Loading...
HomeMy WebLinkAbout10. 18-152 MARCH 27, 2018 18-152 RESOLUTION (CARRIED 6-0 LOST LAID OVER WITHDRAWN ) PURPOSE: AWARD SID FOR PUBLIC WORKS CONTRACT NO. 18-06 TO AL DIX CONCRETE, INC. FOR ANNUAL CONCRETE SIDEWALK (NEW & REHABILITATION) ($1,279,130.00) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the City of Oshkosh has heretofore advertised for bids for various concrete sidewalk repairs new and rehabilitation in the City of Oshkosh; and WHEREAS,upon the opening and tabulation of bids, it appears that the following is the most advantageous bid: AL DIX CONCRETE, INC. 401 Gertrude Street Kaukauna, WI 54130 Total Bid: $1,279,130.00 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. Nos. 311-0410-7480-00000 Sidewalk Construction Fund 317-0410-7480-03304 Special Assessments Fund — Sidewalks 315-0410-7480-00000 Street Improvement Fund Expenditures 0317-0410-7480-03301 Special Assessments Fund - Streets 0541-1810-1799-00000 Water Utility— Construction in Progress 541-1867-6401-08673 Water Utility—Maintenance of Mains MARCH 27, 2018 18-152 RESOLUTION CONT'D 541-1867-6401-08675 Water Utility-Maintenance of Services 0322-1040-7216-05801 Enterprise Capital Fund -Land Improvement 0323-0740-7216-06516 Property Improvement Fund - Land Improvement City o� Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works!5 DATE: March 22, 2018 RE: Award Bid for Public Works Contract No. 18-06 / Concrete Sidewalk (New & Rehabilitation) Al Dix Concrete, Inc. / ($1,279,130) BACKGROUND The purpose of this project is to repair existing sidewalks, driveway aprons, and handicap ramps; install new sidewalks; and complete street or sidewalk repairs at Water Utility excavations. The approximate boundary of the neighborhoods for sidewalk repair is north of the Fox River, east of the Fox River, west of Mount Vernon Street, and south of West New York Avenue. Sidewalk will also be replaced at the Convention Center and street patching will occur on South Westfield Street, from West 51h Avenue to West 91h Avenue. ANALYSIS Engineering staff reviewed 2 bids. The low bid was received from Al Dix Concrete, Inc. of Kaukauna, Wisconsin. The total bid is $1,279,130. FISCAL IMPACT Funding for the sidewalk rehabilitation portion of the project is in the 2018 Capital Improvements Program (CIP) Sidewalk Section and in the Water Utility Operating Budget. Funding for the sidewalk improvements at the Convention Center will be coming from the Oshkosh Convention Center Ceape Island Concrete Reconstruction project in the Property Improvements section of the 2018 CIP. Funding for the South Westfield Street street patches is available from previous projects coming under budget. Following is a summary of the available funds and the estimated total construction cost, including ancillary costs such as engineering fees, landfill tipping fees, construction materials testing fees, and other construction related expenses. Property owners are invoiced for the cost of sidewalk and driveway apron repairs abutting their property. 1:\Engineering\2018CONTRACPS\18-06 Sidewalk Page 1 of 2 Rehab \ Project_Information \ Correspondence \ Memo \ 18-06 Memo for Bid Award_3-22-18.docx CIP Section CIP Funds Budgeted Construction Costs with Engr CIP - Street -$200,000 $188,047 CIP - Sidewalk -$970,000 $943,080 Water Utility Operating (See Note) $220,000 $216,038 Property Improvements $79,000 $75,170 Totals $1,469,000 $1,422,335 Note: Water Utility Operating Budget contains $1,029,200 for maintenance of Mains and Services. Only the amount needed for repairing concrete pavement is shown as the funds are used for all maintenance items. Note: the budget lines item denoted with an asterisk (*) include budget transfers from other projects that have come in under budget or are anticipated to come in under budget. RECOMMENDATIONS I recommend award to the low bidder, Al Dix Concrete, Inc., for the amount of $1,279,130. Approved: Mark A. Rohloff City Manager SMG/tlt 1: \Engineering\ 2018 CONTRACTS\18-06 Sidewalk Page 2 of 2 Rehab \ Project_tnformation\ Correspondence \ Memo \ 18-06 Memo for Bid Award_3-22-18.docx Contract 18-06 - Concrete Sidewalk (Nev, and