HomeMy WebLinkAboutItem IV PLAN COMMISSION STAFF REPORT MAY 1,2018
ITEM IV: SPECIFIC IMPLEMENTATION PLAN AMENDMENT FOR A MIXED-USE SITE
LOCATED AT 851 SOUTH MAIN STREET
GENERAL INFORMATION
Owner/Petitioner: Bridgeview Holdings LLC—Will Steiner
Action(s)Requested:
The petitioner requests an amendment to the Specific Implementation Plan approval for a mixed-use
site located at 851 South Main Street.
Applicable Ordinance Provisions:
Planned Development standards are found in Section 30-387 of the Zoning Ordinance.
Background Information Property Location and Type:
On April 22,2008,the Common Council approved a Planned Development for the block bounded by
South Main Street,West 8th Avenue, Nebraska Street, and West 91"Avenue for a multi-family
development on the western portion of the site and renovation of the existing 4-story building
(formerly Miles Kimball) on the east side of the site. The multi-family development to the west of the
subject site was constructed in 2008 per the approved Plarmed Development. The Miles Kimball
building was never renovated,but the surrounding facility was razed in 2006 according to prior
building permit records.
The approximate 0.83 acre site includes a 4-story structure built in 1900, according to City Assessor
information. The site was formerly used for light manufacturing/industrial purposes (Miles Kimball)
and is now vacant. The surrounding area contains a mix of industrial, commercial and residential
uses.The subject property is located within the South Shore East redevelopment area which is
generally located on the south side of the Fox River from the west side of South Main Street to Lake
Winnebago, with the southern boundary of 161h Avenue;and is immediately west of the area being
identified as the "Sawdust District."
Subject Site
E:ristin . Land Ilse Zoning
Vacant Industrial (former Miles Kimball) CMU-PD
Adjacent Land Use and Zoning
E.-cistim Uses Zoning
North Vacant UMU _
South Mixed commercial/residential CMU
East Vacant RMU
West Multi-family residential CMU-PD
Cartr telrerisiue'Plrrrt Laird Use Recotrturelydrrtiott Laud Use
10 Year Land Use Recommendation Mixed-_Use Downtown
20 Year Land Use Recommendation Mixed-Use Downtown
ANALYSIS
Use
The previously approved Planned Development of the site was for renovation of the site for
commercial use on the ground floor and residential units on floors 2-4 as well as an optional ground
floor patio.The applicant is proposing to renovate the building to include two tenant spaces on the
first floor that will either be a restaurant or retail space along with two patios on the south side of the
building, office spaces on floors 2-4, and rooftop addition(511,floor)for a bar (50 patrons or less)and
patio area. The proposed mix of uses is permitted in the Central Mixed Use district.
The proposed use is consistent with the 10-year and 20-year Comprehensive Land Use Plans, as the
area is identified as appropriate for mixed-use downtown development due to the subject site's
proximity to the central city.The proposed renovation meets the guidelines of the South Shore Fast
redevelopment area and is generally consistent with the approved Planned Development for the site
with minor changes to the site design and use of the building.
Per the applicant's narrative, the hours of operation and number of employees are currently pending
based on prospective tenants for the building. Traffic generation will also be determined once final
tenants are identified.
Site Design&Access/Parking
The petitioner is proposing various revisions to the approved site design. Three building additions
are being proposed which include a mechanical room on the northwest corner of the building, a glass
enclosed stair and elevator tower on the west end of the building, and a glass enclosed stair tower on
the south side of the building. The mechanical room will include the sprinkler rise and electrical
service and will be screened to match the building exterior. The stair and elevator towers are needed
to allow vertical transportation outside the original building footprint and will also provide additional
building articulation.
Two concrete patios are being proposed for the south side of the ground floor retail/restaurant uses
with each having a wood framed pergola,where the original plan only had one larger ground floor
patio area. Staff does not have concerns with this change.
The petitioner is proposing a reduction of parking area,from 52 spaces to 40 spaces. This reduction is
necessary to accommodate the western(stair/elevator) addition and proposed dumpster enclosure
placement. Staff does not have concerns with this change as the Central Mixed Use District does not
require off-street parking. Furthermore, the change from residential units to office spaces should
result in lesser demand for off-street parking. The parking area will be accessed from West 811,Avenue
with the driveway generally in the same place as originally approved.
The proposed dumpster enclosure will be located in the northwest corner of the parking lot. A base
standard modification is required as the enclosure will be closer to West 81h Avenue than the principal
structure,where code does not allow dumpster enclosures in front yard areas. Staff is supportive of
ITEM IV-CUPISIP Anreud merit—857 S blain St. 2
the proposed location as the site has three frontages resulting in little, if any,feasible area that is
accessible. Additionally,the materials of the enclosure will match with building materials for a more
attractive appearance than wood.
The sidewalk connection to the residential development to the west has been removed. However, two
additional connections to the public sidewalk are proposed on the south side of the building for access
to the stair tower and restaurant use, along with a connection on the east side of the building from
South Main Street.
