Loading...
HomeMy WebLinkAbout01. 18-145 MARCH 27, 2018 18-145 RESOLUTION (CARRIED 6-0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE FINAL RESOLUTION FOR SPECIAL ASSESSMENTS - CONTRACT NO. 18-04 PAVING, SIDEWALK, DRIVEWAY AND UTILITIES / FIRST LOCAL STREET CONCRETE PAVING PROGRAM / COURT STREET (FOX RIVER TO WASHINGTON AVENUE) / OTTER AVENUE (STATE STREET TO RAILROAD TRACKS) /WASHINGTON AVENUE (NORTH MAIN STREET TO BROAD STREET) / OSCEOLA STREET (PEARL AVENUE TO 115' SOUTHWEST OF HIGH AVENUE) / JEFFERSON STREET (WASHINGTON AVENUE TO 230' NORTH OF WASHINGTON AVENUE)/STATE STREET (OTTER AVENUE TO WASHINGTON AVENUE) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the Common Council of the City of Oshkosh held a public hearing on the 27th day of March, 2018, at 6:00 p.m. for the purpose of hearing all interested persons concerning the preliminary resolution and report of the City Manager (Board of Public Works) on the proposed improvements as listed below, pursuant to the amended initial resolution adopted February 27, 2018,by the Oshkosh Common Council of the following named streets: Concrete Pavement, Asphalt Pavement, Sidewalk, Driveway Aprons, Sanitary Sewer Laterals (New and Relay), Storm Sewer Laterals (New and Relay), and Water Laterals (New and Relay): Court Street from the Fox River to Washington Avenue Otter Avenue from State Street to the Railroad Tracks Washington Avenue from North Main Street to Broad Street Osceola Street from Pearl Avenue to 115' southwest of High Avenue Jefferson Street from Washington Avenue to 230' north State Street from Otter Avenue to Washington Avenue MARCH 27, 2018 18-145 RESOLUTION CONT'D NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh as follows: 1. That the proposed street grade(s), from a datum plane established by the official United States Coast and Geodetic Survey, as identified and on file in the Department of Public Works is/are hereby permanently established. 2. The Common Council for the City of Oshkosh hereby orders that new sidewalk be constructed according to the established grade pursuant to Section 66.0907 of the Wisconsin Statutes and the ordinances of the City of Oshkosh at the following locations: Court Street (west side) - Ceape Avenue to 260' S of Ceape Avenue 3. That the report of the City Manager, acting as the Board of Public Works, pertaining to the construction of the above described public improvements, including plans and specifications therefor, is hereby adopted and approved with the following modifications: a. b. C. 4. That the action of the City Manager in advertising for bids and to carry out the work of such improvements in accordance with the reports of the City Manager and in accordance with the said resolution heretofore adopted, is hereby approved, ratified and confirmed. 5. That payment for said improvements be made by assessing the cost to the property benefited as indicated in said report, except as modified herein. 6. Assessments shown on the report represent an exercise of the police power and have been determined on a reasonable basis and are hereby confirmed. MARCH 27, 2018 18-145 RESOLUTION CONT'D 7. That the assessments for all projects included in said report are hereby combined as a single assessment but any interested property owners shall be entitled to object to each assessment separately or all assessments jointly for any purpose or purposes. 8. That the assessments may be paid in cash, or in installments pursuant to Section 25-83 thru 25-89 of the Oshkosh Municipal Code, said deferred payments to bear interest at the rate of six percent (6%) per annum on the unpaid balance. The City Clerk shall publish an installment assessment notice in accordance with Section 66.0715(3)(e) of the Wisconsin Statutes in the official newspaper of the City. 9. The City Clerk is directed to publish this resolution in the OSHKOSH DAILY NORTHWESTERN, the official newspaper of the City. 10. The City Clerk is further directed to mail a copy of this resolution to every property owner whose name appears on the assessment roll whose post office address is known or can with reasonable diligence be ascertained. March 16, 2018 Dear Property Owner: Please find enclosed the following documents for your information and review: A letter of explanation from Public Works Assistant Director Steven Gohde. 1A. Information sheet on parking during construction. 113. Information sheet on lead service line replacement program. 2. The Initial Resolution adopted by the Oshkosh Common Council, which began the process for the improvement(s) adjacent to your property. 3. Notice of Public Hearing to be held by the Oshkosh Common Council on March 27, 2018 regarding assessments, which will be set with the adoption of the final resolution, also scheduled for adoption on March 27, 2018. 4. Special assessment payment plan options explaining the payment choices after Contract No. 18-04 is certified as complete — payment choice or payment is not accepted at this time. 5. Assessment sheet indicating properties involved in the proposed project, the property footage, price per foot and estimated total assessment to the property. If you wish to appear before the Council before the final resolution is adopted to proceed with the construction, please refer to the 'Notice of Public Hearing" enclosed. If you have any questions regarding the above listed documents, please contact the Public Works Department (236-5065) or the City Clerk (236-5011), Monday through Friday, 8:00 a.m. until 4:30 p.m. Sincerely, CITY OF OSHKOSH , CLll PAMELA R. UBRIG City Clerk City of Oshkosh 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54902-1130 Pamela R. Ubrig City Clerk "AV Angela J. Joeckel Deputy City Clerk Oshkosh Emily E. Karl Election Aide March 16, 2018 Dear Property Owner: Please find enclosed the following documents for your information and review: A letter of explanation from Public Works Assistant Director Steven Gohde. 1A. Information sheet on parking during construction. 113. Information sheet on lead service line replacement program. 2. The Initial Resolution adopted by the Oshkosh Common Council, which began the process for the improvement(s) adjacent to your property. 3. Notice of Public Hearing to be held by the Oshkosh Common Council on March 27, 2018 regarding assessments, which will be set with the adoption of the final resolution, also scheduled for adoption on March 27, 2018. 4. Special assessment payment plan options explaining the payment choices after Contract No. 18-04 is certified as complete — payment choice or payment is not accepted at this time. 5. Assessment sheet indicating properties involved in the proposed project, the property footage, price per foot and estimated total assessment to the property. If you wish to appear before the Council before the final resolution is adopted to proceed with the construction, please refer to the 'Notice of Public Hearing" enclosed. If you have any questions regarding the above listed documents, please contact the Public Works Department (236-5065) or the City Clerk (236-5011), Monday through Friday, 8:00 a.m. until 4:30 p.m. Sincerely, CITY OF OSHKOSH , CLll PAMELA R. UBRIG City Clerk 0 f CITY HALL 215 Church Avenue P.O. Box 1130 y osnkoss4903-1 30 City of Oshkosh hL (0 O.IHKOlH March 16, 2018 Subject: Assessments for Concrete Paving, Asphalt Paving, Sanitary Sewer Laterals (New & Relay), Water Laterals (New and Relay), Storm Sewer Laterals (New and Relay), Sidewalk Repair, New Sidewalk, and Concrete Drive Approaches Contract 18-04 To Property Owners on: ➢ COURT STREET, from the Fox River to Washington Avenue ➢ OTTER AVENUE, from State Street to the Railroad Tracks ➢ WASHINGTON AVENUE, from North Main Street to Broad Street ➢ OSCEOLA STREET, from Pearl Avenue to 115' southwest of High Avenue ➢ JEFFERSON STREET, from Washington Avenue to 230' north of Washington Avenue ➢ STATE STREET, from Otter Avenue to Washington Avenue A public hearing is scheduled for Tuesday, March 13, 2018, in the Common Council Chambers at City Hall to consider improvements to your street. Staff will be available beginning at 4:45 p.m. in Room 310 of City Hall to answer questions about the project and the estimated costs. Residents may also call the Department of Public Works Engineering Division at (920)236-5065 to have questions answered. The City has implemented a way for you to receive project updates via e-mail. The updates will provide information about access and construction progress. To receive these updates, please send a blank e-mail to contractl804-subscribe@lists.ci.oshkosh.wi.us. You will receive an e-mail stating your subscription request has been received. You must reply to the message within five (5) days