HomeMy WebLinkAbout0104524 BOSHKOSH
ON THE WATER
.lob Address 1290 1292 OSBORN AVE
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner GABERT& RUSCH CONSTRUCTION
Contractor JONES SIGN
Category 254 - Signs
No 104524
Create Date 10/02/2003
Plan
Type
Building (~ Sign (~ Canopy (~ Fence ~ Raze
Zoning
Unfinished/Basement
Finished/Living
Garage
Foundation
Occupancy Permit
Park Dedication
Poured Concrete
Concrete Block
Not Required
0 Sq. Ft.
0 Sq. Ft.
0 Sq. Ft.
~ Floating Slab
~ Post
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
(~ Pier (~ Other
(~ Treated Wood
Flood Plain Height Permit
# Dwelling Units 0 # Structures
Size
~J Projection I
Canopies 0
Signs 0
Use/Nature Office/Install a monument style sign in front yard. 5x6 face, 8' tall, non-illuminated. * Note: Sign to meet 30' setbacks to South and West
of Work property lines.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$950.00 Plan Approval $0.00 Permit Fee Paid
$20.00 Park Dedication $0.00
Date 10/02/2003 Final/O.P. 00/00/0000
Permit Voided
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 711 HINKLE ST GREEN BAY WI 54303 - 4733 Telephone Number 920-494-6740
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.