Loading...
HomeMy WebLinkAbout0103537-PlumbingOSHKOSH ON THE WATER *Job Address 1204 FAIRFAX ST Contractor HANSON QUALITY PLUMBING Bathtub 3 Shower Whirlpool 0 Floor Drain Lavatory 4 Lndry Tray Toilet 4 Lndry Stndp Res. Sink 1 Disposal Bar Sink 0 Dishwasher Water Heater 1 Sump Pump __ Site Drain 0 Classrm Sink Roof Drain 0 Breakrm Sink CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner RUSCH HOMES Category 410- Residential-Interior 0 Ejector/Grind 0 DipWell 0 F PrepSink __ I Water Soffner 0 Drink Ftn 0 ServSink 0 LocaIWaste 0 Wait. St. 0 Shamp Sink 1 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 1 Bidet 0 Exam Sink 0 Catch Basin 1 Beer Tap 0 SculrySink 0 Wash Ftn I Dent, Oper. 0 Hand Sink 0 Urinal 0 Lab Sink 0 PlasterSink 0 Standp Rec 0 Sterilizer 0 Surgeons Sink 0 Ice Maker No 103537 Create Date 07/31/2003 P]an 0 Gar Drain 0 0 Soda Disp 0 0 Coffee Maker 0 0 Int Grease Trap 0 0 Ext Grease Trap 0 0 RPZ Valve 0 0 EyeWash Statn 0 0 1 ofUse/Nature Work rN SFPJ Sanitary Sewer Storm Sewer Water Service Size Material Type Valuation $5,000.00 Plan Approval $0.00 Permit Fees issued By # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $114.00 [] Permit Voided J Date 08/14/2003 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contac~ the easement holder(s).~.~and to secure any necessary~) ~p.~ovals before starting such activity. Date~--/~i~ ~ ~// .~ ~.~ ~-- ' ' Agent/O~ner Address 550 N BLUEMOUND RD APPLETON WI 54914 - 0000 Telephone Number 730-0205 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.