to complete the subscription. The City will stop sending updates upon completion of the project. If at any time you wish to unsubscribe, please send an e-mail to this address, contractl804- unsubscribe@lists.ci.oshkosh.wi.us. The public hearing covers the proposed improvements, which include the following: paving, utilities, sidewalks, and/or driveway approaches and the levy of special assessments that partially cover the cost of the improvements. Assessments are not due until the project is certified as complete and these charges can be paid by any one (1) of the plans as outlined by the City Clerk's information on payment plan options. Based upon the City of Oshkosh special assessment policy, the assessable portions of the project have been identified and are outlined on the attached assessment worksheet(s). The estimated distance for construction on side streets is estimated high to allow adequate area for the new construction to be transitioned to the existing pavement. The quantities A 1: \Engineering\ 2018 CONTRACTS \18-04 Cone Paving& Page 1 of 160 Util\ Project_Information\Correspondence\Letters\18-04 Assessments Letter 41_3-16-18.docx and costs are estimates and will be adjusted to the actual quantity installed. Unit costs will be adjusted according to the assessment policy based on bid prices. The estimated quantities for sidewalk include up to six (6) additional squares of sidewalk to allow for private utility lateral construction. Only squares actually removed and replaced to repair defective sidewalk or facilitate the private utility lateral construction will be billed to the property owner. Additional sidewalk squares removed will not be billed to the property owner if the Construction Access Agreement previously mailed to them was signed and returned by the property owner. Property owners who have not returned the Construction Access Agreement will only have partial sidewalk squares removed and patched. These property owners will be sent orders to replace the patched sidewalk with permanent concrete sidewalk in 2019. These property owners will be financially responsible for replacing all patched concrete sidewalk, all defective sidewalk, and all sidewalk that does not meet the Americans with Disabilities Act (ADA) standards. Sidewalk squares needing replacement only to meet ADA standards will not be billed to the property owner if the property owner returns the Construction Access Agreement before commencement of the street reconstruction project. - If needed, please contact the Department of Public Works Engineering Division at (920)236-5065 or attend the meeting listed above to get a copy of the agreement form. The enclosed assessment information assumes the Construction Access Agreement was signed and returned by the property owner. Enclosed with this letter is updated information about lead water services and a program to replace lead services on private property. Please review this information in Attachment 1B, in addition to this letter. The enclosed assessments do not include replacing the private lead water service line. The final assessment cost will not increase above the estimated total without another public hearing. Questions in regard to payment of Special Assessments can be answered by calling the City Clerk's office at (920)236-5011. Questions in regard to the construction project in general can be answered by calling the Department of Public Works Engineering Division at (920)236-5065. The sequence of construction has not yet been scheduled with a contractor. Signage will be placed approximately one (1) week before construction will begin to notify people. Each street identified in this year's paving program has been designated a specific time frame in which the contractor will need to complete their work on that street. The construction time frames vary from five (5) to fourteen (14) weeks depending upon the amount of work and the complexity of the work associated with a specific street. All work within this contract is scheduled to be completed by the end of November 2018. Wisconsin Public Service and other utility companies will be relocating some of their facilities prior to the City contractor beginning work. This work is not part of the above time frame. 1:\ Engineering \ 2018 CONTRACTS \ 18-04 Conc Paving & Page 2 of 4 Util \ Project_Information\ Correspondence \ Letters \ 18-04 Assessments Letter #1_3-16-18.docx A specific description of the project construction consists of the following elements: concrete pavement with curb and gutter; asphalt pavement; relay or installation of specific segments of water and sanitary sewer mains and their associated laterals at various locations along the project; relay or installation of storm sewer and storm sewer laterals, as needed, along the project to accommodate the drainage needs for the street and the adjacent properties; new concrete driveway aprons will be constructed; and the existing concrete sidewalk will be repaired, as needed. Gaps in the sidewalk system will be completed with construction of new sidewalk. It is recommended that no salt or harsh chemicals be put on the new sidewalk for one (1) year. If you know of any underground wires and/or piping (examples: invisible electric fence, conduit for exterior lighting, irrigation system, etc.) on your property which are located near the sidewalk, right-of-way, or driveways, please contact the Engineering Division as soon as possible. Any private improvements within the right-of-way, brick pavers, shrubs, lights, etc. will be removed by the contractor during construction and will not be replaced. In the event you wish to replace certain items, a permit must,be obtained from the Department of Public Works prior to your beginning the work. Prior to the completion of the project, all disturbed areas will be topsoiled, seeded, and covered with erosion mat. The property owner is responsible for watering the newly vegetated areas. The matting placed over the seed is biodegradable. Please do not remove the mat because it serves as mulch for the new grass. Please set your lawn mower to the highest setting when mowing the new grass areas until the new grass areas are well established. As part of the construction, a storm lateral is proposed to be installed for each residential lot on the project. An eight -inch (8") diameter surface drain with a slotted drain cover will be placed into your yard. The storm sewer lateral and drain will allow you to direct drainage and/or sump pump hoses to this location. This drain is connected to the storm sewer system and drains directly to local streams and lakes. The lateral is to be used for "clear water" only. "Clear water" is typically groundwater discharged by a sump pump or runoff from precipitation (i.e. rainfall or snow melt). Do not place pet waste, yard waste, or other waste material into the storm sewer system. In the event conditions on the property prevent the installation of the drain (example: a substantial retaining wall), a drain will not be installed, but the storm sewer lateral will be installed underground to the property line. You will be receiving additional information about the storm sewer lateral and drain, including a telephone number for contact to coordinate the lateral's and drain's final location. The drain is part of your private lateral and it will be yours to maintain. The drain will have a fabric filter installed as a part of the construction. Please leave the filter in place until the grass surrounding the drain is well established. The fabric will prevent dirt and debris from filling the pipe until the grass is established. The previous two (2) paragraphs assume the Construction Access Agreement was signed and returned by the property owner. Commercial parcels and parcels with parking lots will have a larger diameter storm sewer lateral stubbed onto the property. This lateral can be used to meet City code when construction work is done on the parcel. During construction, there will be periods of time when access to residential properties will be restricted. There will only be a few instances when this situation will occur. Typically, short access restrictions occur during the underground utility installation and longer restrictions occur during the placement of concrete pavement and driveways. To minimize the inconvenience, the contractor will I: \ Engineering \ 2018 CONTRACTS \ 18-04 Conc Paving & Page 3 of 4 Util \ Project_Information \ Correspondence \ Letters \ 18-04 Assessments Letter #1_3-16-18.docx provide a one-week notice prior to the access being restricted for concrete work. Per the Police Department, a Construction Parking Permit is not required to park on a street overnight, if you park