Loading...
HomeMy WebLinkAboutChange Order No 1 Carl Bowers & Sons 17-20rA City of Oshkosh February 9, 2018 Sue Wood Wood Sewer & Excavating, Inc. E9238 County Road X New London, WI 54961 RE: Change Order No. 1 (Final) Contract 17-20 Dear Ms. Wood: Enclosed is an executed copy of Change Order No. 1 (Final) between the City of Oshkosh and Carl Bowers & Sons Construction Co., Inc. regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, i es Rabe, P.E., CPESC Director of Public Works JER/tlt Enclosure: Change Order No. 1 (Final) cc: Pam Ubrig, City Clerk (w/original) Tara Wendt, Assistant Finance Director (w/copy) File (w/original) I: \ Engineering\ 2017 CONTRACPS \ 17-20 Mini Storm Swr-Storm Lat\ Project_Information \ Contract Info\Change Orders\17-20 Executed CO #1 (Final) Ltr_2-9-18.docx City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 http://www.ci.oshkosh.wi.us Page 1 of 1 TO: WOOD SEWER & EXCAVATING, INC. CHANGE ORDER #1 (FINAL) E9238 COUNTY ROAD X DATE: JANUARY 24, 2018 NEW LONDON, WI 54961 Your present contract with the City of Oshkosh, Contract No. 17-20, awarded June 27, 2017, is hereby amended and changed as follows: NET INCREASE TO: SECTION 1 $22,603.60 NET DECREASE TO: SECTION 1 ($12,574.80) NET INCREASE TO CONTRACT $10,028.80 TOTALS BID TOTAL $333,473.00 $333,473.00 CO #1 $10,028.80 $10,028.80 CONTRACT TOTAL $343,501.80 343,501.80 CITY OF OSHKOSH BY: City Manager City Clerk App ied an accepted - Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as o rm: City ey CONTRACT 17.20 CHANGE ORDER 01 (FINAL) SECTION I ITEM NUMBER DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN TI A T! I A PRICE PRINTRA T P Removing pavement, Square 1100 complete as specified Yards 47.00 241.10 194.10 $10.00 $1,941.00 Removing concrete and asphalt sidewalk and driveway, complete as Square 1120 specified Feet 1,660.00 1,969.00 309.00 $3.00 $927.00 7" concrete pavement removal and replacement; including sawing; pavement ties; integral curb and grading; excavating; 6" CABC; terracing; and traffic control; complete as Square 1308 specified Yards 965.00 924.50 -40.50 $79.60 $3,223.80 Turf restoration, complete as Square 1370 specified Yards 712.00 626.80 -85.20 $10.00 $852.00 4" concrete sidewalk with 3" CABC and grading, complete Square 1500 asspecified Feet 1,080.00 1,368.90 288.90 $6.00 $1,733.40 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading, complete as Square 1510 specified Feet 582.00 806.70 224.70 $7.00 $1,572.90 Curb ramp detectable warning field (natural/non- painted), complete as Square 1540 specified Feet 16.00 4,00 -12.00 $32.00 $384.00 No. 4 reinforcing rods - deformed, epoxy -coated, Linear 1550 complete asspecified Feet 60.00 468.00 408.00 $2.00 $816.00 Drilled No. 4 sidewalk tie bars - deformed, epoxy -coated, 1560 complete asspecified Each 176.00 192.00 16.00 $5.00 $80.00 Sawing existing pavement, Linear 1700 complete asspecified Feet 520.00 865.60 345.60 $3.00 $1,036.80 4" asphaltic pavement with 10" CABC and grading; Square 1906 complete asspecified Yards 47.00 239.90 192.90 $49.00 $9,452.10 Furnish and install 6" storm Linear 2000 sewer; complete asspecified Feet 190.00 173.00 -17.00 $70.00 $1,190.00 Furnish and install 8" storm Linear 2001 sewer; complete asspecified Feet 450.00 409.30 -40.70 $70.00 $2,849.00 Furnish and install 12" storm Linear 2003 sewer; complete asspecified Feet 525.00 501.00 -24.00 $74.00 $1,776.00 Furnish and install Type 3 inlet (with 18" sump); 2237 complete asspecified Each 2.00 2.00 $1,990.00 Furnish and install 6" storm sewer lateral; complete as Linear 2400 specified Feet 1,325.00 1,326.70 1.70 $86.00 $146.20 Furnish and install storm sewer marker balls; complete 2404 asspecified Each 97.00 104.00 7.00 $20.00 $140.00 Furnish and install storm sewer clay dams; complete 2406 asspecified Each 44.00 47.00 3.00 $50.00 $150.00 Furnish and install storm L2408sewer lateral inlet; complete asspecified I Each 1 13.00 1 10.00 1 -3.00 $500.00 $1,500.00 Page 1 of 2 CONTRACT 17.20 CHANGE ORDER #1 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN 7" concrete pavement HES QUANTITY -QUANTITIES _=ffjw_ DECREASE PRICE N T I P Slurry backfill (storm _QQNjH&QZp&gf_ services); complete as Cubic 2412 specified Yards 10.00 0.00 -10.00 $80.00 $800.00 Fumish; install; maintain; and remove Type D modified inlet Square 1-1309 protection; complete as Yards 0.00 30.60 30.60 $86.00 $2,631.60 2508 specified Each 110.00 114.00 4.00 $40.00 $160.00 1-1350 Connect to existing storm Each 0.00 4.00 4.00 $10.00 $40.00 sewer main, complete as Linear 2800 specified Feet 70.00 74.20 4.20 $12.00 $50.40 1-1440 Connect to existing storm Feet 0.00 10.10 10.10 $62.00 $626.20 sewer main, complete as 2850 specified Each 3.00 3.00 1 $220.00 Connect to existing storm sewer lateral, complete as 2852 specified Each 7.00 7.00 $220.00 Connect lateral to existing storm sewer main; complete 2854 asspecified Each 28.00 32.00 4.00 $220.00 $880.00 Fumish, install, maintain, and remove Type D modified inlet protection, complete as 2858 specified Each 7.00 8.00 1.00 $220.00 $220.00 SECTION I (BID ITEMS 1100-2858) - SUBTOTAL $19,305.80 ($12,574.80) ADDITIONAL WORK REQUIRED: CO #1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN 7" concrete pavement HES QUANTITY -QUANTITIES _=ffjw_ DECREASE PRICE N T I P removal and replacement; including sawing; pavement ties; integral curb and grading; turf restoration; and traffic control; complete as Square 1-1309 specified Yards 0.00 30.60 30.60 $86.00 $2,631.60 Pavement ties; complete as 1-1350 specified Each 0.00 4.00 4.00 $10.00 $40.00 30" curb and gutter 7" with 5" CABC and grading; complete Linear 1-1440 asspecified Feet 0.00 10.10 10.10 $62.00 $626.20 ADDITIONAL WORK REQUIRED: CO #1 - (ITEMS 1-1309 -1-1440) - SUBTOTAL $3,297.80 $0.00 NET INCREASE TO: SECTION 1 $10,028.80 NET INCREASE TO SECTION $22,603.60 NET DECREASE TO SECTION ($12,574.80) NET INCREASE TO CONTRACT: $10,028.80 Page 2 of 2