A dedicated loading zone is not included. According to the applicant, deliveries will be made outside
of peak hours. A straight or van truck will access the site using the same route and turning radius as a
refuse pick-up truck. Street parking is allowed on W. 81h Avenue which will allow any deliveries
made from a semi to be made via wheeled dolly from W. W,Avenue. A base standard modification
will be needed as code requires a designated loading area. Staff is supportive of a base standard
modification as large deliveries should be relatively infrequent.
Lighting
The proposed photometric plan exceeds the maximum allowable lighting level(0.5 footcandles)along
the north, east,southeast, and south property lines. Staff is supportive of a base standard modification
to allow the excess lighting as it does not spill over onto adjacent properties,but only onto public
right-of-way areas.
Signage
Conceptual signage plans have been submitted which include wall signage on the north, south,and
east facades, with three(3) signs per facade. According to the plans,the north and south facades each
have 148' of lineal building frontage with 240 sq. €t.of wall signage proposed for each facade. The east
facade has 45' of lineal building frontage with 82.5 sq. ft. of wall signage proposed.
The zoning ordinance allows for a maximum of 1 sq. ft.of wall signage per linear foot of building
frontage. The total wall signage area on all three facades exceeds the maximum allowance and will
need to be reduced to meet code. The signage can be addressed under a separate building permit.
The applicant may apply for a base standard modification to exceed maximum wall signage allowance
at a later date,but will require more detailed signage plans.
Landscaping
A detailed landscaping plan has been submitted. The Central Mixed Use district is exempt from
landscaping requirements for building frontages,street frontages,and yards,but must meet
landscaping requirements for provided paved areas. The landscape plan is missing three(3) tall
deciduous trees required at parking row ends and is slightly deficient on required paved area
landscaping points required for tall/medium trees. Provision of the required parking row island trees
should satisfy this requirement. These changes can be addressed during the site plan review process.
Stormwater Management
The application states that the grading of the proposed site has been revised from the previously
approved SIP to provide the required quality treatment for the redevelopment on the site. The bio-
retention area to the west will not be utilized as previously intended.
ITEM JV-CUPISIPAniendment—851 Shlain St. 3
The Department of Public Works reviewed the plans and noted that the project must demonstrate that
the water quality treatment and stormwater management system for the adjoining property to the
west is not adversely impacted by this project. This also can be addressed during the site plan review
process.
Bu lding
The proposed building facades will be similar to what was originally approved,with some minor
additions/revisions. New glass enclosed stair/elevator towers are being added to the south and west
facades. The petitioner feels that these additions will enhance the appearance of the building by
providing"massing" to the original industrial structure and the exposed steel features enhance the
industrial aesthetic.
The petitioner also notes that"eyebrow" details have been added over the new windows for the first
floor tenant spaces and the new punched windows along the north and south facades have been
revised to create better rhytlun and symmetry.
New canopies have been added to the north and west entrances to aid in entrance identification and
wood framed open air pergolas are proposed over the patio areas. These features consist of brick piers
with stone caps,exposed steel columns and beams,with wood fascia. Encroachment agreement(s)
will be required as portions of pergola and canopy extend over the public right-of-way along the east
and southeast property lines.
The proposed rooftop addition(51h floor) will be consistent with the materials of the building and
includes wood pergolas over the patio area. The petitioner feels that this adds additional articulation
to the overall facades.
The Central Mixed Use Design Standards state that the height of buildings shall be compatible with
existing buildings in the immediate area which conform to the design theme of the area, as
determined by Plan Commission. As the overall building height is being increased,it is up to Plan
Commission to determine if the proposal is consistent with the buildings in the immediate area.
Staff is supportive of the proposed changes to the building plan as the additions/revisions seem to
only enhance the appearance of the facades.
FINDINGS/RECOMMENDATION/CONDITIONS
In its review and recommendation to the Common Council on an application for a Planned
Development district, staff recommends the Plan Commission make the following findings based on
the criteria established by Chapter 30-387(C)(b):
(a)The proposed Planned Development project is consistent with the overall purpose and
intent of this Chapter.
(b)The proposed Planned Development project is consistent with the City's Comprehensive
Plan and other area plans. (It is the responsibility of the City to determine such consistency.)
(c)The proposed Planned Development project would maintain the desired relationships
between land uses,land use densities and intensities, and land use impacts in the environs of
the subject site.
ITEM I V-CUPISIP Amendment—851 S Main Sl. 4
(d)Adequate public infrastructure is or will be available to accommodate the range of uses
being proposed for the Planned Development project, including but not limited to public
sewer and water and public roads.
(e)The proposed Planned Development project will incorporate appropriate and adequate
buffers and transitions between areas of different land-uses and development
densities/intensities.
(f)The proposed Planned Development project design does not detract from areas of natural
beauty surrounding the site.
(g)The proposed architectu re and character of the proposed Planned Development project is
compatible with adjacent/nearby development.
(h)The proposed Planned Development project will positively contribute to and not detract
from the physical appearance and functional arrangement of development in the area.
(i)The proposed Planned Development project will produce significant benefits in terms of
environmental design and significant alternative approaches to addressing development
performance that relate to and more than compensate for any requested exceptions/base
standard modifications variation of any standard or regulation of this Chapter.
