HomeMy WebLinkAboutAECOM proposal Canadian National Railroad storm sewer crossing 14th AvenueAECOM I-�5lu3 � RECEIVED FEB 2 6 2018 DLp I Ol, t-ULLIL WORKS OSHKOSH, WISCONSIN Mr. James Rabe, PE, CPESC Director of Public Works City of Oshkosh 215 Church Avenue Ohskosh, Wisconsin 54903-1130 AECOM 558 North Main Street Oshkosh, W1 54901 aecom.com Date February 26, 2018 AECOM Proposal No. OPP-780172 Proposal to Provide Engineering Services Related to the Proposed Utility Crossing Canadian National Railroad Right -of -Way - Permit Application Associated with the Proposed Storm Sewer Crossing on 14th Avenue located in Oshkosh, Wisconsin Dear Mr. Rabe: AECOM Technical Services, Inc. (AECOM) is pleased to present this proposal to the City of Oshkosh (City) to provide engineering services related to the Canadian National Railroad (CN) utility crossing permit application in Oshkosh, Wisconsin. Project Understanding The City is proposing to install a 96 -inch casing pipe with an 84 -inch storm water carrier pipe in it across the CN railroad right-of-way on 14th Avenue. AECOM has been assisting the City with this permit application by providing supporting documents and technical guidance under the 2017 General Structural Services Contact. The specific scope of work provided is summarized in Project Authorizations, PA -6, 6R and 7. The 2017 General Services Agreement budgets and associated scope of work has been completed and continued engineering services have been requested by the City in 2018. Scope of Services AECOM will provide Engineering services as requested by City staff. In general the services anticipated to be requested will include: • Assist the City in negotiating the utility crossing utilizing the 96 -inch I.D casing pipe. • Selected AECOM staff will attend 6 telephone conferences with the City and CN representatives. • Prepare a utility crossing submittal utilizing the 96 -inch casing pipe with supporting documents to reduce the potential pipe deflection. • Provide structural analysis of various options for casing and carrier pipe reinforcement in an effort to reduce deflection under train engine and car loads. • Review the storm water model to determine the effect of the temporary pipe connection that has been constructed. • Provide additional review of the alternate casing pipe installation methods as proposed by CN. • Provide revised permit applications supporting documents based on CN additional information requests. Applications were revised on December 6 and 21, 2017, and January 22, 2018. • Provide a material coating recommendation to protect the inside of the 84 -inch steel casing carrier pipe. • Attend a preconstruction meeting to review all CN permit requirements. K:\PROPOSAL\City of Oshkosh\OPP-780172_14th Ave CN Crossing\14th Avenue CN Crossing Engineering PP Final 2- 1/5 26-18.docx AECOM Review structural design of junction chamber 14-5, as this structure will be constructed several feet deeper than originally designed. We understand that structure 14-6 will be precast. Review contractor submittals for structures 14-5 and 14-6. Provide engineering assistance during the casing pipe installation in regards to site dewatering, pipe ramming obstruction issues, rail settlement and CN permit requirements. Assumptions 1. The City will provide all pertinent information required to complete the documents. 2. The City will submit the documents to CN and directly pay for all permit fees. 3. The City will perform all field work and notifications recommended in the documents and per CN requirements. 4. The City is responsible to notify AECOM if there are any changes in contractor means and methods or site conditions. If AECOM is required to re-evaluate the documents, a contract amendment will be prepared for City consideration prior to providing any additional Engineering services. 5. AECOM will document the excavation and disposal of the impacted soil under a separate agreement. Deliverable AECOM will provide a draft electronic copy of all memorandums to the City for review. Comments will be addressed and AECOM will provide a final electronic copy to the City for submittal to CN. AECOM proposes a team comprised of Paul Timm, Senior Hydrogeologist; Jeremy Thomas, P.E., Geotechnical Engineer; and Dave Atkins, P.E. Structural Engineer. This proposed project team has been selected to provide the City with AECOM staff that understand the City's expectations, have previous project involvement, have been involved with similar projects, understand respective project responsibilities, are located locally, and provide a reasonable cost approach with sensitivity to overall project cost. Estimated Fees The total estimated fees for this project are $11,500. A detailed breakdown including level of effort is not possible to prepare based on the continually changing CN utility permit requirements, requests for additional information, and changes in the final construction design of the casing and carrier pipe. AECOM will only charge for actual incurred costs. If the project is completed outside of the assumptions AECOM may request to reduce or increase the budget accordingly. Service Estimated Fee Provide Permit Application Assistance $6,500 Provide Engineering Assistance during Installation of the Casing Pipe $5,000 TOTAL ESTIMATED FEES $11,500 The services described in this proposal will be provided on a time and materials basis. The services provided will be performed in accordance with the approved Fee Schedule and the conditions of the 2009 City of Oshkosh Negotiated General Conditions of Service, which are expressly incorporated into, and are an integral part of, our contract for professional services. AECOM can begin providing these services immediately upon receipt of the signed Authorization Form (attached). K:\PROPOSAL\City of Oshkosh\OPP-780172_14th Ave CN Crossing\14th Avenue CN Crossing Engineering PP Final 2- 2/5 26-18.docx AECOM If services to be provided under this proposal require the agents, employees, or contractors of AECOM to enter onto the Project site, the City shall provide right -of -access to the site to AECOM, its employees, agents, and contractors, to conduct the planned field observations or services. We appreciate the opportunity to provide engineering services to the City of Oshkosh. If you have any questions regarding the proposed project approach or corresponding costs, please contact us at your convenience. If you have any questions or need to clarify a point, please call Paul Timm at 920-235-0270. Your rely, Paul Timm Account Manager end: Authorization Form L—inBrefhm, P.E.r-- Associate Vice President CP K:\PROPOSAL\City of Oshkosh\OPP-780172_14th Ave CN Crossing\14th Avenue CN Crossing Engineering PP Final 2- 3/5 26-18.docx AECOM AECOM 558 N Main Street Oshkosh, WI 54901 Authorization February 26, 2018 I hereby certify that the necessary provisions have been made to pay the liability which will accrue under this contract. I hereby authorize AECOM to proceed with the scope of work for providing Engineering Services related to the CN Utility Crossing Permit Application for 14' Avenue located in the City of Oshkosh, Wisconsin as described in AECOM's proposal number OPP-780172 dated February 26, 2018, with a budget au th ization of $11,500 under the general terms and conditions specified in the proposal. 3 e7 IF Sig ure Date Mark A Retrloff Print Name City Manager Title/Organization Signature ' ` Date Pamela R. Ubrig Print Name City Clerk Title/Organization I ture Date Lynn A. Lorenson Print Name City Attorney Title/Organization AR -n-, Signature Trena Larson Print Name Director of Finance Title/Organization K:\PROPOSAL\City of Oshkosh\OPP-780172_14th Ave CN Crossing\14th Avenue CN Crossing Engineering PP Final 2- 4/5 26-18.docx agree to accept invoices from AECOM via e-mail and not postal mail: ❑ Yes Signature: E-mail address: Recipient Mr./Ms.: Return to: Name: Paul Timm 558 North Main Street Address: Oshkosh, WI 54901 Email Paul.Timm@aecom.com Phone: 920.236.6718 K:\PROPOSAL\City of Oshkosh\OPP-780172_14th Ave CN Crossing\14th Avenue CN Crossing Engineering PP Final 2- 5/5 26-18.docx