within two (2) blocks of the street under construction (see enclosed information). On -street parking will not be permitted with the construction area. All "No Parking" areas and/or posted time zones must be obeyed. Vehicles parking overnight must be parked on the house address side of the street that corresponds to the current date before midnight. On odd calendar dates, the vehicles should be parked on the odd address side of the street. On even calendar dates, vehicles should be parked on the even address side of the street. Provisions will be made with the Fire Department and the Sanitation Division so fire protection and City garbage/recycling collection will continue at all times. Please ensure your City -collected garbage/recyclables are at the curbside by 7:00 a.m. on your regular collection day. Crews schedule collection of garbage/recyclables in construction areas at the start of each day. If rural -type mailboxes exist on your street, the contractor will remove them during construction. This removal will make it necessary for you to pick up your mail at the Post Office. The contractor will be responsible so as not to damage the mailboxes. Upon completion of the paving work, the contractor will reset the mailboxes. For commercial properties, the contractor is required to maintain access. Business owners are encouraged to provide the City's Engineering Division with contact information, which will be shared with the contractor. Communication between you, the City, the City's contractor, and your customers and delivery personnel will help the project proceed as quickly as possible. Although terrace trees may need to be removed at specific locations, they will be preserved as much as possible. Property owners at locations where a tree needs to be removed will receive advance notice of the removal and replacement options. Roots and branches may be cut to allow for paving operations. Cutting and pruning will either be done by, or under the direction of, the City Forester. Please feel free to contact the Public Works Engineering Division at (920)236-5065 prior to the scheduled public hearing if you have any questions on the proposed assessments or the project construction. Sincerely, k,—, � 0 k Steven M. Gohde, P.E. Assistant Director of Public Works SMG/tlt Enclosures 1:\ Engineering \ 2018 CONTRACTS \ 18-04 Conc Paving & Page 4 of 4 Util\Project_Information\Correspondence\Letters\18-04 Assessments Letter A1_3-16-18.docx City of Oshkosh Police Department 420 Jackson Street Oshkosh, WI 54901 Tel: 920-236-5720 Fax: 920-236-5087 dsmith@ci.oshkosh.wi.us PROFESSIONALISM . PRIDE • INTEGRITY e TEAMWORK Dean Smith Chief of Police As per Sections 27-27, 27-28, and 27-29 of the Municipal Code of the City of Oshkosh, there is no parking on City streets, 2 AM to 5 AM, unless the owner of vehicle was granted permission or has purchased a City parking permit. If your street or sidewalk is under construction, it is NOT necessary to obtain a parking permit if you park your car within two blocks of the street under construction. All City ordinances and parking rules/guidelines must be followed, and all posted parking restrictions, including time zones and no parking areas, must be obeyed. You will need to follow the odd -even rules. On odd days of the week, the vehicle should be parked on the side of the street with odd -numbered houses. On even days of the week, the permit holder should park on the side of the street with even -numbered houses. Each night, the car should be parked on the opposite side of the street as the night before. NOTE: Odd and even dates are figured before midnight. If parking is only allowed on one side of the street, the Odd -Even rule DOES apply. Vehicles can only park on the side of the street that does not have restricted parking and are only allowed to park overnight on the appropriate Odd -Even days. In the case of a declared Snow Emergency, parking on City streets is restricted to one side of the street using the Odd -Even rule with dates figured from noon on the calendar date to noon on the following calendar date. It is the responsibility of the vehicle owner/operator to find appropriate parking in the event of a snow emergency. Vehicles in violation of snow emergency parking will be towed at the owner's expense. Disabled vehicles are not allowed to park overnight at anytime and should be moved within 24 hours. Motor busses, truck tractors, semi -trailers and motor trucks designed, used, or maintained primarily for the transportation of property as defined in Municipal Code 27-26(3) are not permitted to park overnight on City streets. All street parking is subject to the following guidelines: • May not park in signed / designated "No Parking" areas. • Vehicles may not stop or park in a designated "Fire Lane". • No parking within 10 feet of a fire hydrant (an official traffic sign may indicate a greater distance is required). • No parking in loading zones. • No parking within 4 feet of an alley or private roadway or driveway. • No parking within 15 feet to the near limits of a crosswalk. Failure to follow the above rules could result in parking citations being issued. Individuals wishing to appeal a parking citation may do so by completing a Request to Review Parking Citation form which is available at the Oshkosh Police Department Telecommunications Desk, on the Police Department website (oshkoshpd.com) or on the City of Oshkosh website. The Mission of the Oshkosh Police Department is to promote public safety and to enhance the quality of life in our community through innovative policing and community partnerships 1 ' City of Oshkosh Police Department 420 Jackson Street Oshkosh, WI 54901 Tel: 920-236-5720 Fax: 920-236-5087 dsmith@ci.oshkosh.wi.us PROFESSIONALISM . PRIDE • INTEGRITY e TEAMWORK Dean Smith Chief of Police As per Sections 27-27, 27-28, and 27-29 of the Municipal Code of the City of Oshkosh, there is no parking on City streets, 2 AM to 5 AM, unless the owner of vehicle was granted permission or has purchased a City parking permit. If your street or sidewalk is under construction, it is NOT necessary to obtain a parking permit if you park your car within two blocks of the street under construction. All City ordinances and parking rules/guidelines must be followed, and all posted parking restrictions, including time zones and no parking areas, must be obeyed. You will need to follow the odd -even rules. On odd days of the week, the vehicle should be parked on the side of the street with odd -numbered houses. On even days of the week, the permit holder should park on the side of the street with even -numbered houses. Each night, the car should be parked on the opposite side of the street as the night before. NOTE: Odd and even dates are figured before midnight. If parking is only allowed on one side of the street, the Odd -Even rule DOES apply. Vehicles can only park on the side of the street that does not have restricted parking and are only allowed to park overnight on the appropriate Odd -Even days. In the case of a declared Snow Emergency, parking on City streets is restricted to one side of the street using the Odd -Even rule with dates figured from noon on the calendar date to noon on the following calendar date. It is the responsibility of the vehicle owner/operator to find appropriate parking in the event of a snow emergency. Vehicles in violation of snow emergency parking will be towed at the owner's expense. Disabled vehicles are not allowed to park overnight at anytime and should be moved within 24 hours. Motor busses, truck tractors, semi -trailers and motor trucks designed, used, or maintained primarily for the transportation of property as defined in Municipal Code 27-26(3) are not permitted to park overnight on City streets. All street parking is subject to the following guidelines: • May not park in signed / designated "No Parking" areas. • Vehicles may not stop or park in a designated "Fire Lane". • No parking within 10 feet of a fire hydrant (an official traffic sign may indicate a greater distance is required). • No parking in loading zones. • No parking within 4 feet of an alley or private roadway or driveway. • No parking within 15 feet to the near limits of a crosswalk. Failure to follow the above rules could result in parking citations being issued. Individuals wishing to appeal a parking citation may do so by completing a Request to Review Parking Citation form which is available at the Oshkosh Police Department Telecommunications Desk, on the Police Department website (oshkoshpd.com) or on the City of Oshkosh website. The Mission of the Oshkosh Police Department is to promote public safety and to enhance the quality of life in our community through