(j)For Planned Development projects that are proposed to be developed in phases, the
applicant can provide a timeline for development and can demonstrate that the project would
be successful even if all phases were not or could not be completed.
Staff recommends approval of the Specific Implementation Plan,with the findings listed above and
the proposed following conditions:
1. Base standard modification to allow a dumpster enclosure between the building and public
street.
2. Base standard modification to allow a commercial use without a designated loading area.
3. Base standard modification to allow lighting levels to exceed 0.5 footcandles at the north,east,
southeast, and south property lines.
4. Final Iandscaping plan approval by the Department of Community Development.
5. Encroachment agreement be drafted for pergolas and canopies extending over public right-of-
way and recorded with the Winnebago County Register of Deeds.
ITERI IV-CUPISIP,,menehnent--851 S blain St. 5
SUBMIT TO:
'An City Of Oshkosh Dept,of Community pevelopment
City 215 Church Ave.,P,O,Box 1 230
of Planned Development Application Oshkosh,WI 54901
Oshkosh PHONF:(920)236-5059
For General Development Plan or Specific Implementation Plan
"PLEASE TYPE OR PRINT USING BLACK INK**
APPLICANT INFORMATION
Petitioner: Bridgeview Holdings LLC - Will Steiner Date: 04/02/18
Petitioner's Address: 300 Ohio Street City: Oshkosh
state: WI zip: 54902
Telephone #: (920) 277-6576 Fax: ( } Other Contact # or Email: WIII@Wsteiner.com
Status of Petitioner (Please Check)[Qr/kreenlafive a Tenant Prospective Buyer
Petitioner's Signature (required): Date: 4/2/2018
OWNER INFORMATION
Owner(s):_ Bridgeview Holdings LLC - Will Steiner Date: 04/02/18
Owner(5) Address: 300 Ohio Street _ City: Oshkosh ____State: Wl zip: 54902
Telephone #: (920) 277-6576 Fax: ( } Other Contact # or Email: 54902
Ownership Status (Please Check): t_!individual Trust Partnership Corporation
Property Owner Consent:(required)
By signature hereon,]/We acknowledge that City officials and/or employees may, in the performance of their functions, enter
upon the property to inspect or gather other information necessary to process this application. I also understand that all
meeting dates are tentative and may be postponed by the Planning Services Division for incomplete submissions or other
administrative reasons.
Property Owner's Signature: Same as applicant Date:
TYPE OF REQUEST:
❑ General Development Plan (GDP) ❑ General Development Plan (GDP) Amendment
❑Specific Implementation Plan (SIP) ®Specific implementation Plan (SIP) Amendment
SITE INFORMATION
A.ddress/Location of Proposed Project: 851 South Main Street
Proposed Project Type: Office - Floors 2,3,4 and Restaurant/ Retail - Floors 1 and 5
Current Use of Property, Vacant Building zoning: CMU-PQ
Land Uses Surrounding Your Site: North: Vacant/ Commercial
South: Commercial
East: Vacant
West: Multi-family Residential
It is recommended that the applicant meet with Planning Services staff prior to submittal to discuss the proposal.
➢ Application fees are due at time of submittal.Make check payable to City of Oshkosh.
➢ Please refer to the fee schedule for appropriate fee. FEE IS NON-REFUNDABLE
For more information please visit the City's website at www.ci.oshkosli.wi.us/Community_Development/Pfant)ing.htn)
Page 6 Staff Date Rec'd
• Specific treatment and location of recreational and open space areas, including designation of
any such areas to be classified as common open space.
a Proposed grading plan.
❑ Specific landscaping plan for the subject site, specifying the location, species, and installation size of
plantings. The landscaping plans shall include a table summarizing all proposed species.
a Architectural plans for any nonresidential buildings, multi-family structures, or building clusters, other than
conventional single-family or two-family homes on individual lots, in sufficient detail to indicate the floor
area, bulk, and visual character of such buildings.
❑ Engineering plans for all water and sewer systems, stormwater systems, roads, parking areas, and
walkways.
o Signage plan for the project, including all project identification signs, concepts for public fixtures and signs,
and group development signage themes that may or may not vary from City standards or common
practices.
a Specific written description of the proposed SIP including:
Specific project themes and images.
• Specific mix of dwelling unit types and/or land uses.
• Specific residential densities and nonresidential intensities as described by dwelling units per acre,
and landscaping surface area ratio and/or other appropriate measures of density and intensity.
• Specific treatment of natural features, including parkland.
• Specific relationship to nearby properties and public streets.
• Statistical data on minimum lot sizes in the development, the precise areas of all development lots
and pods; density/intensity of various parts of the development; building coverage, and
landscaping surface area ratio of all land uses; proposed staging; and any other plans required by
Plan Commission.
• A statement of rationale as to why PD zoning is proposed.This statement shall list the standard
zoning requirements that, in the applicant's opinion,would inhibit the development project and the
opportunities for community betterment that are available through the proposed PD project.
• A complete list of zoning standards that would not be met by the proposed SIP and the location(s)
in which such exceptions/base standard modifications would occur.
• Phasing schedule, if more than one development phase is intended.
❑ Agreements, bylaws, covenants, and other documents relative to the operational regulations of the
development and particularly providing for the permanent preservation and maintenance of common
open areas and amenities.
