HomeMy WebLinkAbout10. 18-152 MARCH 27, 2018 18-152 RESOLUTION
(CARRIED 6-0 LOST LAID OVER WITHDRAWN )
PURPOSE: AWARD SID FOR PUBLIC WORKS CONTRACT NO. 18-06 TO AL
DIX CONCRETE, INC. FOR ANNUAL CONCRETE SIDEWALK
(NEW & REHABILITATION) ($1,279,130.00)
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
WHEREAS, the City of Oshkosh has heretofore advertised for bids for various
concrete sidewalk repairs new and rehabilitation in the City of Oshkosh; and
WHEREAS,upon the opening and tabulation of bids, it appears that the following
is the most advantageous bid:
AL DIX CONCRETE, INC.
401 Gertrude Street
Kaukauna, WI 54130
Total Bid: $1,279,130.00
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Oshkosh that the said bid is hereby accepted and the proper City officials are hereby
authorized and directed to enter into an appropriate agreement for the purpose of same,
all according to plans, specifications, and bid on file. Money for this purpose is hereby
appropriated from:
Acct. Nos. 311-0410-7480-00000 Sidewalk Construction Fund
317-0410-7480-03304 Special Assessments Fund — Sidewalks
315-0410-7480-00000 Street Improvement Fund Expenditures
0317-0410-7480-03301 Special Assessments Fund - Streets
0541-1810-1799-00000 Water Utility— Construction in Progress
541-1867-6401-08673 Water Utility—Maintenance of Mains
MARCH 27, 2018 18-152 RESOLUTION
CONT'D
541-1867-6401-08675 Water Utility-Maintenance of Services
0322-1040-7216-05801 Enterprise Capital Fund -Land Improvement
0323-0740-7216-06516 Property Improvement Fund - Land
Improvement
City
o�
Oshkosh
MEMORANDUM
TO: Honorable Mayor and Members of the Common Council
FROM: Steven M. Gohde, Assistant Director of Public Works!5
DATE: March 22, 2018
RE: Award Bid for Public Works Contract No. 18-06 /
Concrete Sidewalk (New & Rehabilitation)
Al Dix Concrete, Inc. / ($1,279,130)
BACKGROUND
The purpose of this project is to repair existing sidewalks, driveway aprons, and handicap ramps;
install new sidewalks; and complete street or sidewalk repairs at Water Utility excavations. The
approximate boundary of the neighborhoods for sidewalk repair is north of the Fox River, east of
the Fox River, west of Mount Vernon Street, and south of West New York Avenue. Sidewalk will
also be replaced at the Convention Center and street patching will occur on South Westfield
Street, from West 51h Avenue to West 91h Avenue.
ANALYSIS
Engineering staff reviewed 2 bids. The low bid was received from Al Dix Concrete, Inc. of
Kaukauna, Wisconsin. The total bid is $1,279,130.
FISCAL IMPACT
Funding for the sidewalk rehabilitation portion of the project is in the 2018 Capital Improvements
Program (CIP) Sidewalk Section and in the Water Utility Operating Budget. Funding for the
sidewalk improvements at the Convention Center will be coming from the Oshkosh Convention
Center Ceape Island Concrete Reconstruction project in the Property Improvements section of
the 2018 CIP. Funding for the South Westfield Street street patches is available from previous
projects coming under budget. Following is a summary of the available funds and the estimated
total construction cost, including ancillary costs such as engineering fees, landfill tipping fees,
construction materials testing fees, and other construction related expenses. Property owners are
invoiced for the cost of sidewalk and driveway apron repairs abutting their property.
1:\Engineering\2018CONTRACPS\18-06 Sidewalk Page 1 of 2
Rehab \ Project_Information \ Correspondence \ Memo \ 18-06 Memo for Bid Award_3-22-18.docx
CIP Section
CIP Funds Budgeted
Construction Costs with Engr
CIP - Street
-$200,000
$188,047
CIP - Sidewalk
-$970,000
$943,080
Water Utility
Operating
(See Note) $220,000
$216,038
Property
Improvements
$79,000
$75,170
Totals
$1,469,000
$1,422,335
Note: Water Utility Operating Budget contains $1,029,200 for maintenance of Mains and Services. Only the amount
needed for repairing concrete pavement is shown as the funds are used for all maintenance items.
