Loading...
HomeMy WebLinkAbout36. Engineering Service Agreement for Mary Jewell Lift Station Control SystemA& City or Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Mark A. Rohloff, City Manager DATE: March 8, 2018 RE: Engineering Services Agreement for Mary Jewell Lift Station Control System Configuration / CH2M HILL Engineers, Inc. (CH2M HILL) ($39,290) In October 2017, the Common Council awarded City Contract 17-03 Mary Jewell Lift Station and Park Shelter to Miron Construction, Inc. This project includes the installation of a new lift station at Mary Jewell Park, which will eliminate the existing Punhoqua Lift Station. A future project will direct new flows to the Mary Jewell Park Lift Station. Mechanical and electrical equipment will begin to be installed in the next few months at the new lift station. Programming this equipment to work with the existing systems at the Wastewater Treatment Plant (WWTP) is required for this equipment to function properly and to communicate its operating status to the WWTP. AECOM Technical Services, Inc. designed the lift station, in consultation with CH2M HILL, so the instrumentation and control would comply with the WWTP standards. CH2M HILL's programming staff previously assisted the Utility in developing a uniform standard for controls and instrumentation at all lift stations and recently completed a major controls upgrade at the WWTP. Therefore, to ensure the programming of instrumentation and controls matched the Utility's standards, it was agreed during design this work would be best done by CH2M HILL's programming staff. The cost of these services is estimated not to exceed $39,290. This will be funded through the Wastewater Utilty section of the 2017 Capital Improvement Program. Chapter 12 of the Municipal Code of the City of Oshkosh provides that professional services of a specialized nature, including engineering services, may be procured without the use of formal, sealed quotes. In accordance with Section 12-16 of the Code, I am hereby submitting this report regarding this engineering services agreement. MAR/jg I:\Engineering\2017CONTRACTS\17-03Oshkosh Ave Page 1 of 1 Swr\ Project_Information \ Correspondence \ Memo \ 17-03 CH2M Memo -Lift Stat Ctrl Syst Assist_3-8- 18.docx SCOPE OF SERVICES MARCH 8, 201.3 City f Oshkosh Mairy Jewdl Lift Station Cointird SystemCola-f uir tii n As part of the City of Oshkosh (City) Contract No. 17-03 Mary Jewell Lift Station and Park Shelter (Project), CH2M will provide the professional engineering services needed to fulfill the responsibilities of the Configuration Supplier as defined in the Project Contract Documents. 'Task 1.._._.. Configuration SuppNer As Project Control System Configuration Supplier, CH2M will complete the following tasks to assist with the construction, startup and commissioning of the Mary Jewell Lift Station. CH2M will provide the services below in support of the City's Project Engineer (AECOM) and the City's construction Contractor. 1.1 Submittal Review Project submittals will be reviewed and approved by the City's Project Engineer. CH2M will conduct a single review of only the final approved submittals gather and assess the input/output (1/0) interface to the programmable logic controller (PLC). CH2M will conduct an average 1.5 -hours review of each of the following final approved submittals: 11312 —Submersible Non -Clog Pumps 13475 — Data Communication Network Components 13404—Adjustable Speed Drive Equipment 13476 —Uninterruptible Power Supply (UPS) 13420 — Flow Meter (Magnetic) 13478 —Operator Interface Unit (OIU) 13440 — Controls General Provisions for Instrumentation and 13485 — Radio Telemetering Equipment 13442 — Instrumentation and Control Panel Construction 15540 — Fuel Fired Heaters 13452 — Electronic Panel Instruments 15728 — Electrical Room Air Conditioning Units 13453 — Panel and Field Devices 15915 —Automatic Temperature Control Systems 13456 — Bubbler Level System 15940 —Automatic Control Sequences 13459 — Field Electronic Transmitters 16231— Systems Packaged Natural Gas Engine Generator 13464 — Programmable Logic Controller (PLC) 16916 — PC/PLC Control System 13466 — Electronic Analyzers/Detectors 1.2 Software Programming CH2M will configure and program the PLC Panel (PLC -1, PLC -2 and OUI) and modify the existing Oshkosh Wastewater Treatment Plant (WWTP) Supervisory Control And Data Acquisition (SCADA) and telemetry system to add the Mary Jewell Lift Station. Software programming includes the interface to the pumps' adjustable frequency drives, instruments and telemetry radios. The software development estimated level of effort is based on 82 1/0 points per PLC. As part of the software development task, CH2M will participate in four coordination meetings with the City, a total of 16 hours. City input will be incorporated in the software programming. 1.3 In -Factory Tests CH2M will attend 1 -day factory functional testing in the vicinity of Oshkosh of PLC -1, PLC -2 and OU -1. CH2M will document testing observations. 1.4 Field Installation CH2M will provide the following field installation to the City's Project Engineer and Contractor: • 8 hours participation in Contractor's coordination meetings via conference call • 1 day for configuration and operational readiness testing assistance of PLC Panel (PLC -1, PLC -2 and OUI) • 1 day for configuration and operational readiness testing assistance of existing Plant WWTP SCADA (Telemetry PLC and Wonderware HMI) • 2 days for performance acceptance test of PLC Panel (PLC -1, PLC -2 and OUI) • 1 day for performance acceptance test of existing Plant WWTP SCADA (Telemetry PLC and Wonderware HMI) 1.5 Operation & Maintenance Documentation and Training CH2M will provide professional services to support the software and WWTP SCADA system users in the following activities: • Develop documented O&M guidance for the application software • Provide on-site training for the application software • Provide on-site support for the application software changes requested by operating personnel 'Task 2.._._.. Project Management and .uahy As,suirance/ .uahy Contird CH2M will manage the delivery of the project technical services and work products to meet the City's schedule and budget. CH2M will update its project instructions for the project delivery team to reflect revisions to the project schedule and scope. Project instructions addressed include the following: • Detailed scope of services and project deliverables • Project schedule and budget • Health and safety considerations • Communication procedures within the team and with the City CH2M will maintain communication with the City through regular project progress meetings, telephone calls, and e-mail. In addition, project activity reports will be submitted to the City with each monthly invoice. CH2M will conduct quality control/quality assurance reviews of project deliverables, including software programming. All draft deliverables will be reviewed internally before submission to the City. Schedule The anticipated schedule for this scope of services March through September 2018. Leve Of Effort and Compensadon Table 1 presents the estimated professional engineering services level of effort is 249 hours and compensation is $39,290. Table 1. Mary Jewell Lift Station Professional Services Summary Task Description Senior Project Manager QA/QC Reviewer Project Engineer Project Accountant Total Labor Total Hours By Task by Task Total Expense Total by Task Configuration Supplier Hours Hours Hours Hours Hours Submittal Review 2 33 $5,370 35 $100 $5,470 Software Programming 60 $9,000 60 $400 $9,400 In Factory Test Support 10 $1,500 10 $400 $1,900 Field Installation Assistance 50 $7,500 50 $800 $8,300 O&M and Training 50 $7,500 50 $400 $7,900 Subtotal 2 0 203 0 $30,870 205 $2,100 $32,970 PM and QA/QC Hours Hours Hours PM and QA/QC 16 12 16 $6,320 44 $6,320 Subtotal 16 12 0 16 $6,320 44 $0 $6,320 ()TAII Is 3.2. 203 3,6 $37,190 119 ";w2„3,00 $39,290