❑ A written description that demonstrates how the SIP is consistent with the approved GDP and any and all
differences between the requirements of the approved GDP and the proposed SIP.
I hereby certify that to the best of my knowledge all required application materials are included with this
application. I am aware that failure to submit the required completed application materials may result In denial or
delay of the application request.
Applicant's Signature (required): Date: 4/2/2018
Q
Page 7 3
A" On'
April 2, 2018 EXCEL
ARCHITECTS•ENGINEERS•SURVEYORS
Project Narrative
Project: Bridgeview Holdings
851 South Main Street
Oshkosh, WI
Bridgeview Holdings, LLC is requesting Specific Implementation Plan (SIP) Amendment
& Encroachment approval for the renovation of an existing vacant building located at
851 South Main Street into a mixed-use space containing office, restaurant and retail
tenants. The property is currently zoned CMU-PD.
The property is part of an approved General Development Plan on the block bounded
by South Main Street, West 8th Avenue, Nebraska Street and West 9f" Avenue in the
South Shore Redevelopment Project Area. The west portion of the block contains
townhouses and the proposed renovation project is on the eastern portion of the block.
Surrounding land uses include: vacant and commercial to the north, south and east and
multi-family residential to the west. The proposed project will be compatible with the
surrounding zoning, which includes: Urban Mixed Use (UMU) to the north, Riverfront
Mixed Use (RMU) to the east, Central Mixed Use (CMU) to the south, and Central
Mixed Use wl PD Overlay (CMU-PD) to the west.
The property currently consists of an existing (4) story 24,524 sq. ft. (5,131 sq. ft. per
floor) vacant building and gravel and grass lawn area. The building renovation will
include offices on floors 2, 3 and 4 and potential restaurant and retail space on floors 1
and 5. The following building additions are proposed: 4,205 sq. ft. (5) story stair and
elevator tower (841 sq. ft. per floor) to the west, 1,813 sq. ft. roof top addition and 1,385
sq. ft. (5) story stair tower (277 sq. ft. per floor) to the south.
. ..
Proposed exterior building modifications are designed to pay homage to its
manufacturing past and bring back to life this century old industrial building by capturing
the current mixed use trend while reclaiming and enhancing the existing industrial
building with Spartan brick massing and steel applique. Because of these modifications
and additions, a conceptual building code narrative has been included with the proposal
to show the intent of how this facility will meet the building code. These modifications.
will include:
• All the existing painted exterior brick will be tuck-pointed, bead blasted and
sealed to bring back their original industrial aesthetic
• New punched window openings along the north and west.facades
o Include proportions and details from turn of the century industrial buildings
• New entrance canopy to identify the north entrance
o Brick piers with stone caps
o Exposed steel columns and beams
o Wood fascia
o Enhances the existing industrial appearance
• New mechanical room and mechanical screen on the northwest facade
o A mechanical room to include the sprinkler riser, electrical service
o Provide opaque screening to a ground mounted mechanical unit.
Screening will match the building exterior.
• New eyebrows over new windows on the first floor tenant spaces
o Brick piers with stone caps
o Exposed steel columns and beams
o Wood fascia
o Enhances the existing industrial appearance
• New glass enclosed stair and elevator tower addition on the west end
o Massing to enhance the original industrial building
o Details to create a turn of the century appearance
o New canopy to identify the west entrance
o Exposed steel structure to enhance the industrial aesthetic
o Stair and elevator to provide vertical transportation outside the original
building mass
• New glass enclosed stair tower on the south
o Massing to enhance the original industrial building
o Details to create a turn of the century appearance
o New canopy to identify the west entrance
o Stair and elevator to provide vertical transportation outside the original
building mass
• New patios from the first floor tenant spaces along south facade with entrances
from the two first floor tenant spaces
• Wood framed open air pergola over the patios
o Brick piers with stone caps
o Exposed steel columns and beams
o Wood framing members to provide shade over patios
.................
o Enhances the existing industrial appearance
• New roof top patios and bar
o Will create spaces that allow users to view the lake, river and downtown
o Adds additional articulation to the overall facades
The hours of operation and number of employees is currently pending based on the
tenant mix for the building. Traffic Generation can also be determined once final
tenants are identified.
The building renovation will be a positive change to the area. The redeveloped property
will fit with the character of the existing neighborhood and there will be no`negative
impact on neighbors. This development will also create an excitement to the downtown
neighborhood by providing a facility that will provide modern conveniences and services
while not forgetting Oshkosh's historic manufacturing past.
SIP Narrative Requirements:
• Specific project themes and images
o The proposed development, in an effort to be respectful to the buildings
manufacturing history, is a blend of turn of the century charm and modern
day amenities. With the reclamation of the original brick facade and
addition of exposed steel structured glass stair tower additions, this facility
will provide users with a sense of its storied past while furnishing the
comforts of modern day amenities.
• Specific mix of land uses
o The proposed uses will include restaurants, retail spaces and office space.
These uses and services will be a needed addition to a developing and
growing area.