innovative policing and community partnerships City o� Oshkosh Lead Service Line Replacement Information The purpose of this document is to inform property owners of the potential existence of a lead water service line at your property and a City program available to help you replace it. Lead service lines and home plumbing are potential sources of lead in drinking water. Lead is harmful to human health, particularly the health of small children. For this reason, the City of Oshkosh (City) uses corrosion control treatment at the water filtration plant to minimize the potential for lead in the City's drinking water. As part of a proposed 2018 construction project adjacent to/near your property, the City will replace or perform maintenance on the water main and the City -owned portion of the water service line to your home. The City owns and is responsible for maintaining the water service line up to the curb stop (the first valve) off the water main. For a vast majority of residential properties, the curb stop is typically located in the terrace or in the sidewalk adjacent to the street. The water service line from inside your building out to the curb stop is owned and maintained by the property owner. Public Service Line (may be lead) Homeowner's Responsibility o 4 City Responsibility —► L\Engineering\Tracy Taylor\Public Works Contracts\ Miscellaneous\ 2018 Lead Water Line Program Page 1 of 4 Initial Notice 2-6-18.docx Based on available information, the City believes your water service line may be constructed of lead. To determine if your water service line is lead, you may contact a certified plumber, the City's Water Utility at (920)232-5330, or perform a self -inspection. To perform the self -inspection, simply take a metal tool, like a coin, and scratch the surface of the pipe protruding from the floor or wall prior to the water meter. If the pipe is easy to scratch and the scratched area is a shiny grey color, the pipe is made of lead. The figure below provides basic guidance for performing a self -inspection: Lead is dull, very soft, and will turn a shiny silver color when scratched. Galvanized Steel Lead I, 7TOj FROM HOME WATER METER STREET Plastic Copper Magnets will ONLY stick to steel. They will NOT stick to lead or copper. Recent studies have shown that replacing only a portion of a lead service line can increase the risk of lead exposure from drinking water to the occupants. As a result, the City has implemented new policies and procedures to reduce the risk of lead exposure to its residents. The Municipal Code of the City of Oshkosh requires full Lead Service Line Replacement (LSLR), replacement of both the public and privately -owned lead service lines, within six (6) months of work on a lead water service line. To minimize exposure to this risk during construction, the City will be providing a pitcher and two (2) filter cartridges, certified for lead removal by NSF International, to each living unit on a parcel with a lead service line replacement. Because water utility revenue generated from user rates cannot be used to fund private lead service line replacement, the City applied for, and received, a principal forgiveness loan from the Wisconsin Department of Natural Resources to help reduce the cost to private property owners. The LSLR policy describes how the requirements of the Municipal Code are implemented. On June 13, 2017, the Common Council approved a "Pilot Program Lead Service Line Replacement Policy". This policy provides guidelines for cost sharing for the private -side LSLR. Generally, the policy provides a 50% cost share, to a maximum of $1,500. For income - qualified property owners, the cost share is increased. Please note the reimbursement funds can only be used for costs associated with private homes, K-12 Schools, and licensed day cares. It does not cover costs for replacing private lead service lines to commercial or business properties, except in instances where a building contains both a business and a residence. While preparing the update to the Municipal Code of the City of Oshkosh, City staff contacted plumbers/utility contractors to provide an estimate of what the cost to replace a private -side LSLR might be. Staff anticipated costs of approximately $2,500 - $3,000 per private -side LSLR, based on the feedback received from the plumbers/utility contractors. I:\ Engineering \Tracy Taylor\ Public Works Contracts\ Miscellaneous \ 2018 Lead Water Line Program Page 2 Of 4 Initial Notice2-6-18.docx The City has published a Request for Qualifications for plumbers/utility contractors interested in becoming prequalified to perform private -side LSLR. The list of prequalified plumbers/utility contractors is available on the Water Utility page of the City's website (www.ci.oshkosh.wi.us). To get to the Water Utility's page, on the home page, click on the pull-down menu labeled "Departments", then click on "Public Works", then click on "Water Utility", and then click on "Plumbers/Utility Contractors Prequalified for the Lead Service Lateral Replacement Program". Property owners should attempt to obtain at least two (2) quotations from the plumbers/utility contractors on that list and contract directly with the plumber/utility contractor to have the private - side lead water service lateral replacement completed. The City is encouraging the property owners to complete the private -side LSLR prior to the start of the construction. This will allow the final restoration to occur with the construction project and minimize the chances of damaging the new concrete and restored turf areas. Funding for private -side LSLR is being provided by the U.S. Environmental Protection Agency. Therefore, in some cases, the federal Davis -Bacon wage rate requirements will apply to the plumbing/utility contracting firm performing this work. The federal Davis -Bacon wage rate requirements will apply in the following circumstance: • The property is owned by a business entity (trust, LLC, etc.); will be using a plumbing/utility contracting firm that has employees (who are not owners of this firm); and an owner of that plumbing/utility contracting firm did not perform one�hundred percent (100%) of the work. Davis -Bacon wage rate requirements will not apply in the following circumstances: • The property is owned by an individual or individuals. • The property is owned by a business entity (trust, LLC, etc.) and an owner of the plumber or utility contractor completing the work completes one hundred percent (100%) of the work. • The total cost of the LSL replacement is less than $2,000. The City of Oshkosh will assist in determining property ownership and whether or not the Davis - Bacon wage rate requirements apply. The plumber/utility contractor must obtain a copy of the Davis -Bacon wage rate determination that is in effect when they sign the contract for the work that requires compliance with the Davis - Bacon wage rates. The cost-sharing reimbursements through the grant will be available to the residents that utilize the plumbers/utility contractors on the prequalified list of plumbers/utility contractors. In order to qualify for the cost sharing, the following requirements must be met: • Complete the Water Service Line Inspection. The inspection must be done by a licensed plumber or City Water Utility. The Water Utility will complete the survey for no charge. • Property owner should attempt to obtain at least two (2) estimates for the private -side LSLR from the City's list of prequalified plumbers/utility contractors. I:\ Engineering \Tracy Taylor\ Public Works Contracts \ Miscellaneous \ 2018 Lead Water Line Program Page 3 of 4 Initial Notice 2-6-18.docx • Work must be completed within one hundred eighty (180) days of the public -side portion of the lead water service lateral being replaced. • Property owner will sign an agreement with plumber/utility contractor to perform the private -side LSLR and will pay the plumber/utility contractor directly. Property owner will submit a copy of the invoice identified as paid by the plumber/utility contractor. • Upon completion of the work, a reimbursement form must be filled out and signed by both the property owner and plumber/utility contractor who completed the work. This form must be submitted to the City to qualify for the cost share. This reimbursement form can be found on the City's website, also on the Water Utility's page. • Upon final inspection and approval by the City of Oshkosh Plumbing Inspector, the City will send the property owner a reimbursement check for fifty percent (50%) of the total cost of the private -side LSLR, up to the maximum of $1,500. • Property owners who are at or below eighty percent (80%) of the median income