S '�.4 d�9 � ,, k„(", .!� r' z.s �.z..�-„�'�...'s- _:�,r.uE^P�- r..��...�'�',,`; a..E ✓- .�,,Er c.�a , x., ��,r. -�. � '�' - �: z� •x r. ,# 1 `r{ .-�r ,-X.J�r F -� s�Y''.r .a,�,;,;%5�=.,;r'•3`' s r. ?��;.:�;�1�" •.,, .�_,.. ,a .�.9,.,p' (. ra �H,rf S�-_ 2, 1- .l'�9.;�'..u�_-{Yd �'r ' r '�-'-moi / -r ✓ r. r% -r�?rzt�:i�C�<�'�r `✓vr + ` .,�"^ r ;� c, ,� r -^''� f e�°,�.',r'��.!t�,ll.�y.,z�� '�, rx=y�� i- �✓., e. �<r=-^3�.,� .;�,.„,,.._ .� �'^-��,�,C%�Vit.. .�,. s'xs'.j..u�sr.�::�s�.� ..J� �r� �--"l.�,�u'a�,u'r2�e� -v-3��w-'ti`-��Y.'uzr=.:.� `��lva_3� , -rr.�.� .'.v.^ i.=r�Z��s:-c-���`-r„�-,�'".�"�s,. -:^.���a✓' � �t��"'. s .w o Section 30-176 ■ Loading Zone ® A dedicated load zone area is not proposed on the site. Deliveries will be planned to be made outside of peak hours. A straight or van truck can access the site using the same route and turning radius as a refuse pick-up truck. Street parking is allowed on 8th Street. This will allow semi deliveries to be made via wheeled dolly from 81h Street. Phasing Schedule o The proposed project is planned for 1 phase. e How is this SIP consistent with the approved GDP and any and all differences between the requirements of the approved GDP and the proposed SIP. o The proposed SIP differs from the approved SIP in following ways; ■ The existing building will include glass stair tower additions to allow vertical transportation outside the original footprint and create additional articulation to the existing building massing. ■ New entrance canopies at the north and west entrances have been added to aid in the identification of the building entrances. ■ Eyebrow details have been added to the first floor windows to add to the articulation of the existing facade. ■ Two patios on the south side of the two retail 1 restaurant uses with wood framed pergola will shade these uses. ■ Punch windows along the north and south facades have been revised to create better rhythm and symmetry and provide focus on the new entrance canopy on the north fagade and the glass stair tower on the south. ■ The uses of the development have been changed to include restaurants, retail, and office. ■ Additional signage has been added to aide in the identification of ..................... the proposed commercial uses. The proposed signage will meet current zoning regulations. Locations and square footage is provided on the plans that are included with the submittal. - ■ Roof top bar and patio addition has been added to provide users with a view of the lake, river and the downtown skyline ■ The design of the dumpster enclosure has been changed to be more consistent with the overall development. The.materials of the dumpster are consistent with the building materials • The lighting of the brick fagade_has been revised to accent the new building rhythm and symmetry created by the.punched window locations. - . ■ The amount of parking has been reduced from 52 spaces on the current SIP to 40 on the proposed:SIP. ■ The sidewalk connection to the residential development to.the west has. been removed. Pedestrians from the.residential development ✓,,.r":,,p y{. 4 `` .,iyp .,q > i f a 1 i s q p , .,P', taF .j F�1�'r„s V e' 0"t A _ i4 S 7”" i ..��-..i„ ��`` �'� ii`-5 c -`'x, r':?,- �'":. k.,� : r � r'z'`.,1� r �'r r-r,-d���,. '--..rr �i'g3s -r-h. �f,. :$r �, ,•.!r ��>. >x'--r .,r.''r<. .