Loading...
HomeMy WebLinkAbout43. 18-246 APRIL 24, 2018 18-246 RESOLUTION (CARRIED 6-0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE CHANGE ORDER NO. 1 FOR PUBLIC WORKS CONTRACT NO. 16-22 MARION ROAD WATER TOWER REPLACEMENT (+$30,875.07) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: CHICAGO BRIDGE AND IRON, LLC 14109 South Route 59 Plainfield, IL 60544 Net Increase to contract: $30,875.07 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 0541-1810-1799-00000 Water Utility- Construction in Progress City of� Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Stephan M. Brand, Public Works Utility Bureau Manager J `V I Ta - DATE: April 19, 2018 RE: Approve Change Order No. 1 for Public Works Contract No. 16-22 Marion Road Water Tower Replacement CB&I Inc. (+$30,875.07) BACKGROUND Change Order No.1 for Contract 16-22 is scheduled for consideration by the Common Council at the April 24, 2018 meeting. The contract was originally awarded to CB&I Inc. in July of 2016. This change order is for changes due to unforeseen conditions and adjustments made during construction. ANALYSIS The following is a summary of changes and associated costs for this change order: 1:\ Engineering\2016 CONTRACTS\ 16-22 Marion Rd Wtr Twr Page 1 Of 2 Repl \ Projed_Information\ Correspondence \ Memo \16-22 Memo for CO #1-4-19-18.docx Field Order Item No. Description Action Amount Reduce size of valve vault and person door to match with 1a. 01 Contractor's foundation and welding designs Deduct -$17,538.00 Modify water main to provide greater operational flexibility; modify site storm water features to provide an 1b. 02 increased level of storm water management Add +$29,218.71 Enclose dry riser tube at tower roof to mitigate water 1c. 04 quality issues Add +$10,508.75 1d. 05 Substitute grade of stainless steel pipe material Deduct -$9,975.00 Change buried water main alignment due to unforeseen 1e. 06 conflict with sewer pipe Add +$13,370.38 Extend tank vent to mitigate potential blockage by 1f. 07 accumulated snow Add +$5,290.23 TOTAL VALUE OF CHANGE ORDER NO. 1 +$30,875.07 1:\ Engineering\2016 CONTRACTS\ 16-22 Marion Rd Wtr Twr Page 1 Of 2 Repl \ Projed_Information\ Correspondence \ Memo \16-22 Memo for CO #1-4-19-18.docx FISCAL IMPACT The contract price was $3,624,000. The total cost of this change order is $30,875.07, a 0.85% increase in project cost, bringing the total contract price to $3,654,875.07. Funding is available within the Capital Improvements Program (CIP) for this change order. Various CIP years have allocated a total of $4,933,150 for this project. This change order will increase the total project cost, including engineering, environmental, and other ancillary costs to approximately $4,821,500. RECOMMENDATIONS I recommend approval of Change Order No. 1 to Contract No. 16-22, in the amount of $30,875.07 to CB&I Inc. Approved: rk A. Rohloff City Manager SMB/tlt 1: \ Engineering \ 2016 CONTRACTS\16-22 Marion Rd WtrTwr Page 2 of 2 Repl \ Project -Information \ Correspondence \ Memo \ 16-22 Memo for CO Ul_4-19-18.docx Change Order No.1 December 3, 2017 City of Oshkosh Contract No. 16-22 Marion Road Water Tower Replacement Project Contractor: Chicago Bridge and Iron, LLC This document shall become a supplement to City of Oshkosh Contract No. 16-22 and all provisions will apply hereto. TABLE 1 Description of Requested Changes Item FO No. Description Action Amount la. 01 Reduce size of valve vault and person door to facilitate construction Deduct $17,538.00 1b. 02R Modify watermain to provide greater operational flexibility; modify site storm Add $29,218.71 water features to better meet area storm water management objectives 1c. 04 Enclose dry riser tube at tower roof to mitigate water quality issues Add $10,508.75 id. 05 Substitute grade of stainless steel pipe material Deduct $9,975.00 1e. 06 Relocated watermain to avoid conflict with sewer. Actual sewer location Add $13,370.38 differed from available records. 1f. 07 Extend tank vent to mitigate potential blockage by accumulated snow Add $5,290.23 TOTAL VALUE OF CHANGE ORDER NO. 1 Add $30,875.07 TABLE 2 Adjustments to Contract Price and Contract Time Contract Price Adjustment Amount Original Contract Price $3,624,000.00 Previous Change Orders $0.00 Adjustments in Contract Price this Change Order $30,875.07 Current Contract Price including this Change Order $3,654,875.07 Contract Duration Adjustment Duration Original Contract Duration 730 days Previous Change Orders 0 days Adjustment to Contract Duration this Change Order 0 days Current Contract Duration including this Change Order 730 days Revised Contract Substantial Completion Date August 2, 2018 RECOMMENDED " ael, � � z 1 /4, la'D, Q Engineer — CH2M HILL Engineers, Inc. Date APPROVED oor — Chicago Bridge & Iron, LLC. Date APPROVED BY OWNER City Manager Date City Clerk Date I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin under this Change Order. City Comptroller APPROVED AS TO FORM City Attorney Date Date