based on family size, as established by the U. S. Department of Housing and Urban Development for a given year, would be eligible for additional assistance in paying for the private -side LSLR. This additional assistance may cover up to seventy five percent (75%) of the private -side LSLR. The property owner will still be responsible for the remaining twenty five percent (25%) of the cost of the private -side LSLR. • Property owners who are at or below fifty percent (50%) of the median income based on family size, as established by the U. S. Department of Housing and Urban Development for a given year, would be eligible for additional assistance for paying one hundred percent (100%) of the cost of the private -side LSLR. Once the private -side LSLR work is completed, the City will issue a two-party check to the property owner and the Licensed Plumber/Utility Contractor up to the total amount of the LSLR. Once the private -side LSLR has been completed, please submit the necessary paperwork listed above to City Hall in order to receive your cost-sharing reimbursement. You may submit the documentation in one (1) of the following ways: Scan all documentation and e-mail to Tracy Taylor at ttaylor@ci.oshkosh.wi.us. Drop off in person at Room 301 of City Hall, located at 215 Church Avenue. Deliver using the United States Postal Service to the following address: Tracy Taylor Department of Public Works PO Box 1130 Oshkosh, WI 54903-1130 Additional information about lead in drinking water can be found on the City's web page at hW2s://www.ci.oshkosh.wi.us/Public Works/water utihiy.asp. Property owners may wish to consider replacement of building's plumbing (pipe, valves, or fixtures) that contain lead-based materials. Please contact Pete Gulbronson at (920)236-5258 or the Department of Public Works at (920)236-5065 with any questions regarding lead in drinking water. I:\Engineering\Tracy Taylor\Public Works Contracts\ Miscellaneous\ 2018 Lead Water Line Program Page 4 of 4 Initial Notice 2-6-18.docx #2 FEBRUARY 27, 2018 18-88 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN ) PURPOSE: AMEND RESOLUTION #18-33 INITIAL RESOLUTION FOR SPECIAL ASSESSMENTS - CONTRACT NO. 18-04 PAVING, SIDEWALK, DRIVEWAY AND UTILITIES / FIRST LOCAL STREET CONCRETE PAVING PROGRAM / COURT STREET (FOX RIVER TO WASHINGTON AVENUE) / OTTER AVENUE (STATE STREET TO RAILROAD TRACKS) / WASHINGTON AVENUE (NORTH MAIN STREET TO BROAD STREET) / OSCEOLA STREET (PEARL AVENUE TO 115' SOUTHWEST OF HIGH AVENUE) / JEFFERSON STREET (WASHINGTON AVENUE TO 230' NORTH OF WASHINGTON AVENUE) / STATE STREET (OTTER AVENUE TO WASHINGTON AVENUE) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the Common Council previously adopted Initial Resolution No. 18-33 on January 23, 2018 for Special Assessments Contract 18-04 including Court Street from the Ceape Avenue to Washington Avenue, Otter Avenue from State Street to the railroad tracks, Washington Avenue from North Main Street to Broad Street, and Osceola Street from Pearl Avenue to 115' southwest of High Avenue; and WHEREAS, it is necessary to amend the Initial Resolution to include Court Street from the Fox River to Ceape Avenue, Jefferson Street from Washington Avenue to 230 feet north of Washington Avenue, and State Street from Otter Avenue to Washington Avenue. BE IT RESOLVED BY the Common Council of the City of Oshkosh as follows: 1. The Common Council hereby declares its intention to exercise its police power under Section 66.0703 and 66.0705 of the Wisconsin Statutes to levy special assessments upon property within the following described areas for benefits conferred upon such property by improving the following: FEBRUARY 27, 2018 18-88 RESOLUTION CONT'D Concrete Pavement Asphalt Pavement Sidewalk Driveway Aprons, Sanitary Sewer Laterals (New and Relay) Storm Sewer Laterals (New and Relay), and. Water Laterals (New and Relay): Court Street from the Fox River to Washington Avenue Otter Avenue from State Street to the Railroad Tracks Washington Avenue from North Main Street to Broad Street Osceola Street from Pearl Avenue to 115' southwest of High Avenue Jefferson Street from Washington Avenue to 230' north State Street from Otter Avenue to Washington Avenue 2. The total amount assessed against such district shall not exceed the total cost of the improvements and the amount assessed against any parcel shall not be greater than the benefits accrued thereto from said improvements. 3. The assessments against any parcel may be paid according to the provisions of Section 25-83 through 25-89 of the Oshkosh Municipal Code. 4. The governing body determines that the improvements constitute an exercise of the police power for the health, safety, and general welfare of the municipality and its inhabitants. 5. The Board of Public Works is directed to prepare a report consisting of: (a) Final plans and specifications for said improvements. (b) An estimate of the entire cost of the proposed work or improvements. (c) An estimate as to each parcel of property within the assessment district of: (1) The assessment of benefits to be levied for each improvement. (2) The damages to be awarded for property taken or damages by each improvement. (3) The net amount of benefits over damages or the net amount of damages over benefits for each improvement. (4) The total assessment against each parcel FEBRUARY 27, 2018 18-88 RESOLUTION CONT'D Upon completion of such report, the Board of Public Works is directed to file a copy thereof in the City Clerk's Office for public inspection. 6. Upon receiving the report of the Board of Public Works, the City Clerk is directed to give notice of a public hearing on such reports as specified in Section 66.0703(7)(a) of the Wisconsin Statutes. The hearing shall be held before the Common Council at the Council Chambers, Room 406 in the City Hall at a time set by the Clerk in accordance with the Wisconsin Statutes. The assessment against any parcel may be paid in cash, paid with the first property tax installment, or in ten (10) installments if the total amount of the assessment is greater than five hundred dollars ($500.00) or fifteen (15) installments if the total amount of the assessment is greater than one thousand dollars ($1000.00). 7. The installation of said street improvements shall be accomplished according to the provisions of Section 25-3 through 25-11 of the Oshkosh Municipal Code. #3 NOTICE OF PUBLIC HEARING Office of the City Clerk, City of Oshkosh, Winnebago County, Wisconsin: Please take notice that the City Council of the City of Oshkosh has declared its intention to exercise its power under Section 66.0703(7)(a) of the Wisconsin Statutes, to levy assessments upon property for benefits conferred upon such property by providing the following improvements fronting upon the following described streets: CONCRETE PAVEMENT, ASPHALT PAVEMENT, SIDEWALK, DRIVEWAY APRONS, SANITARY SEWER LATERALS (NEW & RELAY), STORM SEWER LATERALS (NEW & RELAY), WATER LATERALS (NEW & RELAY): Court Street from the Fox River to Washington Avenue Otter Avenue from State Street to the Railroad Tracks Washington Avenue from North Main Street to Broad Street Osceola Street from Pearl Avenue to 115' southwest of High Avenue Jefferson Street from Washington Avenue to 230' north State Street from Otter Avenue to Washington Avenue The report of the Public Works Director and City Manager showing proposed plans and specifications, estimated costs of improvements, proposed assessments and awards of damages is on file in the Office of the City Clerk and can be inspected there on any business day between the hours of 8:00 a.m. and 4:30 p.m. Notification that the City Manager (Board of Public Works) and City Council will hear all persons interested or their agents or attorneys concerning the matters in the preliminary resolutions authorizing awards of damages at 6:00 p.m. in the Council Chambers in the City Hall, Oshkosh, Wisconsin on MARCH 27, 2018. All objections will be considered at said hearing and thereafter the amount of assessment will be finally determined. PUBLISH: 3/17/2018 CITY OF OSHKOSH PAMELA R. UBRIG CITY CLERK SPECIAL ASSESSMENT PAYMENT PLAN OPTIONS AFTER CONTRACT NO. 18-04 IS CERTIFIED AS COMPLETE CONTRACT NO 18-04 WILL CONSIST OF CONCRETE PAVEMENT, ASPHALT PAVEMENT, SIDEWALK, DRIVEWAY APRONS, SANITARY SEWER LATERALS (NEW & RELAY), STORM SEWER LATERALS (NEW & RELAY), WATER LATERALS (NEW & RELAY): Court Street from the Fox River to Washington Avenue Otter Avenue from State Street to the Railroad Tracks Washington Avenue from North Main Street to Broad Street Osceola Street from Pearl Avenue to 115' southwest of High Avenue Jefferson Street from Washington Avenue to 230' north State Street from Otter