Rehabilitation) (45549630) Owner. City of Oshkosh, Wl Solicitor. City of Oshkosh, WI Bid Opening: 03/06/201810-00 AM CST Al Dix Concrete, Inc. Fischer-Ulman Construction, Inc. 401 Gertrude Street Kaukauna, WI 54130 Section Title It.. Code Item Desorption UofM Quantity Unit Price Extension Unit Price Extension Section 1: Work Unit A $1,141,SS0.00 $1,160,550.00 aving conrrere an asphalt sidewalk and driveway; complete as A-1120 specified Square Feet 90,00D.00 $1.50 $135,000.00 $1.50 $135,000.00 removal and repl—t; including wing; pavement ties; dowel bars; bond breaker, integral curb and fine grading; turf restoration; and traffic control; complete as A-1308 specified Square Yards 1,000.00 $68.00 $68,0110.110 $78.00 $78,000.00 removal and replacement including wing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as A-1318 specified Square Yards 1,500.00 $75.00 $112,5110.00 $84.00 $126,000.00 HES removal and replacement including wing; pavement ties; dowel bars; bond breaker, integral curb and fine grading; turf restoration; and traffic Control; —plate as A-1319 specified Square Yards 500.00 $83.00 $41,500.00 $86.00 $43,000.00 Adjust manholes and Wets; complete as A-1360 specified Each 10.00 $400.00 $4,000,00 $400,00 $4,000,00 Turf restoration; A-1370 curnplete as specified Square Yards 400.00 $12.00 $4,800.00 $11.00 $4,400.00 up --charge or ate son cold weather -rete pave ant; A-1390 complete as specified Cubic Yards 500.00 $9.00 $4,500.00 $16.00 $8,000.00 12" radius curb with 6" CABC and grading; A-1410 complete as specified Linear Feet 250.00 $12.00 $3,000.00 $22.00 $5,50000 gutter removal and replacement including wing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as A-1428 specified Linear Feet 750.00 $65.00 $48,750.00 545.00 $33,750.00 Ng,1 of 5 3/612018 Contract IS-%- Concrete Sidewalk (New and Rehabilitation) (155496m) Owner. City of Oshkosh, WI Solicitor- City of Oshkosh, WI Bid Opening. 0YW20181000 AM CST Ak Dix Concrete, Inc Fischer-Ulman Construction, Inc. 401 Gertrude Street Kaukauna, WI 54130 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension gutter removal and replacement including wing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as A-1448 specified Linear Feet 750.00 $68.00 $51,000.00 548.011 $36,000.00 Sidewalk curb; complete A-1460 as specified Linear Feet 100.00 $50.00 $5,000.00 528.00 $2,800.00 4 concrete si ew with Y CABG and grading; complete as A-1500 specified Square Feet 65,000.00 $4.50 $292,500.00 $4.70 $305500.00 4 concrete sidewalk with 3" CABC and grading; in existing subdivisions; complete A-1500A as, speed Square Feet 1,500.00 $5.25 $7,875.00 $5.00 $7,500.00 sets sidewalk with 3" CABC and grading; water dept locations; complete as A-1502 specified Squme Feet 1500.00 $8.00 $12,000.00 $10.00 $15,000.00 6 concrete sidewaimi driveway/ramp with 3" CABC and grading; A-1510 complete as specified Square Feet 25,000.00 $525 $131,250.00 $5.60 $140,000.00 vete sr e driveway/camp with 3" CABC and grading; water dept. locations, A-1512 complete as specified Square Feet 1,000.00 $8.75 $8,750.00 $11.00 $11,000.00 e concrete sidew driveway/ramp with 3" CABC and grading; A-1520 complete as specified Square Feet 500.00 $8.25 $4,125.00 $9.15 $4,575.00 vete sidewalk with 3" CABC and grading; London Paver Pattern; complete as A-1526 specified Square Feet 300.00 $65.00 $19,500.00 $28.00 $8,400.00 uuro ramp delectable arcing field (natural/non-painted); A-1540 complete as specified Square Feet 500.00 $35.00 $17,500.00 534.00 $17,000.00 No. 4 reinforcing rods - deforrned;epoxy-coated; A-1550 complete as specified Linear Feet 11000.00 $250 $2,500.00 $6.30 $6,300.00 Drilled No.4 sidewalk tie bars - deformed; epoxy-coated; complete A-1560 as spedfied Each 10,000.00 $6.50 $65,000.00 $5.30 553,000.00 U.0 Weather Bring (sidewalk) - single visquine; complete as A-ISM specified Square Feet 1,001.00 $1.00 $1,000.00 $1.00 $1,000.00 Page2af5 3/6018 Contract 18-06 - Concrete Sidewalk (New and Rehabilitation) (45599630) Owner. City of Oshkosh, WI Solicitor. City of Oshkosh, WI Bid Oper"r0310612018 IOM AM CST At Dix Concrete, Inc Fischer-Ulman Construction, Inc. 401 Gertrude