�»",',.� 2�s•�i.. z4F't;'• ��' 4 ✓. -'nl�fr''z-r' T��., �-✓r'r. .f'l F p?'.f✓.-+^ �' � �r r �> 'v-T � a- r,,bx.�. �:�'''� _,��%.:rte., ..J.,�'-f.,r}f✓z;, ✓- ,.; jh>!'r_ �:^ ,....,_x..s.:i >_�:{._-r_ -„✓ ��r-�..�7�, __ �>� .U�.e,..,.:.�,n� r��,r�da ,.� 'r�.:.- a'`^ .:'i' .�� -:Y �'u,r.�.;a�„ F> to the west have access to the site along the public sidewalk on the south and east sides of the site. Two additional connections to the public sidewalk are proposed on the south side of the building for access to the proposed stair tower and the restaurant use on the southeast corner of the building. The grading of the proposed site has been revised from the current approved SIP to provide the required quality treatment for the redevelopment on the proposed site. The bio-retention area to the west will not be utilized as previously intended. ........... Q S r f ..r -v; f'°rF c..1 r � as.? f r<r x t 9'1 �' �. ✓ z =0.f � �� S� .,��� � � -✓ r �_53 .,-��;:5n,1;;�;,:xrr.�.d � .,f -,P:;7✓�lf,$ j C��f n= 1•^"- ,•^�"�j- t 'e✓'e'��� �.�?p -e� o e�� �''j?$ [?.,i�fz�� Cr� .5 n.g,.h .,a�'a �vr-. ir, /���_ a �jc _ `t !�y - •?.7:r�<�J,,A..��,�'=�3,.:r,.y=''„s�,y,l vr ;.� ';:��a� -���!^' _ .;�-:M't_. r yy''�� a 3 �� t r t �? f r" ,• :i - of >.� r -...,,n�r; ��, r r� s uhf � ? 1`� �'r,'<: {a'� °r �'Y 3.rr3,���✓ S/ .fr c;� �� s .°];a :�.,r s �. t:: moinnbuswj broi-iom 1M'HSOAHSO'A3UiS NIVVY Hinos iss IN ,5 10 LL, *311 "S9NIG10H M31A3901119 XU :2103NO1f1(1(1V(INV NOUVAONH03SOdOU 9 eg Ell etk 1332115 tJIVW 'S ILI -II CS r .......................... ............. .. lit I f77777.: 4-t lit Pm�I ,9t L 3.0gsklq III ——— ——-- Page 14 �J � xou�nrusxo�xa.�.lax WHSOAHSo'i3321iS NIVW Ninos is8LO ® V 'ill `SJNIGIOH M31113J01218 ��0:!NOlifaaV aNV NORVAONId a3sodONd f a ! R as Z Q p 9s 9 IF ! A cr sp go 101 t! 2 c0 } �onhr n S p i! �� rk a �.�. � :- -t- 1332!}5 NMYi •S ,�.�— !! !'t f! ( i I I dlI 1 I Y3 9 1�G 1 I i1 Y i a 'u i I I+tS .I i I k�"� I _'r YF• 3 r:Ji�!�-'aT � j i lal al tI Fry AIIi Ilrl illi51i i I 'Ii Y I I I •F I r�J _—_�_ __ .8Y 4 3-6 r.2Y.O�.Y _i t�_ I f � Page 15 ,J� � uauanaasn�o�aoi�ox � IM`HSOANSO• i33aUS NIVW HiROS iS8 Ali `SEM101OH M31AMCIRIG F E 4403 NOIIIOOV(INV NOI LVAON32 03SOdO'dd 3 P g S 3 s � �m�� Ell CHEB 3 W � 9 O O OI Nil . z _ O - F �4 o- o - o- H jig 0 i _ 4 a QrFFn Q d'L: Z O t= w J W 4 S i ..Q ON II . ILA in Page 16 g mous tusno17i0.41ON o 1 s s IM`NSONHSO• 133HIS NIVLAI mmol TS8 `S9NIC11OH-MMIR3J®la8 a s 1 :aOJ NOIIIOOV(INV NOIIVAONR 035OdOUd ; R A t o z71 z: g O 5f ts4 H 3 8 3 O 3uEO O 'O e f 1 I I i 'il[jlj..,df iml a w3 FEM FFM M59. ! N; a i ------- a a EF o s� r� a o i z a ° o a=� F c O p O 0 Ed LU saP si w e3 [[ c3 ' FFM - I 's '! o 0 0.' i o ip .. g a � a Page 17 ,�� � NOW(k[15N07�lOiaON � IM`HSO)IHSO. 133US NIVW Hinos LSS 311 `SJNICIIOH AMIAR IMB X ISH t ' :UOJ NOIiIGGV(INV NOIIVAON32I fl3SOdO'dd 3 QYti / �F�C F 3' 1�✓{y W. f �a f nL PI 5, ✓f r t l , l HIM G 77 ��+✓1}r 9r. _ O , � f F — S .