• Specific residential densities and nonresidential densities as described by
dwelling units per acre, and landscaping surface area ratio and/or other
appropriate measures of density and intensity.
o The proposed 31,927 sq. ft. facility with include 17,181 sq. ft. of space for
office use, and 6,849 sq. ft. of space for either restaurant or retail space.
The proposed site will include 25.4% open space and 74.6% impervious
surface. The exterior lighting on the site will meet the code requirements
and provide an inviting atmosphere for the public. Site lighting plans are
included with the SIP amendment submittal.
• Specific treatment of natural features
o The major natural feature on the property is the existing four story brick
building. The proposed development will reclaim the original brick and
enhance the original industrial building with exposed steel structural and
elements.
• Specific relationship to nearby properties and public streets
o The existing building is centrally located on the east side of the site and
will remain in its current location. Parking areas are proposed on the west
and north sides of the building as previously intended on the existing SIP.
...:.................... ..... ....... .
• Statistical data on minimum lot sizes in the developmdnt,the`.precise areas
of all development lots and pads; dens itylintensty of various parts of the
development; building coverage, and landscaping surface area ratio of all
land uses; proposed staging; and any other plans required by Plan
Commission.
o The existing lot is 36,316 sf(0.83 ac)and contains a 6,170 sf(0.14 ac)
building and 12,002 sf,(0.28 ac) of gravel for a total of 0.42 acres of
impervious coverage (50%) and 0.42 acres of open space (50%). The
proposed site will contain a building footprint of 7,400 sf(0.17 ac), 19,702
sf (0.45 ac) of impervious surfaces,.and. 9,211 sf (0.21 ac) of open space.
Based on the surface coverages,the proposed site is comprised of 74.6%
impervious surfaces, and 25.4% open. space. The proposed driveway will ..
be in generally the same location as the current SIP that will be amended.'.
f
r.''�'r',��y�� .s„�S.s',"l-^��la,�,„-�3�st..., ' �Yi✓%r''.���,"`�'"' �f,`��.9?� .3'�w�,.-
® A statement of rationale as to why PD zoning is proposed. This statement
shall list the standard zoning requirements that, in the applicant's opinion,
would inhibit the development project and the opportunities for community
betterment that are available through the proposed PD project.
o The proposed SIP is a revision to the previously approved SIP; however
the proposed revisions made to the development will provide much
needed services and amenities to the downtown neighborhood. In
addition, the proposed site generally follows the previously approved SIP
with minor modifications to the layout.
• A complete list of zoning standards that would not be met by the proposed
SIP and the location(s) in which such exceptions/base standard
modifications would occur,
o Section 30-191(E)(2)(b) — Refuse or Recycling Enclosures
■ Dumpster enclosure is located in the front setback
• The proposed property has street frontage on three sides.
Finding a compliant location is difficult if not impossible. In
an effort to comply with the intent of the ordinance, the
proposed dumpster enclosure materials will match the
existing building materials including adding brick piers.
Dumpster enclosure detail is provided with submittal.
o Section 30-54(G)
• Minimum Pavement Setback
• The patio concrete on the southeast corner of the building is
located within the 5' pavement setback. The proposed
location creates no adverse conditions to the public.
o Section 30-114 (B)(3)
■ Permitted Projects into All Required Yards
• Several eyebrows, a brick pier, and some signage are
proposed to encroach into the right of way along the eastern
side of the site. Because the existing historic building is
currently built on the east right of way line, any additions or
amenities along the east facade will need.to extend in the
........................................... ..
right of way. This will create no foreseen.adverse effects to
the public are created and aide in the overall industrial
design of the development. An encroachment request is
being made with the SIP amendment for these items.
o Section 30-190
■ Lighting Levels
• We are not meeting the required lighting levels at the north
property line to the public street. Due to the proximity of the
pro line from aur proposed g ro osed li ht pole location we are
property
not able to meet this requirement. We are meeting the
required levels to the west property line to the neighboring
property. The site spillover is not onto neighboring
properties and into right of way providing greater visibility for
the public.
��' 1�;.'���_ '�"L?2�a� ,� r � ��t� � r���� r.�;J r�,v`Li"z'���r '��`.r�•P�r'`'`%r�,F'f��z�. F"z� ,���"�n�r�n V;;..�.._ f ��/ �:m � 0 8 a
_ �7' �- � .:,e -•,>r.;n�. 2"r6, v�1.�.�;-.,,,-' ,6., r.':�t.�M.�, .ar<r,r r,. .�1��'.,v _ s..: - �G
r ra �� ,:,�;- c -:Ga ;.r1 -��_'h��:-L;•, ��i rrv � .r'''. ;;-.�� r��� -ice?�s,x:...,, ��°.�_ �''`' _�'' `r� .r- '�?r�,, _••�S.