Street Kaakamaa, W 154130 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension weat er coenng (sidewalk) - double Asquine; complete as A-1582 specified Square Feet 1,000.00 $1.00 $1,000.00 $2.00 $2,000.00 enng (sidewalk) - double visquine with 6" hay; A-1584 cornpleU, as specified Square Feet 500.00 $1.00 M.00 $6.00 $3,000.00 U ge for late cold weather concrete sidewalk; A-1590 complete as specified Cubic Yards 500.00 $9.00 $4,500.00 $16.00 $81000.00 Sawing existing pavement; complete as A-1700 specified Linear Feet 3,000.00 $5.00 $15,000.00 $6.00 $181000.00 profile saw cut concrete curb; complete as A-1720 Jspedfid Linear Feet 150.00 $50.00 $7,500.00 $60.00 $9,000.00 Re-grade existing grav driveways; complete as A-1820 specified Square Yards 75.00 $20.00 $11500.00 $15.00 $1,125.00 5" asphaltic surface MT with 6" CABC and grading; gomplete as A-1915 specified Square Yards 500.00 $65.00 $32,500.00 $70.00 535,000.00 4 asp a tic sur ace LT with 6" CABC and grading: complete as A-1916 spedfied Square Yards 500.00 $65.00 $32,500.00 $65.00 $32,500.00 2 asphaltic sur are t with d' CABC and grading: complete as A-1917 specified Square Yards 100.00 $65.00 $6,500.00 $62.00 $6,200.00 Section 2: Work Unit B $59,440.00 $67,50.0D rem.-I and replacement, including wing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as B-1308 specified Square Yards 830.00 $68.00 $56,440.00 $78.00 $64,740.00 Crushed aggregate base complete as B-1340 specified Tons 130.00 $20.00 $2,600.00 $18.00 $2,340.00 Adjust and inlets; complete as 8-1360 specified Each 1.00 $900.00 $400.00 $425.00 $425.00 Section 3: Work Unit C $78,140.00 $72,873.00 Resn-ng co sere an asphalt sidewalk and driveway; complete as C-1120 specified Square Feet 500.001 $1.50 $750.00 $1.75 $875.00 Page3d5 3/6/1018 Contract 1806 - Concrete Sidewalk (New and Rehabilitation) (45549630) Owner. City of Oshkosh, WI Solicitor. City of Oshkosh, WI Bid Opening: 03/06/201810:00 AM CST Al Dix Concrete, Inc. Fischer-Uiman Construction, Inc. 401 Gertrude Street Kaukauna, WI 54130 Section Title Item Code Item Description U01M Quantity Unit Price Extension Unit Price Extension removal and replacement, including sawing; pavement ties; dowel bars bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as C-1318 specified Square Yards 200.00 $75.00 $15,000.011 594.1111 $16,800.00 aa- HES removal and replacemnt; including wing; p-rnent ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as C-1319 specified Square Yards 300.001 $80.00 $24,000.00 $86.00 $25,800.00 Crushed aggregate base complete as C-1340 specified Tons 200.00 $25.00 $5,000.00 $18.00 $3,600.00 Adjust manholes and infers; complete as C-1360 specified Each 3.00 $400.00 $1,200.00 $425.00 $1,275.00 gutter removal and replacemnt, including wing; pavernertt ties; dowel bars; bond breaker, integral curb and fine grading; turf restoratin; and traffic control; complete as C-1428 specified Linear Feet 200.00 $65.00 $13,000.00 $45.00 $9,000.00 e ME gutter removal and replacement including wing; p.-.-t ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as C-1448 specified Linear Feet 200.00 $68.00 $13,600.00 $48.00 $9,600.00 4 ca crete si ewIk with 3" CABC and grading; complete as C-1500 specified Square Feet X00 (10 $4.50 $2,250.00 $4.65 $2,325.00 6 concrete sidewalk/ dciv way/ramp with 3" CABC and grading; C-1510 complete as specified Square Feet 500.00 $5.25 $2,625.00 $5.50 $2,750.00 amp erecta e ming field (natural/non-painted); C-1540 complete as specified Square Feet 6.00 $35.00 $210.00 $38.00 $228.00 UFTeU No. 4 si e a tie bare - deformed; epoxy-coated; complete C-15W as specified Each 20.00 56.50 $130.00 $6.00 $120.00 Ng, 4 M 5 3/6(Jma Contract 1806 - Concrete Sidewalk (New and Rehabilitation) (15549639) Owner. City of Oshkosh, WI Solicitor. City of Oshkosh, WI Bid Opening: ON0612018 low AM CST AI Dix Concrete, Inc Fischer-Ulman Construction, Inc. 401 Gertrude Street Yankaona, WI 54130 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension C-1700 Sawing existing pavement; complete as spetified Linear Feet 75.00 $S.W $375.00 $6.00 $450.00 Base Bid Total: $1,279,130.00 $1,M,878.00 Page 5 of 5 316=8