HomeMy WebLinkAbout0103537-PlumbingOSHKOSH
ON THE WATER
*Job Address 1204 FAIRFAX ST
Contractor HANSON QUALITY PLUMBING
Bathtub 3 Shower
Whirlpool 0 Floor Drain
Lavatory 4 Lndry Tray
Toilet 4 Lndry Stndp
Res. Sink 1 Disposal
Bar Sink 0 Dishwasher
Water Heater 1 Sump Pump __
Site Drain 0 Classrm Sink
Roof Drain 0 Breakrm Sink
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner RUSCH HOMES
Category 410- Residential-Interior
0 Ejector/Grind 0 DipWell 0 F PrepSink __
I Water Soffner 0 Drink Ftn 0 ServSink
0 LocaIWaste 0 Wait. St. 0 Shamp Sink
1 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink
1 Bidet 0 Exam Sink 0 Catch Basin
1 Beer Tap 0 SculrySink 0 Wash Ftn
I Dent, Oper. 0 Hand Sink 0 Urinal
0 Lab Sink 0 PlasterSink 0 Standp Rec
0 Sterilizer 0 Surgeons Sink 0 Ice Maker
No 103537
Create Date 07/31/2003
P]an
0 Gar Drain 0
0 Soda Disp 0
0 Coffee Maker 0
0 Int Grease Trap 0
0 Ext Grease Trap 0
0 RPZ Valve 0
0 EyeWash Statn 0
0
1
ofUse/Nature Work rN SFPJ
Sanitary Sewer
Storm Sewer
Water Service
Size Material Type
Valuation $5,000.00 Plan Approval $0.00 Permit Fees
issued By
# Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$114.00 [] Permit Voided J
Date 08/14/2003
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contac~ the
easement holder(s).~.~and to secure any necessary~) ~p.~ovals before starting such activity. Date~--/~i~ ~ ~// .~ ~.~
~-- ' ' Agent/O~ner
Address 550 N BLUEMOUND RD APPLETON WI 54914 - 0000 Telephone Number 730-0205
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.