r r S. � 6 trf,:�Y pp�,�rc.-i&* y•aG.f'` v',,.;:.L:�'✓ -.F. �r; �-_r�' � ✓'I,s'�,,s, ,� .! ,`- '' ,f', e� � P�'- -
'.;�;, f 3 y' yy gg J (' a.31a r5u^✓.'�-'. -y t r- '!'Y'r' ` �,; ci'- -',.,,r_ v -;:'?.,.,a s - yam" -' fel i; s- v;l4
.S '�.4 d�9 � ,, k„(", .!� r' z.s �.z..�-„�'�...'s- _:�,r.uE^P�- r..��...�'�',,`; a..E ✓- .�,,Er c.�a , x., ��,r. -�. � '�' -
�: z� •x r. ,# 1 `r{ .-�r ,-X.J�r F -� s�Y''.r .a,�,;,;%5�=.,;r'•3`' s r. ?��;.:�;�1�" •.,, .�_,.. ,a .�.9,.,p'
(. ra �H,rf S�-_ 2, 1- .l'�9.;�'..u�_-{Yd �'r ' r '�-'-moi / -r ✓ r. r% -r�?rzt�:i�C�<�'�r `✓vr + ` .,�"^
r ;� c, ,� r -^''� f e�°,�.',r'��.!t�,ll.�y.,z�� '�, rx=y�� i- �✓., e. �<r=-^3�.,� .;�,.„,,.._ .� �'^-��,�,C%�Vit.. .�,.
s'xs'.j..u�sr.�::�s�.� ..J� �r� �--"l.�,�u'a�,u'r2�e� -v-3��w-'ti`-��Y.'uzr=.:.� `��lva_3� , -rr.�.� .'.v.^ i.=r�Z��s:-c-���`-r„�-,�'".�"�s,. -:^.���a✓' � �t��"'. s .w
o Section 30-176
■ Loading Zone
® A dedicated load zone area is not proposed on the site.
Deliveries will be planned to be made outside of peak hours.
A straight or van truck can access the site using the same
route and turning radius as a refuse pick-up truck. Street
parking is allowed on 8th Street. This will allow semi
deliveries to be made via wheeled dolly from 81h Street.
Phasing Schedule
o The proposed project is planned for 1 phase.
e How is this SIP consistent with the approved GDP and any and all
differences between the requirements of the approved GDP and the
proposed SIP.
o The proposed SIP differs from the approved SIP in following ways;
■ The existing building will include glass stair tower additions to allow
vertical transportation outside the original footprint and create
additional articulation to the existing building massing.
■ New entrance canopies at the north and west entrances have been
added to aid in the identification of the building entrances.
■ Eyebrow details have been added to the first floor windows to add
to the articulation of the existing facade.
■ Two patios on the south side of the two retail 1 restaurant uses with
wood framed pergola will shade these uses.
■ Punch windows along the north and south facades have been
revised to create better rhythm and symmetry and provide focus on
the new entrance canopy on the north fagade and the glass stair
tower on the south.
■ The uses of the development have been changed to include
restaurants, retail, and office.
■ Additional signage has been added to aide in the identification of
.....................
the proposed commercial uses. The proposed signage will meet
current zoning regulations. Locations and square footage is
provided on the plans that are included with the submittal.
-
■ Roof top bar and patio addition has been added to provide users
with a view of the lake, river and the downtown skyline
■ The design of the dumpster enclosure has been changed to be
more consistent with the overall development. The.materials of the
dumpster are consistent with the building materials
• The lighting of the brick fagade_has been revised to accent the new
building rhythm and symmetry created by the.punched window
locations. -
.
■ The amount of parking has been reduced from 52 spaces on the
current SIP to 40 on the proposed:SIP.
■ The sidewalk connection to the residential development to.the west
has. been removed. Pedestrians from the.residential development
✓,,.r":,,p y{. 4 `` .,iyp .,q > i f a 1 i s q p ,
.,P', taF .j F�1�'r„s V e' 0"t A _ i4 S 7”" i
..��-..i„ ��`` �'�
ii`-5 c -`'x, r':?,- �'":. k.,� :
r � r'z'`.,1� r �'r r-r,-d���,.
'--..rr �i'g3s -r-h. �f,. :$r �, ,•.!r ��>. >x'--r .,r.''r<. .�»",',.� 2�s•�i.. z4F't;'•
��' 4
✓. -'nl�fr''z-r' T��., �-✓r'r.
.f'l F p?'.f✓.-+^
�' � �r r �> 'v-T � a- r,,bx.�. �:�'''� _,��%.:rte., ..J.,�'-f.,r}f✓z;, ✓- ,.; jh>!'r_
�:^ ,....,_x..s.:i >_�:{._-r_ -„✓ ��r-�..�7�, __ �>� .U�.e,..,.:.�,n� r��,r�da ,.� 'r�.:.- a'`^ .:'i' .�� -:Y �'u,r.�.;a�„ F>
to the west have access to the site along the public sidewalk on the
south and east sides of the site.
Two additional connections to the public sidewalk are proposed on
the south side of the building for access to the proposed stair tower
and the restaurant use on the southeast corner of the building.
The grading of the proposed site has been revised from the current
approved SIP to provide the required quality treatment for the
redevelopment on the proposed site. The bio-retention area to the
west will not be utilized as previously intended.
...........
Q S r f ..r -v; f'°rF c..1 r � as.? f r<r x t 9'1 �' �. ✓ z
=0.f � �� S� .,��� � � -✓ r �_53 .,-��;:5n,1;;�;,:xrr.�.d � .,f -,P:;7✓�lf,$ j C��f n= 1•^"- ,•^�"�j- t 'e✓'e'��� �.�?p -e� o e�� �''j?$
[?.,i�fz�� Cr� .5 n.g,.h .,a�'a �vr-. ir, /���_ a �jc _ `t !�y - •?.7:r�<�J,,A..��,�'=�3,.:r,.y=''„s�,y,l vr ;.� ';:��a� -���!^' _ .;�-:M't_.
r yy''�� a 3 �� t r t �? f r" ,• :i - of
>.� r -...,,n�r; ��, r r� s uhf � ? 1`� �'r,'<: {a'� °r �'Y 3.rr3,���✓ S/ .fr c;� �� s .°];a :�.,r s �. t::
moinnbuswj broi-iom
1M'HSOAHSO'A3UiS NIVVY Hinos iss IN
,5 10 LL, *311 "S9NIG10H M31A3901119
XU
:2103NO1f1(1(1V(INV NOUVAONH03SOdOU
9 eg
Ell
etk
1332115 tJIVW 'S
ILI
-II
CS
r
..........................
............. ..
lit
I f77777.:
4-t
lit
Pm�I
,9t L 3.0gsklq III
——— ——--
Page 14
�J � xou�nrusxo�xa.�.lax
WHSOAHSo'i3321iS NIVW Ninos is8LO
® V
'ill `SJNIGIOH M31113J01218
��0:!NOlifaaV aNV NORVAONId a3sodONd f a !
R as
Z
Q
p 9s 9 IF
! A
cr
sp
go 101
t! 2
c0 }
�onhr n S
p
i! �� rk a �.�. � :- -t- 1332!}5 NMYi •S ,�.�— !!
!'t
f! ( i I I dlI 1 I Y3 9 1�G 1 I i1 Y i
a 'u i I I+tS
.I i I k�"� I _'r YF• 3 r:Ji�!�-'aT � j i lal
al
tI
Fry
AIIi
Ilrl illi51i i I 'Ii
Y I I I •F I r�J _—_�_ __ .8Y 4 3-6 r.2Y.O�.Y _i t�_ I f �
Page 15
,J� � uauanaasn�o�aoi�ox �
IM`HSOANSO• i33aUS NIVW HiROS iS8
Ali `SEM101OH M31AMCIRIG F E
4403 NOIIIOOV(INV NOI LVAON32 03SOdO'dd 3 P g S 3
s �
�m��
Ell
CHEB
3 W
� 9
O O OI Nil
. z
_ O
- F
�4
o-
o -
o-
H jig 0
i _
4
a QrFFn
Q
d'L:
Z
O
t=
w
J
W 4
S i
..Q ON
II
.
ILA
in
Page 16
g mous tusno17i0.41ON o
1
s s IM`NSONHSO• 133HIS NIVLAI mmol TS8
`S9NIC11OH-MMIR3J®la8 a
s 1 :aOJ NOIIIOOV(INV NOIIVAONR 035OdOUd ; R
A t
o z71
z: g O 5f ts4 H 3 8
3 O 3uEO O 'O
e
f
1 I I i
'il[jlj..,df
iml
a
w3
FEM FFM M59.
!
N;
a i ------- a a
EF o
s� r�
a o
i z a °
o a=�
F c
O p O
0
Ed
LU
saP si w e3
[[ c3 ' FFM
-
I 's
'! o 0 0.'
i o
ip
..
g
a � a
Page 17
,�� � NOW(k[15N07�lOiaON �
IM`HSO)IHSO. 133US NIVW Hinos LSS
311 `SJNICIIOH AMIAR IMB
X
ISH
t ' :UOJ NOIiIGGV(INV NOIIVAON32I fl3SOdO'dd
3 QYti
/
�F�C
F 3'
1�✓{y
W.
f �a
f nL
PI
5, ✓f r
t l ,
l
HIM G
77
��+✓1}r
9r. _
O ,
� f
F
—
S .�l''^�i`t'�fE
49 ;c Jr 7
�
� ���
l
� s
I,
I
4�
Page 18
g fl N0117llE SMOJ)YOi10N
IM'HSO?IHSO e 1332115 NIVW HinOS TSS
311 `SJNI®lON AMIAMMU'a
� 5 G :WA NOWCOV ONV NOIIVAON321 O3SOd021d
r ✓s
f�✓�"tf,<✓k X�
x ✓1
,NMSO,
r r
r �3
M (j
NOV
a
y
YEg
Mom
Yf r
I.
t
Y ' -
P t
4
es`
f J
fiS
t�
N
erg !
ri, r
J�
Page 19
SIP BRIDGEVIEW HOLDINGS LLC GOLLNICK INDUSTRIES INC
851 S MAIN ST. 300 OHIO ST 907 S MAIN ST
PC: 05-01-18 OSHKOSH, WI 54902 OSHKOSH, WI 54902
GOLLNICK RENTALS INC MKl LLC NATHAN D MENZEL
905 S MAIN ST 905 OREGON ST 25 W 9TH AVE
OSHKOSH,WI 54902 OSHKOSH,WI 54902 OSHKOSH,WI 54902
REDEVELOPMENT AUTH CITY OF 901 SOUTH MAIN LLC BRIDGEVIEW HOLDINGS LLC ATTN:
OSHKOSH WILL STEINER
907 S MAIN ST
PO BOX 1130 300 OHIO ST
OSHKOSH,WI 54903 OSHKOSH, WI54902 OSHKOSH,WI 54902
Page 20
SIU-GTH A1!
..,P
su v 8010
7 40Y.A FSR
b
-
605 -
,,7
L;
W 7 Ty[y,f T
I 1 I-A� •�•Hrn
51
s
I
R
env j »c¢ pT AV�vep¢�+r,:p.V
$Wt 802 60d 806::. 820
. s 806:' 870.812 874+: $26 830;; 832 834;: ;
s
'
&50 882 864 868:; 8d0 E42 844 848:: °'
N �
W-9T-H-AV T-H AY
. 777L-
3 7 B
d A .. 7 A
9P b0
ti9C I
I
m :4 ❑€ I�
.,aFq
ss¢ �.
S g N
j 36
9
W—10TH-AV E 110TH-AV
.V tS 4C 3]a PJ ¢ t]P L'i C3
aRmm
a01 5.1 4 36 37 2
2{ '
} \ 1 in=0.03 mi
»
I in 140 f# .
C4 of Oshkosh maps and data are intended to be used for general identification purposes only,and City
the City of Oshkosh assumes no liabalty for the accuracy of the information. Those using the Priming Date:4113!2018
hformatiorr are responslb'e for verifyhg accuracy. For full disclamer please go to Oshkosh
vrvav,d.Oshkosh,vri.uslGlSdsCtaimer Prepared by:City of Oshkosh,WI J �J
JAGISTIannfngTim Comm[Ws un Site Pfan Map Temp! 14Ran Comnr'vcs'on Sit Han hlap Tempate•1ruM21 User.mina:{
5 uMU
RMU-PD-RFO f UMU
r
I PD,RFO CMU-RFO CMU 1 TR•10 f
t CMU fh• i r`
-PD ,� UMU v
1=RFO
UMU-PD/
CMU-PD-RFO ' f
i fill !
CMU RFO
f
. f
PD`_RFO
RMU-PD-RFO
f
N UMU
RMU-PD RMU-PD
i UMU-RFO
EE f f
i I
UMU, 1
f i
f f
FRMU=RFO
LLU
I
f [
TR-,10 CMU-PD RMU
�RMW FOI 1 ;'
f
r
- CMU f
f
CMU -41
RMU-PD-RFO
i
_� CMU-PD
vv -12
TR-10
III RMLOD-RFO
N
: UMU HI
J I
f i
oh
1 r
1 in=0.09 mi
N
_ . 1in=480ft call
City of Oshkosh maps end data are intended to be used for general AenTicaton purposes only,and C fly
the City of Oshkosh assumes no Eabiity for the accuracy of the information. Those using the Printing Date:411312018 or
hformation are responsible for verifying a=racy. For fug discdaimer p#ease go to
wvw.d.oshkosh.vri.uslGlS6sda,'ma Prepared by:City of Oshkosh,WI Oshkosh
1GISlPlanning flan Commisson Site?lan Plan?.Sap Template,mad User.minak
Page 22
j;
t. k
-
xE "
Z'., ; M;
Klnrr x
�?n y
..h rarf rx�'" �-l.ms^`t,{7 eru%» rr ✓ ,.?:7+lcr=tir/s. .n- � r .'- ti aa/ ,3a'iJs, ' lr`;z"`�7�y�, �' j� r _ :'t
r,z�v' ��mss'"�r'&'✓tet.„a�%yrr ``8 Yt�N -':>-�a' r ; '�' r f,..., .J' >, �e rtt_. -
�r� E
h
t
s ,�r
—W,
�1�11� ✓/;fit'`r6cr,� .`'.✓'tt' i'- .,'�'�irK+ ��;'�-' � y✓'�3 _ y'
t
��yff,. '� f � J ��/Y � � ,�. } ���5x� ���ri1tz.� L, .✓w” .a `:�_. 1.m-�.s, v I Y.,a',- I�
- 9
- I
i r
i r
t�
r 1.
r
r i s r r
H'Fsj,u',-<f � �� � `�` � -°' "�'=,✓ rs 5 � _ � ? = .[ y" r-l _,. J ! s�,.r��.^,' r y
2=f�. � ?'' -r r✓,,c �, 'r' i' �.-r'r� E� f ✓ f :�r�
3
} f.
— N
�� �� ► 1 in=0.82 mi -
1 in= 120 ft6.1
,
City of Oshkosh maps and data are kttended to be used for general ident cation purposes orty,and
{;ity, c
the City of Oshkoshare
assumes o lability for ac accuracy r the infatuation. Those using the Printing tate;4/13/2018 Oshkosh
lnformafion �e rospons'h'o for verifyktg accuracy For full discia�mer please go to
vtnw.a.oshkosh.�ri.uslG#5dsdamer Prepared by: City of Oshkosh,WI
JAC]SFanningTlan Commission Site Plan Map Temo'.Wtan Commsslon Site Flan P"ap Template.mxd User.m nak
Page 23