HomeMy WebLinkAbout0104525-Building (pylon)OSHKOSH
ON THE WATER
.lob Address 2010-2100 W 9TH AVE
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner TOWER ASSOCIATES LLC
Contractor JONES SIGN
Category 254 - Signs
No 104525
Create Date 10/02/2003
Plan
Type
Building (~ Sign (~ Canopy (~ Fence ~ Raze
Zoning
Unfinished/Basement
Finished/Living
Garage
Foundation
Occupancy Permit
Park Dedication
Poured Concrete
Concrete Block
Not Required
0 Sq. Ft.
0 Sq. Ft.
0 Sq. Ft.
~ Floating Slab
~ Post
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
(~ Pier (~ Other
4'D x 12.5' deep (2)
(~ Treated Wood
Flood Plain Height Permit
# Dwelling Units 0 # Structures
Size
~J Projection I
Canopies 0
Signs 0
Use/Nature Plaza/Remove existing pylon, install new 40' tall pylon. Reuse 8x16 ID sign and 4x8 reader board. Add 8x19.33 illuminated tenant ID sign
of Work )anel. * Note: All signs, including existing panels to be reused shall be listed/approved assemblies.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
UNKNOWN????
Plumbing Contractor
$11,000.00 Plan Approval $0.00 Permit Fee Paid
$68.00 Park Dedication $0.00
Date 10/02/2003 Final/O.P. 00/00/0000
Permit Voided
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 711 HINKLE ST GREEN BAY WI 54303 - 4733 Telephone Number 920-494-6740
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
ZONING/LAND USE COMPLIANCE CHECKLIST
JOB LOCATION: ~ 1'~ ~
PROPERTY OWNER/CONTRACTOR:
ZONING: ~-~- ~_~ ) v~
CONSTRUCTION DATA: New Construction __ Addition
TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.)
COMPLIANCE CHECKLIST
Alteration
DEFICIENT
Use
Lot Width
Lot Area
Lot Area Per Family
Flood Plain
Front Yard
Front Yard Side Street
Rear Yard
Side Yards
Building Area
Parking Standards
__ Off-Street Loading Standards
Vision Clearance
__ Transitional Yard Standards
__ Landscape Standards
Height
Conditions of Approval
Compliance with P.C. or
BZA Conditions of Approval
Signage Standards
· Mechanical Equip. Screening
COMMENTS
REVIEW AUTHORITY
As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or
designee, must approve all plans, except the following: (1) Alterations or interior work when the use is conforming
and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is
conforming and when no change is proposed.
~ APPROVED DENIED
Plan Commission Action Required
Variance(s) Required
REVIEWED BY: .~-'~/~
DATE: