Loading...
HomeMy WebLinkAbout0104568-BuildingOSHKOSH ON THE WATER .lob Address 927 W 10TH AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner TIMOTHYA/ELAIN SCHULZ Contractor OWNER Category 140 - Interior Remodeling No 104568 Create Date 10/03/2003 Plan Type IO Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/ Redrywalling and insulating the 2nd floor. Owner has handout and understands any need for fire stopping and headers that may need to of Work be installed. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $1,000.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Date 10/03/2003 Final/O.P. 00/00/0000 Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 927W 10TH AVE Agent/Owner OSHKOSH WI 54902 - 6307 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.