Loading...
HomeMy WebLinkAbout0104524 BOSHKOSH ON THE WATER .lob Address 1290 1292 OSBORN AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner GABERT& RUSCH CONSTRUCTION Contractor JONES SIGN Category 254 - Signs No 104524 Create Date 10/02/2003 Plan Type Building (~ Sign (~ Canopy (~ Fence ~ Raze Zoning Unfinished/Basement Finished/Living Garage Foundation Occupancy Permit Park Dedication Poured Concrete Concrete Block Not Required 0 Sq. Ft. 0 Sq. Ft. 0 Sq. Ft. ~ Floating Slab ~ Post Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 (~ Pier (~ Other (~ Treated Wood Flood Plain Height Permit # Dwelling Units 0 # Structures Size ~J Projection I Canopies 0 Signs 0 Use/Nature Office/Install a monument style sign in front yard. 5x6 face, 8' tall, non-illuminated. * Note: Sign to meet 30' setbacks to South and West of Work property lines. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $950.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Date 10/02/2003 Final/O.P. 00/00/0000 Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 711 HINKLE ST GREEN BAY WI 54303 - 4733 Telephone Number 920-494-6740 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.