Avenue to Washington Avenue Included in this mailing, is an estimated amount (quantities and costs) of the special assessment (sheet #5) against your property or properties. A statement of the same is on file in the office of the City Clerk. Once Contract No. 18-04 is certified as complete by the Public Works Department, the final amount (quantities and costs) of the special assessment against your property or properties will be mailed to you. At that time you will also receive the paperwork to select a payment choice for the special assessments. PAYMENT CHOICE OR PAYMENT IS NOT ACCEPTED AT THIS TIME. THE PAYMENT OPTIONS SHEET YOU WILL RECEIVE AFTER THE CONTRACT IS CERTIFIED AS COMPLETE WILL HAVE THE FOLLOWING OPTIONS: INVOICE - PAYMENT WITHIN 30 DAYS If you choose this option, the City of Oshkosh will then send you a special assessment invoice and you must make payment within thirty days of that notice. If the payment isnot made within thirty days after receiving the special assessment invoice, 6% interest accrues from the date of notification. If after making this selection, the property owner fails to make payment to the City Treasurer; the entire amount including interest will be placed on the next property tax bill. TOTAL ASSESSMENT ON NEXT TAX BILL IN FULL Property owners may elect to pay 100% of the assessment on the next designated real estate property tax bill, without interest. The total amount of the assessment will be included on read other side and payable in conjunction with the next designated property tax bill. TEN ANNUAL INSTALLMENT PAYMENTS ON PROPERTY TAX BILL (ASSESSMENT MUST BE IN EXCESS OF $500.00) The amount of the assessment will be placed on the property tax bill with interest at 6% on the unpaid balance per year over the ten- (10) year period. The annual assessment payment and interest will be included in each year's tax bill payment. The assessment balance may be paid in full at any time during the ten-year period, with interest pro -rated to the month of payment. (Applies to assessments in excess of $500.00.) FIFTEEN ANNUAL INSTALLMENT PAYMENTS ON PROPERTY TAX BILL (ASSESSMENT MUST BE IN EXCESS OF $1,000.00) The amount of the assessment will be placed on the property tax bill with interest at 6% on the unpaid balance per year over the fifteen- (15) year period. The annual assessment payment .and interest will be included in each year's tax bill payment. The assessment balance may be paid in full at any time during the fifteen -year period, with interest pro- rated to the month of payment. (Applies to assessments in excess of $1,000.00.) CITY OF OSHKOSH PAMELA R. UBRIG CITY CLERK read other side N 12 20 7 O 5 2 W� 4 1 ZONIN 40 210 NPG > —�— LOCK 3 igEACH MAPN ASTYAN r I LACH'9S M 2 I J o 2/N 1 2 3 4 N N 2 13�{-�12 11 10 97.0 c < < ' 2164 2 0 24).0' 12P.0' 16 .0' S, 36.0 32.0 11 19' 120.0 120.0' a 00 17 G 105, 115 �n " D—LE�—F H 7B K 6 r A ES� AODN� g P GC S < �L c "C 1 MILLEiA 1ST �' /�0 4 ADD N �l1 mTO BE ASSESSED NON-RESIDEN71AL RATE ` MW 6 7 6 PAGE 1 OF 4 filename: Washington00.dwg CITY OF OSHKOSH ODNCRETE PAVING, APRON, SIDEWALK AND WATER, ENGINEERING DIVISION SANITARY & STORM LATERAL ASSESSMENTS ZEMSION DATE: WASHINGTON AVENUE MAIN ST. TO BROAD ST. :ERTIFICATION DATE: JEFFERSON STREET 2 p,o�NN OF WASHINGTON AVE. CONTRACT NO. 18-04 DRAWN 11-28-2017 STATESTREET 50.0' S. OF WASHINGTON AVE TO WASHINGTON AVE. MT. VERNON STREET WA -AVE TO 50.0 N. OF WASHINGTON AVE. GRAPHIC 0 25 so loo SCALE: (IN FEET) 1!!!�!l COURT STREET 50.0' S. OF WASHINGTON AVE. TO (west slde) WASHINGTON AVE. FARCELI.D. ADDRESS OWNER STEED NAME FOR RATE FRONTAGE ASSESSABLE LINEAR CONCRETE PAVING CONCRETE MISTING APRON SIDEWALK AA SANITARY $1ORM SEWER ADDRESS ASSESSMENT CORNER LOT CALCULATION FEET ASSESSMENT APRON RELAY WATER NEW WATER NEW SANITARY SFF NOTE fEPVICE SERVICE LATERAL LATERAL RELAY LATERAL TOTAL 11 0 79-0WO 404 N MAIN 9 404 N MAIN ST LLC WASHINGTON NON-RES 1250' 12' = 623 $1221875 NONE $6.960]10 $210040 MAIN NON-RES NONE INSTALLED VIA 10-11 1.378]5 0401030000 16 WASHINGTON AVE 404 N MAIN ST LLC WASHINGTON NON-RES 97D $18.96330 OFF IEFFERSON $5.231.50 $2.2W.W $O.W JEFFERSON NON-RES 504 I 1= MIT $3,372M 2CONCRETE .95 3290,00 f=,638A5 04.0051-00= 106 WASHINGTON AVE CITY OF OSHKOSH WASHINGTON JEFFERLON DIRECT BILL TO CITY MT VERNON 040DI00000 204 WASHINGTON AVE MASONIC BLDG ASSN WASHINGTON RES-2 120D $1110800 NONE $1,150.00 $4.7504014'1 $2."M $2, W= MT VERNON RES-2 mffl 1 • 2511 m Ifl NONE 2{ AO 0400120000 110 WASHINGTON AVE WINNEBAGO COUNTY RE3-2 1604 114,1.40 NONE 1755D5 $246.540 $4,50KIM 6 22=.00 2.30I)D0 Iv,Imz5 02-0082-0000 318N AWN ST EXCLUSIVE COMPANY CORP WASHINGTON NON-RES 113.19'11= 5639 $11,063.35 NONE $3.664.15 $22M.= MAIN NON-RES NONE !INSTALLED VN 10.11 1 92730 02-00840000 17 WASHINGTON AVE CITY OF OSHKOSH WASHINGTON DIRECT BILL TO CITY STATE 02-0088=00 1D5WASHINGMNAVE DISCOVERYPROPERTIESLLC WASHINGTON RES-2 1204/7= 601D $6.30040 OFF STATE $1,150DD $9,250.00 (4-,61 S21WJ10 sm STALE RIES-2 500 $52m.w OUTSIDE LIMOS /1200900000 115 WASHINGTON AVE 115WASHINGTON LLC NON-RE$ 54.67 I&io&u NONE $1,43DID0 $2,211DIDD ,200100 11956.64 020091-0000 VACANT PARCEL WINNEBAGO COUNTY RES-2 921 A602.14 NONE $1,1620 $1.7410,00 .00 $41.4,300 24=.00 $21,614.74 0200934000 219 WASHINGTON AVE DALE SCHOOL APARTMENTS INC WASHINGTON SEE COURT SHEET FOR ASSESSMENT TOTALS COURT $10007338 32495.60 $24,7MA5 $18.500.00 33,33000 $4,400.00 $15.400.00 S913WA0 $178,173.13 $178.173.13 ' CMCULA11ON INCLUDING LONG SIDE CORNER LOT DEDUCTION AA INCLUDES 6SIDEWALK SQUARES FOR U11M REPLACEMENT, SEE LETTER FOR MORE INFORMATION 6 REDUCED FRONTAGE, OR CREDIT TOR 22/25 OF W15 MT VERNON ST CONCRETE PAVING ASSESSMENT TO 2018 ASSESSMENT BATES: BE APPLIED 4LCONCRETE PAVEMENT:NON RESIDENTIAU `$195M PER LINEAR FOOT (WASHINGTON, AWN TO STATE/.IEHERSONJ 4 CONCRETE PAVEMENT :RES-2I=$TOM PER LINEAR FOOT (SFATE) SB' CONCRETE PAVEMENT (NON RESIDENUAU - $13/.90 PER LINEAR FOOT NEFFERSON SN 3CCONCRE1E PAVEMEM(RES-21=$10540 PER LINEAR FOOT (WASHINGTON,STATE/JEFFERSONTOMTVERNON) 32 CONCRETE PAVEMENT (RES-2 = $93,10 PER LINEAR FOOT fWASHINGMN, MI VERNON TO BROAD) 3T CONCRETE PAVEMENT (NDN-RES) = $111 JO PER LINEAR FOOT (WASHINGTON, MT VEMON TO BROAD) SMEEi 20f 4 28' CONCRETE PAVEMENT(RESIDENTIAL)=$81 M PER LINEAR FOOT (MT VERNON) CITYERINO O$H CONCRETE APRON = $530 PER SQUARE FOOT LESS ANY CREDIT (ESTIMATE) ENGINEG DIVISION SANITARY a STORCONCRtit M SEWER LATERAL ASSESSMENTS SIDEWALK REHABILITATION PER SQUARE FOOT(ESTUWTE) CONTMCTB 18.01 SANITARY SEWER LATERAL RELAY= 52MB.00 EACH IESIIMATE) DRAWN 12/19/2017 WASHINGTON AVENUE- MAIN 5110 BROAD SI NEW STORM SEWER LATERAL FOR SUMP PUMP =$7MM EACH WARD 2ND L 4TH JEFFERSON ST- WASHINGTON AVE IG CIU.U- N OF WASHINGTON AVE C WATER SERV ERELAY =$4.750DO(ESTIMATED) MT VERNON ST- WASHING TON AVE 103U.U'N OF WASHINGION AVE C WATER SERVICE RELAY= $4.500DO (ESTIMATED) STATE ST- SUJI5 OF WASHING WN AVE 10 WASHINGTON AVE NEW 4-SANITARY L I'WA7ER-$7J=DO PER SET IESTIMATEI REVISED COURT ST-CLAPS AVE 10 WASHINGION AVE CERTIFIED (West Side) N cn o �- I p 0 Wz _ I ZONIN LOCK 39 I -PID ZONI�G N m s > 3 LEACH'S 4 3 S M P a s iw 4 1 2 13�} 12 11 10 I I F I T1 0 Lv w Q 426 I J- 0 > O 3 0 324 424 � 1280.84' 101.81'1 �.8 m WAS' INGTEM p 1 �a 303 30 313A s / 1`a 7 118.5 / d / ' 313 BL CK 6 ' � / �-{o . ACA�IT.PIrRCEL ` 0 PATEN IC S. i a0�2 2a� 2e %So 2z Q 0 OQQO O / BL ~ ^ 40 hM 31 ILBEf� Y'S �_ 0] � N ! T I O B CK 6 u a In 32T 0 'L LER 1 / b , 33 19 L ire_ filenome: mTO BE ASSESSED NON-RESIDENTIAL RATE PAGE 3 OF 4 IANHLD. ADDRESS DINNERCORMH STMHT NAME FOI TOT —1 FRO AGE CALCULATION AHESSABIIIINEAR FEES CONCRHl FAWNG APULIPAVMG GRAOMOa coNCKHE NEW 6• ASSUSMENI AfHS MT GRAVILMG EXDIMG"Rom AIKON Sipl FHUX AA SRl[WALK KE MO SANITARY IMA""'" LATERAL TREAT 3ElVK! STOIIMUWER ADINFMASSESSMEM U1WIG1. IOFAL ol,0011 00 300 WASHINGTON AVE C11Y Of OSNKOSN DIRECT WE TO CITY 040001-0102 Ste WASHINGTON AVE OSHKOSH COMMU HY YMCA RES] MOAN 26230,16 OFF NOHHWESTERN IT4,350,00 $,I,000.00 In 31100JG 2 230040 1MCA6 IILWILI01 424 WASHINGION AVE CIARIIYCARf MC WASHINGTON RES -2 HNA 595MA5 NONE 51.056.45 11,305,10 34750.00 149 12.200.00 32,100,110 BROAD RES -2 SOD' T • 254 190.00 ONSIDE LIMNS 1030 W1 H`000 415111OADST CLAR1TYCAMMC WASHINGTON RES -2 33691 $155176 5638.15 5506.60 NONE $IA1242 $040 BROAD REST A' 254 100A0 OUTSIDE LIMOS MAIN IB _ D HNJRROO 303WASHINGTONAVE EXCEL PROPERTIES II LLC WASHINGTON COURT SEE COURT ST SHEET FOR ASSESSMENT TOTALS 02-0103LOD0 309 WASHINGTON AVE EXCEL PROPERTIES II LLC RES -2 4911 1076,PT SHARED CONC i 1310 12100.00 ILI.4011110 SICA30M 1 CONC.SHAMD 02,1102-0000 313 WASHINGTON AVE EXCEL PROPERTIES II ILC HOWLER 68.5 ] IAS 28395ITIMM 2200,10 .40040 141 .9D 02-0101-0000 VACANT PARCEL 005 WAMINGION AVE LUC NON -RES 564 36,23320 NONE S921AS 414,349AD $13.521]5 02-01020000 405 WASHINGTON AVE 405WASHINGIONAVE ILC NON -RES 111.) 