Loading...
HomeMy WebLinkAbout10. 18-184 APRIL 10, 2018 18-184 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN ) PURPOSE: AWARD SID FOR PUBLIC WORKS CONTRACT NO. 18-15 TO HIGHWAY LANDSCAPING, INC. FOR FIELD OPERATIONS BIOFILTER LANDSCAPING ($54,550.00) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the City of Oshkosh has heretofore advertised for bids for field operations biofilter landscaping in the City of Oshkosh; and WHEREAS,upon the opening and tabulation of bids, the following is the only bid: HIGHWAY LANDSCAPING, INC. 1900 Boehm Drive Little Chute, WI 54140 Total Bid: $54,550.00 WHEREAS, this bid meets the minimum specifications and staff has reviewed the bid and recommends its acceptance. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 0323-0450-7216-06810 Equipment/Property Fund —Land Improvements City o� Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Co n Council FROM: James Rabe, Director of Public Works DATE: April 5, 2018 RE: Award Bid for Public Works Contract No. 18-15 for Field Operations Biofilter Landscaping Highway Landscaping, Inc. ($54,550) BACKGROUND The major site construction activities at the Field Operations Facility are complete. Staff performed some landscaping activities on site, while contractors were necessary for some of the more indepth work, including the biofilter plantings. In 2017, a contractor completed the initial landscaping efforts on site, which included all work except the biofilter by the staff parking lot. The landscaping of this last biofilter is all that remains of the necessary landscaping installation, in compliance with the Zoning Code. ANALYSIS Engineering staff reviewed one (1) bid. The low bid was received from Highway Landscapers, Inc. of Little Chute, Wisconsin. The total bid is $54,550. FISCAL IMPACT Funding for the project is in the 2018 Capital Improvement Program (CIP). Following is a summary of the available funds and the construction costs. CIP Section ClP Funds Budgeted Construction Costs Property Improvements -$55,000 $54,550 Totals $55,000 $54,550 Note: the budget line item denoted with an asterisk (*) include budget transfers from other projects that have come in under budget or are anticipated to come in under budget. RECOMMENDATIONS I recommend award to the low bidder, Highway Landscapers, Inc. in the amount of $54,550. Approved: 4�— Mark A. Rohloff City Manager JER/tlt 1: \ Engineering\2018 CONTRACTS \ 18-15 Field Ops Biofilters\ Project_Information\ Correspondence \Memo \18-15 Memo for Bid Award_45-18.docx Contract 18-15 - Field Operations Biofilter Landscaping (#5632727) Owner: City of Oshkosh, WI Solicitor: City of Oshkosh, WI Bid Opening: 04/03/2018 10:00 AM CDT Highway Landscapers, Inc. 1900 Boehm Drive Little Chute, WI 54140 Section Title Item Code Item Description UofM Quantity Unit Price Extension Section 1: $54,550.00 2660 Furnish and install biofilter plantings; complete as specified Lump Sum 1.00 $54,550.00 $54,550.00 Bid Total: I I$54,550.00 1:\Engineering\2018 CONTRACTS\ 18-15 Field Ops Biofiltem\Pr,iect_Information\Contract Info\18-15 Bid Tab 4-3-18 Page 1 of 1 4/4/2018