Note: the budget lines item denoted with an asterisk (*) include budget transfers from other projects that have come in
under budget or are anticipated to come in under budget.
RECOMMENDATIONS
I recommend award to the low bidder, Al Dix Concrete, Inc., for the amount of $1,279,130.
Approved:
Mark A. Rohloff
City Manager
SMG/tlt
1: \Engineering\ 2018 CONTRACTS\18-06 Sidewalk Page 2 of 2
Rehab \ Project_tnformation\ Correspondence \ Memo \ 18-06 Memo for Bid Award_3-22-18.docx
Contract 18-06 - Concrete Sidewalk (Nev, and Rehabilitation) (45549630)
Owner. City of Oshkosh, Wl
Solicitor. City of Oshkosh, WI
Bid Opening: 03/06/201810-00 AM CST
Al Dix Concrete, Inc.
Fischer-Ulman Construction, Inc.
401 Gertrude Street
Kaukauna, WI 54130
Section Title
It.. Code
Item Desorption
UofM
Quantity
Unit Price
Extension
Unit Price
Extension
Section 1: Work Unit A
$1,141,SS0.00
$1,160,550.00
aving conrrere an
asphalt sidewalk and
driveway; complete as
A-1120
specified
Square Feet
90,00D.00
$1.50
$135,000.00
$1.50
$135,000.00
removal and
repl—t; including
wing; pavement ties;
dowel bars; bond
breaker, integral curb
and fine grading; turf
restoration; and traffic
control; complete as
A-1308
specified
Square Yards
1,000.00
$68.00
$68,0110.110
$78.00
$78,000.00
removal and
replacement including
wing; pavement ties;
dowel bars; bond
breaker; integral curb
and fine grading; turf
restoration; and traffic
control; complete as
A-1318
specified
Square Yards
1,500.00
$75.00
$112,5110.00
$84.00
$126,000.00
HES removal and
replacement including
wing; pavement ties;
dowel bars; bond
breaker, integral curb
and fine grading; turf
restoration; and traffic
Control; —plate as
A-1319
specified
Square Yards
500.00
$83.00
$41,500.00
$86.00
$43,000.00
Adjust manholes and
Wets; complete as
A-1360
specified
Each
10.00
$400.00
$4,000,00
$400,00
$4,000,00
Turf restoration;
A-1370
curnplete as specified
Square Yards
400.00
$12.00
$4,800.00
$11.00
$4,400.00
up --charge or ate
son cold weather
-rete pave ant;
A-1390
complete as specified
Cubic Yards
500.00
$9.00
$4,500.00
$16.00
$8,000.00
12" radius curb with 6"
CABC and grading;
A-1410
complete as specified
Linear Feet
250.00
$12.00
$3,000.00
$22.00
$5,50000
gutter removal and
replacement including
wing; pavement ties;
dowel bars; bond
breaker; integral curb
and fine grading; turf
restoration; and traffic
control; complete as
A-1428
specified
Linear Feet
750.00
$65.00
$48,750.00
545.00
$33,750.00
Ng,1 of 5 3/612018
Contract IS-%- Concrete Sidewalk (New and Rehabilitation) (155496m)
Owner. City of Oshkosh, WI
Solicitor- City of Oshkosh, WI
Bid Opening. 0YW20181000 AM CST
Ak Dix Concrete, Inc
Fischer-Ulman Construction, Inc.