14 99 12AWM 150.00 f4l $4,1110.00 121 Nzo 11111551.39 02—M 0000 VACANT PARCEL 405 WASHINGTON AVE LLC WASHINGTON NON -RES IIBS.122A'J2l-. 132. $14J41A0 SBM40 $OAO BROAD NON -RES vH12. 1 1 5950 316.65390 ____ SB&395.31 5638.25 5506.60 $3,12295 $12.00540 $1.612.02 $13.500.00 $".—. $9500,10 $1,49.500.68 5145.500.68 ' CALCULATION INCLUDING LONG SIDE CORNER LOT DEDUCTION AA INCLUDES 6 SIDEWALK SQUARES FOR UFIUIY REPLACEMENT, SEE LEDER FOR MORE INFORMATION 1 ASSESSMENT IS BASED ON 164' OF CONCRETE ASSESSMENT A. 12.29OF ASPHALT/ GRADING 8 GRAVELING MIR ASSESSMENT RAIU: 37CONCRETE PAVEMENT (NON RESIDENTIMI = 311170 PER LINEAR ME DVA9HINGFON, MT VERNON IO BROAD) 37 CONCRETE PAVEMENT IRES-1. INS -2) = $93,10 PER LINEAR FCNOT fWALFI IIGION, Ml VERNON TO BROAD) 32' ASPHALT PAVEMENT (RES -21= 338.10 PER UNIA2 FOOT (WASHINGTON. BROAD TO RR TRACKS) 32' GRADING A GRAVELING 111 521= $29.33 PER LINEAR FOOT IWASHINGION. BROAD TO RR TRACKS) SHEET 4 OF e 30' CONCRETE PAVEMENT (RESIDENTIAL)=$82A0 PER LINEAR FOOT (BROAD. N OF WASHINGION) 22' CONCRETE PAVEMENT (NON-RESI=322,00 PER LINEAR FOOT(BROAD, S Of WASHINGTON) CITYO O OASPHALT ORAVINti IS UNAVtUNU. APRON, SIDEWALK CONCRETE APRON = 3530 PER SQUARE FOOT LESS ANT CREDIT ESTIMATE) ENGINIMUNG DIVISION AND WATER, SANITARY L STORM SEWER LATERAL ASSESSMENTS NEW DITEWALK - $530 PER SQUARE FOOT (ESTIMATE) CONTRACT 1 16 IH 51DEWMK RENAHLITAIION=$5.800 PER SQUARE FOOT (ESTIMATE) DRAWN 12MI/1o11 WASHINGTON AVENUE -MAIN SI IU URUAU SI SANITARYSEWERLAIERALRE=$2.200A0EACHIESIIMAIE) NEW STORM SEWER LATERM FOR SUMP PUMP = $250.00 FACE WARD 2ND &41H JEFFERSON ST- WASHINGIUN AVE IU SU.L2 N UI WASHRHGION AVE MT VERNON 3T- WASHINGIUN AVE IU MAY N UI W/ 1HINUIUN AVE 4-W ATER SERVICE RELAY • $475040 (ESTIMATED) STATE 31- 5UA2 S LJP WASHING IUN AVE IU WASHINUI ON AVE B-WATFR SERVICE RELAY=SI,000AO IESIIMAIEITI REVISED COURT ST -CLAVE AVE IU WA5IRNGI0TN AVE CULTURD IWeSI side) H 24 v 2 2 �-21 20 194-18 17� 16 z3 �� F BL CK 23 F N N A p S I DD I " C C 6+7 8 �i-�94�10�1-�11 �1-�12�i3�1a 15 I I I 112 810.0' 00.0' 110.0' '4').')' .0' 50.01 30.0 80.0' VA ANT PA CEL 3 211 215 -0037-000 2 / J 15 I 6 7 S8 9 I 10 11 I 12 �3 261 II I �r 4 I BL6 2a I e DD r [01877 16 11514—} 13 mTO BE ASSESSED NON-RESIDENTIAL RATE 312.67'1 8.32 60.0'X-01 4151 COUZ HOUSE 6 I 7 I 6 °dg KAEl11 S �JARE �� LPA � J2E LAg 20 aC) o � �— �o L 0 19 S j L MVI 1Si ADDN is la 13 filename: OtterOl.dwg PAGE 1 OF 3 CITY OF OSHKOSH CONCRETE PAVING, ASPHALT PAVING, APRON, SIDEWALK AND WATER. ENGINEERING DIVISION SANITARY & STORM LATERAL ASSESSMENTS OTTER AVENUE STATE ST. TO BROAD ST. ZEVISION DATE: 7ERTIFICAVON DATE: STATE STREET 50.0' S. OF OTTER AVE. TO 50.0' N. OF WAUG00 AVE. CONTRACT N0, DRAWN 18-04 11-07-2017 I COURT STREET CEAPE AVE. TO WASHINGTON AVE. GRAPHIC o u so 10o SCALE:(IN FEET) BROAD STREET 50.V S. OF OTTER AVE. TO 50.0' N. OF OTTER AVE. PARCEL LD. ADDRESS OWNER STREUNAMEFOR CORNER LOT KATE FRONTAGE CALCULATION ASSSSABLEUNLAR CONCRETEPAVING FEET ASSESSMENT EKISIING APRON CONCRETE SIDEWALK AA WATER SERVICE NEWSANITARY APRON SEE NO RELAY LATERAL SANITARY LATERAL RELAY "SEWERADDRFSSASSEENN LATERAL TOTAL 02-0007400D0 205 STATE ST Cm OF OSHKOSH OTTER DIRECT BILL TO CITY STATE 02-00244000 2D6 STATE ST WINNEBAGO COUNTY OTTER KONING 804'/2'= 40.0 34MDIW NONE $1.45040 $4,750.00141 $2.200-00 $2200-00 STATE 1-20NNG 25.0 $2,625.00 NONE SMIDD 517.715DO 02-0025-0000 1120TTERAVE WINNEBAGO COUNTY OTTER SEE COURT ST SHEET FOR ASSESSMENT TOTALS COURT 06-0057-0000 100 N MAIN Sr DAYMARK 100 N MAIN LLC/OSIIXOSH 621 OTTER NON -RFS 254 $3,552.50 OUTSIDE LIMITS $870-00 $OHO STATE NON -RFS 50.0'/2-= 254 $3,377.50 ONSIDE LIMITS $145.00 $7.940.00 050035-0000 126 STATE ST STATE STREET SURES LLC OTTER NON-RES 10010 513,4901D0 NONE $1,013.00 $1,305.00 $2AWDD STATE NON-RES 15.0' 2'= 12.5 $1,696.25 OUTSIDE LIMITS 290.00 $20,184.25 - O&OD37-MM VACANT PARCEL Cm OF OSHKOSH DIRECT BILL TO CITY 060038-0000 200 OTTER AVE SONR6E MISSION INC RES-2 BOA $8,400.00 NONE $747.35 $2,9001DD $2.200.00 $ZAOD.00 $16.647.35 08-0039-000$ 211 OTTER AVE SONRISE MISSION INC RES-) 504 670.01) NONE $757.25 $1.160.00 S2.20DX0 750-00 $9,537.25 08-0040-0000 215 OTTER AVE DUSTIN W CLARK REST 304 $2402.00 NONE $Idols.00 34.400.00 4750JDD $8,947.00 060042-M 101 COURT ST CITY OF OSHKOSH OTTER DIRECT BILL TO CITY COURT $44,79825 $2517.60 $9,425.00 $4.75040 $4,400.00 $6.600.00 $8.500.00 $8,99085 ' CALCULATION INCLUDING LONG SIDE CORNER LOT DEDUCTION $8,99085 AA INCLUDES 6 SIDEWALK SQUARES FOR UTILITY REPLACEMENT, SEE LETTER FOR MORE INFORMATION 4 REDUCED FRONTAGE, OR CREDIT FOR 10/25 OF 2003 STATE ST, SOUTH OF OTTER AVE CONCRETE PAVING ASSESSMENT TO BE APPLIED 2018 ASSESSMENT RAIE4 43' CONCRETE PAVEMENT )RES-2) = $105.0D PER LINEAR FOOT ISTATE-N OF OTTER) 40 CONCRETE PAVEMENT RNOWRFS) -$142.10 PER LINEAR FOOT IOTIER- W OF STATE) 3B' CONCRETE PAVEMENT (RFS-1) =$93A0 PER LINEAR FOOT JOTTER COURT, 8 STATE- 5 OF OTTER) SHEET 2 OF 3 36 CONCRETE PAVEMENT (RES-2 F20NING) _ $105110 PER LINEAR FOOT JOTTER- E OF STATE d COURT)CITTOF X 38' CONCRETE PAVEMENT (NON RESIDENTIAL) =$134.90 PER LINEAR FOOT (OTTER 8 COURT) ENGINEERING DIVISION SANITARY 8 STORM SEWER LATERAL ASSESSMENTS CONCRETE APRON - $5.50 PER SQUARE FOOT LESS ANY CREDIT (ESTIMATE) CONTRACT 8 18.04 SIDEWALK REHABILITATION =$580 PER SQUARE FOOT (ESTIMATE) DRAWN 12/19/2017 SANITARY SEWER LATERAL RELAY =$2.200.00 EACH JETS@MTE) WARD 2ND K BTN OTTER AVENUE-SIAI ESI IU BROAD SI NEW STORM SEWER LATERAL FOR SUMP PUMP =$750-00 EACH STATE ST- SU.0 S OF UI 1 LN AV L IU SU.0 N OF UI I tH AVt 4-WATER SERVICE RELAY =$4,750.00 (ESTIMATED) COURT ST-ChAI't AVt IU WASHINLAON AW: NEW,"SANITARY=$4.400.00 EACH (ESTIMATE) RMED IWXST sidel CERTIHED PARCELI.D. ADDRESS OWNER STREET NAME FOR RATE ASSESSABLE LINEAR CONCRETE PAVING FRONTAGE CALCULATION EXISTING APRON CONCRETE NEWWATER NEWSANITARY SANITARY AA STORM SEWER ADDRESS ASSESSMENT CORNER LOT FEET ASSESSMENT APRON SIDEWALK SERVICE LATERAL LATERAL RELAY SEE NOTE) LATERAL TOTAL oz4)05Da000 304 OTTER AVE OSHKOSH OTTER AVE LLC OTTER SEE COURT ST SHEET FOR ASSESSMENT TOTALS COURT 02-00190000 314 OTTER AVE LAWRENCEJEANNE HILDEBRAND LIVING TRUST RES -1 40.0 $3,7UM SHARED CONC $Iv.,mS 1,160.00 V.2DDM 47som 9111:13 02.0048-0000 3HIOMERAVE BRIW A/MARGART BREUER RES -1 80.0 7472.00 CONC $249.05 sa7om .00 5010 $11,5414)5 02-00{7-0000 402 OTTER AVE JESM MEYER RES -1 40.0 $3,736.00 SHARED CONC 196110 wom 1M 50100 V.752UBG 02410160000 406 OTTER AVE JOHN 8SULWAN RES -1 50.0 14,670M SHARED CONC $181.95 $Iw.w AO VW,0D AS 02-00/50000 410017ERAVE OTTER WI/LINCOW ULC RES -1 704) 6 = CONC pzgm $2.030M $4,40IUDD SO.W 1 997m 024)0{1-0000 VACANT PARCEL MICHAEL L MILLER RES -1 400 P23sm NONE $1.1.m S3 AD $4.40DM WAO 13,316.00 0200410004 422OT1ERAW RICHARDH DEW OTTER RES -1 404) $3786.00 OFF BROAD $870.00 S2200l10 $1511.00 BROAD RES -1 SO.0'2'= 25.0 OUTSIDE LIMITS 09-0 14Y1I10 133 COURT ST OSHKOSH HOUSING AUTHORITY OTTER SEE COURT ST SHEET FOR ASSESSMENT TOTALS COURT DITOD230000 400 CEAPE AVE OSHKOSH HOUSING AUTHORITY RE3-2 MA $5,073M ASP 6117 1.401.28 p=m t4,400M 1R0 $11.334,15 08-0071-010D 4150RERAVE THEODORE J FRANK/HEIDI L WHEATON RES -1 W.0 560/.00 ASP/CONC $w,u 3970M $Z200,00 v5plop SITAMA7 DS-OD7140000 421 OTTER AVE SARAH A MUELLENBACH OTTER RES -1 604) $5,604.00 OFF BROAD $1AI$AO OFF BROAD 5750.00 BROAD RES -1 SDA' / 2' = MIT OUTSIDE LIMITS 3mm OUTSIDE LIMITS $7,514.00 $19.905.60 $245214 $11.47878 $6.600D0 SB,BODAO $17,600.U0 $8.950.00 $10.5?86.62 ' CALCULATION INCLUDING LONG SIDE CORNER LOT DEDUCTION $105786.62 - AA INCLUDES 6 SIDEWAM SQUARES FOR UTILNY REPLACEMENT, SEE LETTER FOR MORE INFORMATION 2018 ASSESSMENT RATM SHEET 3 OF 3 CHOS ITY 3B' CONCRETE PAVEMENT (RES -1) =593.40 PER LINEAR FOOT JOTTER B COVRf) ENGINEERING DIVISION SANITARY S, STORM SEWER LATERAL ASSESSMENTS 3B' CONCRETE PAVEMENT (RES -21- $101.00 PER LINEAR FOOT (OTTER 8 CCK Rt) CONTRACT B 1R-04 CONCRETE APRON= $550 PER SQUARE FOOT LESS ANY CREDIT(ESTO.MTE) DRAWN 12/19/2017 OTTER AVENUE-SIAIE SI IO SRUAD S( SIDEWALK REHABILITATION = SSW PER SQUARE FOOT(ESTIMATE) WARD 2NOL 8TH COURT 37-CLAPE AVE 10 WASHINGION AVE SANITARY SEWER LATERAL RELAY= $2200.00 EACH (ESTIMATE) NEW STORM SEWER LATERAL MR SUMP PUMP a $150.00 EACH 6 OADSTSTST- 80.0' 5 0h 01 TER AVE 10 6UA' N Oh 01IER AVE NEW IrSANITARY8. 1' WATER= S770DAD PER SO IESTWIAIE) REVISED (Wed "I CERTIFIED m :lAU-jZM 20 U R5 i ST N XGL - 100 0 UMU—PD ZONING --A D = XI O 1T1 c In m G P PEND ICK'7- ° ® TO BE ASSESSED NON-RESIDENTIAL RATE — BLOC 23 0 —L� M * ILL ABIMm 10!- U O IN Q - Q Q N u z89.r O1 I� 123.7r T COURT ST. W64.