�l''^�i`t'�fE 49 ;c Jr 7 � � ��� l � s I, I 4� Page 18 g fl N0117llE SMOJ)YOi10N IM'HSO?IHSO e 1332115 NIVW HinOS TSS 311 `SJNI®lON AMIAMMU'a � 5 G :WA NOWCOV ONV NOIIVAON321 O3SOd021d r ✓s f�✓�"tf,<✓k X� x ✓1 ,NMSO, r r r �3 M (j NOV a y YEg Mom Yf r I. t Y ' - P t 4 es` f J fiS t� N erg ! ri, r J� Page 19 SIP BRIDGEVIEW HOLDINGS LLC GOLLNICK INDUSTRIES INC 851 S MAIN ST. 300 OHIO ST 907 S MAIN ST PC: 05-01-18 OSHKOSH, WI 54902 OSHKOSH, WI 54902 GOLLNICK RENTALS INC MKl LLC NATHAN D MENZEL 905 S MAIN ST 905 OREGON ST 25 W 9TH AVE OSHKOSH,WI 54902 OSHKOSH,WI 54902 OSHKOSH,WI 54902 REDEVELOPMENT AUTH CITY OF 901 SOUTH MAIN LLC BRIDGEVIEW HOLDINGS LLC ATTN: OSHKOSH WILL STEINER 907 S MAIN ST PO BOX 1130 300 OHIO ST OSHKOSH,WI 54903 OSHKOSH, WI54902 OSHKOSH,WI 54902 Page 20 SIU-GTH A1! ..,P su v 8010 7 40Y.A FSR b - 605 - ,,7 L; W 7 Ty[y,f T I 1 I-A� •�•Hrn 51 s I R env j »c¢ pT AV�vep¢�+r,:p.V $Wt 802 60d 806::. 820 . s 806:' 870.812 874+: $26 830;; 832 834;: ; s ' &50 882 864 868:; 8d0 E42 844 848:: °' N � W-9T-H-AV T-H AY . 777L- 3 7 B d A .. 7 A 9P b0 ti9C I I m :4 ❑€ I� .,aFq ss¢ �. S g N j 36 9 W—10TH-AV E 110TH-AV .V tS 4C 3]a PJ ¢ t]P L'i C3 aRmm a01 5.1 4 36 37 2 2{ ' } \ 1 in=0.03 mi » I in 140 f# . C4 of Oshkosh maps and data are intended to be used for general identification purposes only,and City the City of Oshkosh assumes no liabalty for the accuracy of the information. Those using the Priming Date:4113!2018 hformatiorr are responslb'e for verifyhg accuracy. For full disclamer please go to Oshkosh vrvav,d.Oshkosh,vri.uslGlSdsCtaimer Prepared by:City of Oshkosh,WI J �J JAGISTIannfngTim Comm[Ws un Site Pfan Map Temp! 14Ran Comnr'vcs'on Sit Han hlap Tempate•1ruM21 User.mina:{ 5 uMU RMU-PD-RFO f UMU r I PD,RFO CMU-RFO CMU 1 TR•10 f t CMU fh• i r` -PD ,� UMU v 1=RFO UMU-PD/ CMU-PD-RFO ' f i fill ! CMU RFO f . f PD`_RFO RMU-PD-RFO f N UMU RMU-PD RMU-PD i UMU-RFO EE f f i I UMU, 1 f i f f FRMU=RFO LLU I f [ TR-,10 CMU-PD RMU �RMW FOI 1 ;' f r - CMU f f CMU -41 RMU-PD-RFO i _� CMU-PD vv -12 TR-10 III RMLOD-RFO N : UMU HI J I f i oh 1 r 1 in=0.09 mi N _ . 1in=480ft call City of Oshkosh maps end data are intended to be used for general AenTicaton purposes only,and C fly the City of Oshkosh assumes no Eabiity for the accuracy of the information. Those using the Printing Date:411312018 or hformation are responsible for verifying a=racy. For fug discdaimer p#ease go to wvw.d.oshkosh.vri.uslGlS6sda,'ma Prepared by:City of Oshkosh,WI Oshkosh 1GISlPlanning flan Commisson Site?lan Plan?.Sap Template,mad User.minak Page 22 j; t. k - xE " Z'., ; M; Klnrr x �?n y ..h rarf rx�'" �-l.ms^`t,{7 eru%» rr ✓ ,.?:7+lcr=tir/s. .n- � r .'- ti aa/ ,3a'iJs, ' lr`;z"`�7�y�, �' j� r _ :'t r,z�v' ��mss'"�r'&'✓tet.„a�%yrr ``8 Yt�N -':>-�a' r ; '�' r f,..., .J' >, �e rtt_. - �r� E h t s ,�r —W, �1�11� ✓/;fit'`r6cr,� .`'.✓'tt' i'- .,'�'�irK+ ��;'�-' � y✓'�3 _ y' t ��yff,. '� f � J ��/Y � � ,�. } ���5x� ���ri1tz.� L, .✓w” .a `:�_. 1.m-�.s, v I Y.,a',- I� - 9 - I i r i r t� r 1. r r i s r r H'Fsj,u',-<f � �� � `�` � -°' "�'=,✓ rs 5 � _ � ? = .[ y" r-l _,. J ! s�,.r��.^,' r y 2=f�. � ?'' -r r✓,,c �, 'r' i' �.-r'r� E� f ✓ f :�r� 3 } f. — N �� �� ► 1 in=0.82 mi - 1 in= 120 ft6.1 , City of Oshkosh maps and data are kttended to be used for general ident cation purposes orty,and {;ity, c the City of Oshkoshare assumes o lability for ac accuracy r the infatuation. Those using the Printing tate;4/13/2018 Oshkosh lnformafion �e rospons'h'o for verifyktg accuracy For full discia�mer please go to vtnw.a.oshkosh.�ri.uslG#5dsdamer Prepared by: City of Oshkosh,WI JAC]SFanningTlan Commission Site Plan Map Temo'.Wtan Commsslon Site Flan P"ap Template.mxd User.m nak Page 23