401 Gertrude Street
Kaukauna, WI 54130
Section Title
Item Code
Item Description
UofM
Quantity
Unit Price
Extension
Unit Price
Extension
gutter removal and
replacement including
wing; pavement ties;
dowel bars; bond
breaker; integral curb
and fine grading; turf
restoration; and traffic
control; complete as
A-1448
specified
Linear Feet
750.00
$68.00
$51,000.00
548.011
$36,000.00
Sidewalk curb; complete
A-1460
as specified
Linear Feet
100.00
$50.00
$5,000.00
528.00
$2,800.00
4 concrete si ew
with Y CABG and
grading; complete as
A-1500
specified
Square Feet
65,000.00
$4.50
$292,500.00
$4.70
$305500.00
4 concrete sidewalk
with 3" CABC and
grading; in existing
subdivisions; complete
A-1500A
as, speed
Square Feet
1,500.00
$5.25
$7,875.00
$5.00
$7,500.00
sets sidewalk
with 3" CABC and
grading; water dept
locations; complete as
A-1502
specified
Squme Feet
1500.00
$8.00
$12,000.00
$10.00
$15,000.00
6 concrete sidewaimi
driveway/ramp with 3"
CABC and grading;
A-1510
complete as specified
Square Feet
25,000.00
$525
$131,250.00
$5.60
$140,000.00
vete sr e
driveway/camp with 3"
CABC and grading;
water dept. locations,
A-1512
complete as specified
Square Feet
1,000.00
$8.75
$8,750.00
$11.00
$11,000.00
e concrete sidew
driveway/ramp with 3"
CABC and grading;
A-1520
complete as specified
Square Feet
500.00
$8.25
$4,125.00
$9.15
$4,575.00
vete sidewalk
with 3" CABC and
grading; London Paver
Pattern; complete as
A-1526
specified
Square Feet
300.00
$65.00
$19,500.00
$28.00
$8,400.00
uuro ramp delectable
arcing field
(natural/non-painted);
A-1540
complete as specified
Square Feet
500.00
$35.00
$17,500.00
534.00
$17,000.00
No. 4 reinforcing rods -
deforrned;epoxy-coated;
A-1550
complete as specified
Linear Feet
11000.00
$250
$2,500.00
$6.30
$6,300.00
Drilled No.4 sidewalk
tie bars - deformed;
epoxy-coated; complete
A-1560
as spedfied
Each
10,000.00
$6.50
$65,000.00
$5.30
553,000.00
U.0 Weather Bring
(sidewalk) - single
visquine; complete as
A-ISM
specified
Square Feet
1,001.00
$1.00
$1,000.00
$1.00
$1,000.00
Page2af5 3/6018
Contract 18-06 - Concrete Sidewalk (New and Rehabilitation) (45599630)
Owner. City of Oshkosh, WI
Solicitor. City of Oshkosh, WI
Bid Oper"r0310612018 IOM AM CST
At Dix Concrete, Inc
Fischer-Ulman Construction, Inc.
401 Gertrude Street
Kaakamaa, W 154130
Section Title
Item Code
Item Description
UofM
Quantity
Unit Price
Extension
Unit Price
Extension
weat er coenng
(sidewalk) - double
Asquine; complete as
A-1582
specified
Square Feet
1,000.00
$1.00
$1,000.00
$2.00
$2,000.00
enng
(sidewalk) - double
visquine with 6" hay;
A-1584
cornpleU, as specified
Square Feet
500.00
$1.00
M.00
$6.00
$3,000.00
U ge for late
cold weather
concrete sidewalk;
A-1590
complete as specified
Cubic Yards
500.00
$9.00
$4,500.00
$16.00
$81000.00
Sawing existing
pavement; complete as
A-1700
specified
Linear Feet
3,000.00
$5.00
$15,000.00
$6.00
$181000.00
profile saw cut concrete
curb; complete as
A-1720
Jspedfid
Linear Feet
150.00
$50.00
$7,500.00
$60.00
$9,000.00
Re-grade existing grav
driveways; complete as
A-1820
specified
Square Yards
75.00
$20.00
$11500.00
$15.00
$1,125.00
5" asphaltic surface MT
with 6" CABC and
grading; gomplete as
A-1915
specified
Square Yards
500.00
$65.00
$32,500.00
$70.00
535,000.00
4 asp a tic sur ace LT
with 6" CABC and
grading: complete as
A-1916
spedfied
Square Yards
500.00
$65.00
$32,500.00
$65.00
$32,500.00
2 asphaltic sur are t
with d' CABC and
grading: complete as
A-1917
specified
Square Yards
100.00
$65.00
$6,500.00
$62.00
$6,200.00
Section 2: Work Unit B
$59,440.00
$67,50.0D
rem.-I and
replacement, including
wing; pavement ties;
dowel bars; bond
breaker; integral curb
and fine grading; turf
restoration; and traffic
control; complete as
B-1308
specified
Square Yards
830.00
$68.00
$56,440.00
$78.00
$64,740.00
Crushed aggregate base
complete as
B-1340
specified
Tons
130.00
$20.00
$2,600.00
$18.00
$2,340.00
Adjust and
inlets; complete as
8-1360
specified
Each
1.00
$900.00
$400.00
$425.00
$425.00
Section 3: Work Unit C
$78,140.00
$72,873.00
Resn-ng co sere an
asphalt sidewalk and
driveway; complete as
C-1120
specified
Square Feet
500.001
$1.50
$750.00
$1.75
$875.00
Page3d5 3/6/1018
Contract 1806 - Concrete Sidewalk (New and Rehabilitation) (45549630)
Owner. City of Oshkosh, WI
Solicitor. City of Oshkosh, WI
Bid Opening: 03/06/201810:00 AM CST
Al Dix Concrete, Inc.
