HomeMy WebLinkAbout0104534-Plumbing (extend storm lateral)OSHKOSH
ON THE WATER
.lob Address 2030ALGOMA BLVD
Contractor SAMMONS PLUMBING
Bathtub 0 Shower 0
Whirlpool 0 Floor Drain 0
Lavatory 0 Lndry Tray 0
Toilet 0 Lndry Stndp 0
Res. Sink 0 Disposal 0
Bar Sink 0 Dishwasher 0
Water Heater 0 Sump Pump 0
Site Drain 0 Classrm Sink 0
Roof Drain 0 Breakrm Sink 0
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner B MICHAEL SAMMONS
Category 401 - Residential-Exterior (laterals)
No 104534
Create Date 10/02/2003
Plan
Ejector/Grind 0 DipWell 0 F Prep Sink 0 Gar Drain 0
Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
LocaIWaste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0
CIothesWshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0
Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
Beer Tap 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0
Dent. Oper. 0 Hand Sink 0 Urinal 0 EyeWash Statn 0
Lab Sink 0 Plaster Sink 0 Standp Rec 0
Sterilizer 0 Surgeons Sink 0 Ice Maker 0
Use/Nature EXTEND STORM SEWER LATERAL TO BUILDING
of Work
Sanitary Sewer
Size Material Type
Storm Sewer 4" Plastic Lateral
Water Service
# Conn. Type
0
0
0
0
0
1 New
0
0
0
0
0
0
0
0
0
Valuation $200.00 Plan Approval $0.00 Permit Fees $25.00 ~ Permit Voided
Issued By
Date
10/02/2003
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 522W. MURDOCKAVE OSHKOSH WI 54901 - 2298 Telephone Number
231-9880
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.