February 9, 2018
Sue Wood
Wood Sewer & Excavating, Inc.
E9238 County Road X
New London, WI 54961
RE: Change Order No. 1 (Final)
Contract 17-20
Dear Ms. Wood:
Enclosed is an executed copy of Change Order No. 1 (Final) between the City of Oshkosh and
Carl Bowers & Sons Construction Co., Inc. regarding the abovementioned project.
If you have any questions, please call our office at (920)236-5065.
Sincerely,
i
es Rabe, P.E., CPESC
Director of Public Works
JER/tlt
Enclosure: Change Order No. 1 (Final)
cc: Pam Ubrig, City Clerk (w/original)
Tara Wendt, Assistant Finance Director (w/copy)
File (w/original)
I: \ Engineering\ 2017 CONTRACPS \ 17-20 Mini Storm Swr-Storm Lat\ Project_Information \ Contract
Info\Change Orders\17-20 Executed CO #1 (Final) Ltr_2-9-18.docx
City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 http://www.ci.oshkosh.wi.us
Page 1 of 1
TO: WOOD SEWER & EXCAVATING, INC. CHANGE ORDER #1 (FINAL)
E9238 COUNTY ROAD X DATE: JANUARY 24, 2018
NEW LONDON, WI 54961
Your present contract with the City of Oshkosh, Contract No. 17-20, awarded June 27, 2017, is hereby
amended and changed as follows:
NET INCREASE TO: SECTION 1
$22,603.60
NET DECREASE TO: SECTION 1
($12,574.80)
NET INCREASE TO CONTRACT
$10,028.80
TOTALS
BID TOTAL $333,473.00
$333,473.00
CO #1 $10,028.80
$10,028.80
CONTRACT TOTAL $343,501.80
343,501.80
CITY OF OSHKOSH
BY:
City Manager
City Clerk
App ied an accepted -
Contractor
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Change Order.
Comptroller
Approved as o rm:
City ey
CONTRACT 17.20 CHANGE ORDER 01 (FINAL)
SECTION I
ITEM
NUMBER
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
TI
A T!
I A
PRICE
PRINTRA
T P
Removing pavement,
Square
1100
complete as specified
Yards
47.00
241.10
194.10
$10.00
$1,941.00
Removing concrete and
asphalt sidewalk and
driveway, complete as
Square
1120
specified
Feet
1,660.00
1,969.00
309.00
$3.00
$927.00
7" concrete pavement
removal and replacement;
including sawing; pavement
ties; integral curb and
grading; excavating; 6"
CABC; terracing; and traffic
control; complete as
Square
1308
specified
Yards
965.00
924.50
-40.50
$79.60
$3,223.80
Turf restoration, complete as
Square
1370
specified
Yards
712.00
626.80
-85.20
$10.00
$852.00
4" concrete sidewalk with 3"
CABC and grading, complete
Square
1500
asspecified
Feet
1,080.00
1,368.90
288.90
$6.00
$1,733.40
6" concrete sidewalk/
driveway/ramp with 3" CABC
and grading, complete as
Square
1510
specified
Feet
582.00
806.70
224.70
$7.00
$1,572.90
Curb ramp detectable
warning field (natural/non-
painted), complete as
Square
1540
specified
Feet
16.00
4,00
-12.00
$32.00
$384.00
No. 4 reinforcing rods -
deformed, epoxy -coated,
Linear
1550
complete asspecified
Feet
60.00
468.00
408.00
$2.00
$816.00
Drilled No. 4 sidewalk tie bars
- deformed, epoxy -coated,
1560
complete asspecified
Each
176.00
192.00
16.00
$5.00
$80.00
Sawing existing pavement,
Linear
1700
complete asspecified
Feet
520.00
865.60
345.60
$3.00
$1,036.80
4" asphaltic pavement with