Fischer-Uiman Construction, Inc.
401 Gertrude Street
Kaukauna, WI 54130
Section Title
Item Code
Item Description
U01M
Quantity
Unit Price
Extension
Unit Price
Extension
removal and
replacement, including
sawing; pavement ties;
dowel bars bond
breaker; integral curb
and fine grading; turf
restoration; and traffic
control; complete as
C-1318
specified
Square Yards
200.00
$75.00
$15,000.011
594.1111
$16,800.00
aa-
HES removal and
replacemnt; including
wing; p-rnent ties;
dowel bars; bond
breaker; integral curb
and fine grading; turf
restoration; and traffic
control; complete as
C-1319
specified
Square Yards
300.001
$80.00
$24,000.00
$86.00
$25,800.00
Crushed aggregate base
complete as
C-1340
specified
Tons
200.00
$25.00
$5,000.00
$18.00
$3,600.00
Adjust manholes and
infers; complete as
C-1360
specified
Each
3.00
$400.00
$1,200.00
$425.00
$1,275.00
gutter removal and
replacemnt, including
wing; pavernertt ties;
dowel bars; bond
breaker, integral curb
and fine grading; turf
restoratin; and traffic
control; complete as
C-1428
specified
Linear Feet
200.00
$65.00
$13,000.00
$45.00
$9,000.00
e ME
gutter removal and
replacement including
wing; p.-.-t ties;
dowel bars; bond
breaker; integral curb
and fine grading; turf
restoration; and traffic
control; complete as
C-1448
specified
Linear Feet
200.00
$68.00
$13,600.00
$48.00
$9,600.00
4 ca crete si ewIk
with 3" CABC and
grading; complete as
C-1500
specified
Square Feet
X00 (10
$4.50
$2,250.00
$4.65
$2,325.00
6 concrete sidewalk/
dciv way/ramp with 3"
CABC and grading;
C-1510
complete as specified
Square Feet
500.00
$5.25
$2,625.00
$5.50
$2,750.00
amp erecta e
ming field
(natural/non-painted);
C-1540
complete as specified
Square Feet
6.00
$35.00
$210.00
$38.00
$228.00
UFTeU No. 4 si e a
tie bare - deformed;
epoxy-coated; complete
C-15W
as specified
Each
20.00
56.50
$130.00
$6.00
$120.00
Ng, 4 M 5 3/6(Jma
Contract 1806 - Concrete Sidewalk (New and Rehabilitation) (15549639)
Owner. City of Oshkosh, WI
Solicitor. City of Oshkosh, WI
Bid Opening: ON0612018 low AM CST
AI Dix Concrete, Inc
Fischer-Ulman Construction, Inc.
401 Gertrude Street
Yankaona, WI 54130
Section Title Item Code
Item Description UofM Quantity
Unit Price
Extension
Unit Price Extension
C-1700
Sawing existing
pavement; complete as
spetified Linear Feet 75.00
$S.W
$375.00
$6.00 $450.00
Base Bid Total:
$1,279,130.00
$1,M,878.00
Page 5 of 5 316=8