¢' ; i6' 123.7r $ e, r /n' N o T N A ♦) z r o I x 323' /8 .0' 59.2 11 6 3s22 ". w � N w filename: CourtOl.dwg PAGE 1 OF 2 CITY OF OSHKOSH CONCRETE PAVIND ASPHALT PAVING APRON SbEYRALK AND WATER. ENGINEERING DIVISION SANITARY t STdDI LATERAL ASSESgwIQtTS REVISION DATE COURT STREET FOX ROVER TO WASHINGTON AVE XRTIFlCATION DATE CEAPE AVENUE 50.0' W. OF COURT ST. TO CONTRACT NO. I DRAWN SOA' E OF COURT ST. 18-04 11-07-2Dl OTTER AVENUE STATE ST. TO BROAD ST. GRAPHIC 0 25 w 100 WAUGOO AVENUE 50.0' W. OF COURT ST. TO SCALE: (IN FEET) I!!�!! 50. E OF COURT ST. WASHINGTON AVENUE IAAIN ST. TG BROAD ST. IMCEI LD. AWmf OWNER STREET NAME IWASSYSMLEIINFAA RATE lROMAGFCAICUUIiDN -C-1-All-I PAVING f%RIV40 AIAON CONCRER AA """'!'"C'LANIARY DUIIHS.ITT MFM NOW S-1 -.ITT- C... COINER LOT HER ASSESSMENT ASSENMENT APRON fIOFWMK MEW SIDEWALK flt Nott RELIT NW-11 NEW,fANRARY LATERAL )NAY SERVICE IAIHAI LAIFRAI IOTA) 0900100000 217 CRAM AVE JONNFBERMINGNAM JR EUI COURT NONRES I15O.D/11+1100• 165. 55,41603 CONC 110000 $7,1%110 $2.100-00 $5,2W.00 CUPS NOWRES 50.0 OSDO OFFCWRT 158SIM 2-7.00 c 24000 MICWwSr clrraosxKosN DIRECT BILLTO CITY 03.00250000 112ORER AVE WWNEBAGOCWHIY COURT RES-2 ISOV (T•1391- 2111 $W91A0 2COHCRETE S2SE530 12753.00 32103.00 ODER RFS-2 1100(2+2500• =LD 11612300 $CONCRETE 36JS.M $SA75A0 39,29)0014'66! i6.p0]AO $2400.07 WAUGOO RE5-2 SOA T• ZSID SZ625,00 NONE V.. f903411q OMIII-03]0 VACANT PARCEE LULESCNOWAPARTMFNP$W COURT NON.PE, 1237T/T- 4106 $8341PT 2COHCREIE 12768.60 32755/10 S3-=I0 $4At400 $290003 WAVGOO NOILRES SOA W45,00 NONE I 31 02.0W3OXD 219WASHINGTONAVE DALESCHOOLAPARIMENIS RK COURT NONRES 1500'/T+823'- 1573 $21219.77 CONCRETE 3135970 13,190-00 j17.S0.W ML 12103.m $7.DDAD WASNINGION NON RPS 71585 9996.92 09-002).0000 IIA CEAPE AVE C-OTxKON( DIRECT BILL TO CITY 080034O1N IOOCWRTNUMII O31Q(fbNNOUSINGANNOROY COURT pEi2 030.0/?+)SDA/?1+36AJ• IBdA] 1939182 ASPHAO 11.10702 5227360 3210500 Ipl 4M W COMMON ELEMENTS CAME RES2 300 $257230 OUINOE LIMITS $14210 wo) OITETE PFS J127 1 87 CONCRETE 260.02 1 S 5495F9 OB-0NIOMO 10000UK.UN02 OSNKOSN HOUSING AUINORITY COURT M-2 IISOA/T+TWA/TI+J6R- IB6A3 59.963.33 ASPHAU SI3W.1B $2,96610 5229500161 1I9SWCOMA50NELEMEM1 CEAPE M,2 SOA 123)7.50 ONSIDE UNITS $147.90 SDN CITE, RES] 3121 16763.8 CONCRETE 110915 536.933.81 02.0DSOWW ]MOTTERAVE OSHKOSH 0."AVf LLC COURT NON-RES 1416'/T- 720 SV539 CONCRETE $1.116.95 1139514 OTTER !WN-RES IDD $16188.0 CONCRETE $107.13 70()0 SOAP S..9BOS, 02LDVOIOD VACANT PARCEL LABRADORPRCPERIIESUC M3 $..7010 CONCRETE 1120.25 116D40 321 130 OZ-0OJ1O00D TMCOI.. UBRADOR MOPERDES LIC COURT RES-2 83.1'/2- 4005 54235.25 OTT WAUGOO 51,3DS.OJ 122m110 $2700.00 WAUGOO RE32 25.0 25.W OUISIDELUMS SISA35Z 020052-000 3WWAVGOOAVE J03E DFANDAIIORRAINEMGARAN MARIINO COURT RFS) 1972(2- 6106 $5717.72 CONCRETE 39d0A0 31.305.4 $2100D0 $73(UX) WAUGOO REST 250 .0 SSBDAO S.-.12 OS.01010030 916 CdIR19 CRPSCEN-PROPE"Is NONIES B0D I ASPHALT 18612 1 AO 19 .I2 42.01050000 322COURTN EXCtl, PROPERTIES R LOC NOME; 59]0 996.81 NONE S 1 668) O ITN4D09 =WASHINGTONAVE IXCEL PROPERDESO LLC COURT RPS) 111.11'/T- 5536 $5.18910 CONCRETE $59980 SBMOD 32100.0 $7S0DD WASHINGTON REGI 731 .94 CONCRETE w4m 1 1 109 3%5.929.65 $SA76.00 $1681501 13613500 $7,106.00 E2315DD4 360(4.00 $BBDO $26.60000 $tl,mm $43132ZW ' CALCUTAt1ON INCLUDING LOHGADE CORNER 001 DEDUCTION 10132230 AA INCLUDES&SIDEWMK 9WAR.-UDLRY WtACWUU. SEE LEDER FOR MORE INFORIMIHIN 101! AMFSWEM RAIEi W CONCRETE PAVEMENT INON REHDENTMU-$I36.M PER UNEAR FOOT (OTNR S WURFI M CONCRETE PAVEMENT ME31l -$93.M PER LINEAR FOOT IOITER d CW M 34 CONCRETE PAVEMENT MM21-SI65DO PER UNPAR FOOT (OTTER A COURU W CONCRETE PAVEMENT (HON-RER-114210 PER LINEAR FOM ICEAPEI 40 COHCRETE PAVEMENT (PMZ -3105,00 PER LINEAR FOOT ICEAPU UCONCRETEPAV W(M-21•SIOS.4PERUHEARFOOI1wA0OOO1 3TC ME PAVEMENT (NOIYREA-$111.70 PER UNPAX FOOT(WASHINGTON. W VERNON TO BROAD) 3T CONCRETE PAVEMENT (REST, M,21 • SP34O PER LINEAR FOOT (WASHINGTON, W VERNON TO BROAD) SNEfl 2OF I 20 ASPHALT PAVEMENT, W/O CURB (NON-`ESI.519.60 PER LINEAR TOOL ICW4. SOMN OP CFAPq CRY OF -lUL CONCRETE CONCRETEAPRON-$.530PERSOUARElOOTLF-CREDO(ENAUTEI SIDEWALK RENANUTATN3N-$50p0 PERSQUARETIESMUTO FxcREFFRWG DIVISION Co-. 1806 AND WATER, SANITARY R STORM SEWER LATERAL ASSESSMENTS NEW SIDEWALK- 35.50 PER SENURE MT(EAVMIE7 1-11.17�CCTUIIIST--X IFIVI3EIU W/JMWOION AVE SANRAMSDVER UIERALREUY-329004 EADN (FSIWUIE7 WARD IND LRTN CRAPE AVE- SUA W UP LOUR] 51 TO 5UAT E U7 L;UURI$1 NEW NOW SFWEQUIERAI fOR SUMP PUMP• 3)SOt4 EACH 4- WATER SERVICE MAY- S4,7W.0 (EST17MiED) OTTER AVENUE- SIAIE 51 IU RITUAL) 51 WAUGOO AVE- $UAW OE E;LXWI SL IU 60Z UE C:UUNI SI &'WATER SERVICEREIAY•NSDD.ro IESDMATEDI MW Pj 1N A1-WATER•$1.7004 PER SET IESTOAATEI REVBED CENURD WA3HINMON AVE, MAIN SI IU BROAD SI z S N W O Y 1 , ` 300 N MAI i 1 STAM N W r I 206 ' 208 216 24 g NI G ^� ' I N O f O pi z c� filename: State02.dwg PAGE 1 OF 2 CITY OF OSHKOSH CONCRETE PAVN:G, APRON, SIDEWALK AND WATER. ENGINEERING DIVISION SANITARY R 310101 LATERAL ASSESStAM REVISION DATE: CERMCATION DATE CONTRACT NO. DRAWN STATE STREET 50 G N OOFF OTTER A•VE rGRAIPHIC 02-23-2018 0 ze w 100 FEET) APPROX. SIDEWALK SANITARY SEWER SIDEWALK AA (SEE PARCEL I.D. DESCRIPTION OWNER WIDTHS LATERAL NOTE) ADDRESS TOTAL 02-0007-0000 205 STATE ST CITY OF OSHKOSH SEE OTTER AVE SHEET FOR ASSESSMENT TOTALS 02-0008-0000 219 STATE ST S BAYER HOLDINGS LLC . ........ 02-0016-O000 25 .60 $2,878.60 02-0076-0000 300 N MAIN ST BBLD LLC . ......... -------- --- - -OFF MAIN---­ 0.00 0.00 02-0024-0000 206STATE ST WINNEBAGO COUNTY SEE OTTER AVE SHEET FOR ASSESSMENT TOTALS 02-0023-0000 208 STATE ST OSHKOSH MARTIAL EDUCATION CENTER 10.8-.-.- $4,400.00 J1_­­_­j.1.,879.20 .... J6.,279.20 02-0021-0000 216STATE ST OSHKOSH BUSINESS CENTER III LLC 10.8 $2,200.00 $939.60 3,139.60 02-0020-0000 224 STATE ST OSHKOSH BUSINESS CENTER III LLC 10.8 ____J.3J39.60 02-0064-0000 300 STATE ST HARRY E/PRISCILLA KIECKHAFER REV TRUST 9.1 $2,200.00 $791.70 $2,991.70 TOTALS $15,400.00 $5,907.30 $21,307.30 $21,307.30 AA INCLUDES 3 SIDEWALK SQUARES FOR UTILITY REPLACEMENT, SEE LETTER FOR MORE INFORMATION PAGE 2 OF 2 2018 ASSESSMENT RATES: CITY OF OSHKOSH SANITARY SEWER LATERAL & SIDEWALK SANITARY SEWER LATERAL RELAY = $2,200.00 EACH (ESTIMATE) ENGINEERING DIVISION SPECIAL ASSESSMENT SIDEWALK REHABILITATION = $5.80 PER SQUARE FOOT (ESTIMATE) CONTRACT NO. DRAWN 18-04 F 2/20/2018_ STATE STATE WARD REVISED OTTER AVE TO 50'N 2ND OF WAUGOO AVE 7 ti VD,6ZO-N11 V 14 + 5 _ 7 HIGH AVG. t5 6 13 6 )HA PARCELi01-04D1-0000�71a LELEAC S MAF I JACKSOS IT N MARTIN'S J CKSON & MART NS mBBLO 43J I rBBN O�THI- Q -ArM T TFtl! Q 3BLO K V D�J = W�STERADDN6O3i12 11 -' 10 B'DOCC U S 2 S 9 aI S37.50'I105. OSCEOLA ST. I 1276.0' 1 I 2 0 1 1 1 I S I 20 19 l — — I 20 I 19 —�— — 20 i T 2 d� rl . I I I WESTERN ADD I W Sr�jRN ADD —� — —I Ll I K -S -� — -� 1 BLGEK� — 3 I J I 18 3 I 18 3 18 3 WESTN AI d— WESTRN AD — �n' I — 4 —V —J BLOCDDK 0 I I BLq_CK R I Ori I' V� 17 a f6enome: Os0eo1001. dwg CITY OF OSHKOSH ENGINEERING DIVISION 2EVISION DATE .ERTIFICATION DATE: CONTRACT N0. I DRAWN 18-04 01-10-2018 GRAPHIC 0 25 50 100 SCALE. -(IN FEET) PAGE 1 OF 2 CONCRETE PAVN06 APRON, SWEWALK AND WATER, SANITARY 3 STORM LATERAL ASSESSMENTS OSCEOLA STREET 20.1' N. OF PEARL AVE TO 10&4 S. OF HIGH AVE PARCEL I.D. ADDRESS OWNER STREET NAME FOR RATE CORNER LOT FRONTAGE CALCULATION ASSESSABLE LINEAR CONCRETE PAVING FEET ASSESSMENT CONCRETE ADDRESS ASSESSMENT EXISTING APRON APRON SIDEWALK AA TOTAL SEE NOTE 01-0471-ODOD 785 HIGH AVE BOARD OF REGENTS UNIV OF WIS SYS OSCEOLA ONLY I -PD ZONING 431.3' 110,283.42 # CONC $100.00 $4.815.74 $45,199.16 01-0392-M 140 OSCEOLA ST BOARD OF REGENTS UNIV OF WIS SYS OSCEOLA ONLY 1 -PD ZONING 276.0' $25.778.40 # CONC. SHARED CONC 11,5170.55 $7,508.10 p5,257D5 01-0400-0000 206 OSCEOLA ST 80ARD OF REGENTS UNIV OF WIS SYS OSCEOLA ONLY I -PD ZONING 164.6 ` $15373.64 # SHARED CONC 1783.10 $5,586.56 $21,743.30 $81,435.46 $2.853.65 $17,910.40 $102,199.51 " INCLUDING 25 EXTRA PAVING, DUE TO POSSIBLE REMOVAL OF EXISTING CONCRETE. CREDIT WILL BE APPLIED AS NECESSARY $102,19951 AA INCLUDES 6 SIDEWALK SQUARES FOR UTILITY REPLACEMENT, SEE LETTER FOR MORE INFORMATION # REDUCED FRONTAGE OR CREDIT FOR 18/25 OF 2011 OSCEOLA ST CONCRETE PAVING ASSESSMENT TO BE APPLIED SHEET 2 OF 2 2018 ASSESSMENT RATES' CITY OF OSHKOSH - CONCRETE PAVING, APRON, SIDEWALK AND WATER, ENGINEERING DIVISION SANITARY 8 STORM SEWER LATERAL ASSESSMENTS 32' CONCRETE PAVEMENT (I -PD ZONINGI = $93.40 PER LINEAR FOOT CONTRACT # 18-04 CONCRETE APRON =$5.50 PER SQUARE FOOT LESS ANY CREDIT (ESTIMATEI DRAWN 12/19/2017WARD SIDEWALK REHABILITATION = $5.80 PER SQUARE FOOT (ESTIMATE( iTH SANITARY SEWER LATERAL RELAY = $2,200.00 EACH (ESTIMATE) OSCEOLA STREET- 20.1'N OF PEARL AVE TO 130.4' S OF HIGH AVE NEW STORM SEWER LATERAL FOR SUMP PUMP = $750.00 EACH REVISED CERTIFIED