10" CABC and grading;
Square
1906
complete asspecified
Yards
47.00
239.90
192.90
$49.00
$9,452.10
Furnish and install 6" storm
Linear
2000
sewer; complete asspecified
Feet
190.00
173.00
-17.00
$70.00
$1,190.00
Furnish and install 8" storm
Linear
2001
sewer; complete asspecified
Feet
450.00
409.30
-40.70
$70.00
$2,849.00
Furnish and install 12" storm
Linear
2003
sewer; complete asspecified
Feet
525.00
501.00
-24.00
$74.00
$1,776.00
Furnish and install Type 3
inlet (with 18" sump);
2237
complete asspecified
Each
2.00
2.00
$1,990.00
Furnish and install 6" storm
sewer lateral; complete as
Linear
2400
specified
Feet
1,325.00
1,326.70
1.70
$86.00
$146.20
Furnish and install storm
sewer marker balls; complete
2404
asspecified
Each
97.00
104.00
7.00
$20.00
$140.00
Furnish and install storm
sewer clay dams; complete
2406
asspecified
Each
44.00
47.00
3.00
$50.00
$150.00
Furnish and install storm
L2408sewer
lateral inlet; complete
asspecified I
Each 1
13.00 1
10.00 1
-3.00
$500.00
$1,500.00
Page 1 of 2
CONTRACT 17.20 CHANGE ORDER #1 (FINAL)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
7" concrete pavement HES
QUANTITY
-QUANTITIES
_=ffjw_
DECREASE
PRICE
N T I
P
Slurry backfill (storm
_QQNjH&QZp&gf_
services); complete as
Cubic
2412
specified
Yards
10.00
0.00
-10.00
$80.00
$800.00
Fumish; install; maintain; and
remove Type D modified inlet
Square
1-1309
protection; complete as
Yards
0.00
30.60
30.60
$86.00
$2,631.60
2508
specified
Each
110.00
114.00
4.00
$40.00
$160.00
1-1350
Connect to existing storm
Each
0.00
4.00
4.00
$10.00
$40.00
sewer main, complete as
Linear
2800
specified
Feet
70.00
74.20
4.20
$12.00
$50.40
1-1440
Connect to existing storm
Feet
0.00
10.10
10.10
$62.00
$626.20
sewer main, complete as
2850
specified
Each
3.00
3.00
1
$220.00
Connect to existing storm
sewer lateral, complete as
2852
specified
Each
7.00
7.00
$220.00
Connect lateral to existing
storm sewer main; complete
2854
asspecified
Each
28.00
32.00
4.00
$220.00
$880.00
Fumish, install, maintain, and
remove Type D modified inlet
protection, complete as
2858
specified
Each
7.00
8.00
1.00
$220.00
$220.00
SECTION I (BID ITEMS 1100-2858) - SUBTOTAL $19,305.80 ($12,574.80)
ADDITIONAL WORK REQUIRED: CO #1
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
7" concrete pavement HES
QUANTITY
-QUANTITIES
_=ffjw_
DECREASE
PRICE
N T I
P
removal and replacement;
including sawing; pavement
ties; integral curb and
grading; turf restoration; and
traffic control; complete as
Square
1-1309
specified
Yards
0.00
30.60
30.60
$86.00
$2,631.60
Pavement ties; complete as
1-1350
specified
Each
0.00
4.00
4.00
$10.00
$40.00
30" curb and gutter 7" with 5"
CABC and grading; complete
Linear
1-1440
asspecified
Feet
0.00
10.10
10.10
$62.00
$626.20
ADDITIONAL WORK REQUIRED: CO #1 - (ITEMS 1-1309 -1-1440) - SUBTOTAL $3,297.80 $0.00
NET INCREASE TO: SECTION 1 $10,028.80
NET INCREASE TO SECTION
$22,603.60
NET DECREASE TO SECTION
($12,574.80)
NET INCREASE TO CONTRACT:
$10,028.80
Page 2 of 2